ML19183A154

From kanterella
Jump to navigation Jump to search
Inspection Manual Change Notice 19-021
ML19183A154
Person / Time
Issue date: 07/02/2019
From: Bridget Curran
NRC/NRR/DIRS/IRGB
To:
Curran B
Shared Package
ML19183A015 List:
References
CN 19-021
Download: ML19183A154 (1)


Text

NRC INSPECTION MANUAL DIRS Change Notice 19-021 DELETED: TRANSMITTED:

Number Date Number Date

1. IMC 1248 App I 04/19/13 IMC 1248 App I 07/02/19
2. IMC 2506 02/20/17 IMC 2506 07/02/19
3. IP 87123 11/25/03 IP 87123 07/02/19 TRAINING: No special training is required for any documents issued with this Change Notice.

REMARKS: IMC 1248 Appendix I, Training Requirements and Qualification Journal for Uranium Project Managers and Technical Reviewers, has been revised to capture Uranium Recovery Project Manager and Technical Reviewer activities.

IMC 2506, Construction Reactor Oversight Process General Guidance and Basis Document, has been revised to reflect changes and refinements in program scope, including the inspection guidance associated with operational programs and the 10 CFR 52.103(g) finding and communication process.

IP 87123, Well Logging Programs, has been revised to ensure inspectors assess the potential for licensees to aggregate materials as part of routine inspections.

EDITORIAL REVISIONS FROM PREVIOUS CHANGE NOTICES (As Required):

DISTRIBUTION:

Standard Official Use Only (OUO)-Security Related Information.

Please contact: _______________ Phone: ________

END Issue Date: 07/02/19 1 19-021