| Site: | Consolidated Interim Storage Facility |
| Issue date: | 06/28/2019 |
| From: | Matthews T Consolidated Interim Storage Facility, Morgan, Morgan, Lewis & Bockius, LLP |
| To: | Gary Arnold, Paul Ryerson, Nicholas Trikouros Atomic Safety and Licensing Board Panel |
| SECY RAS | |
| Shared Package | |
| ML19179A306 | List: |
| References | |
| 72-1050-ISFSI, ASLBP 19-959-01-ISFSI-BD01, E-54423, RAS 55064 | |
| Download: ML19179A307 (3) | |
Text
Timothy P. Matthews Partner
+1.202.739.5527 timothy.matthews@morganlewis.com Morgan, Lewis & Bockius LLP 1111 Pennsylvania Avenue, NW Washington, DC 20004
+1.202.739.3000 United States
+1.202.739.3001 June 28, 2019 Paul S. Ryerson, Chairman Nicholas G. Trikouros Gary S. Arnold Atomic Safety and Licensing Board U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Docket:
Interim Storage Partners LLC (WCS Consolidated Interim Storage Facility),
Docket No. 72-1050-ISFSI Re:
Licensing Board Notification Regarding ISP Letter E-54423
Dear Administrative Judges:
In accordance with its obligation to inform the Licensing Board of relevant developments,1 Interim Storage Partners LLC (ISP) hereby notifies the Board and the hearing participants that, on June 28, 2019, it submitted, to the U.S. Nuclear Regulatory Commission (NRC) Staff, ISP Letter E-54423, which contains ISPs partial response to the NRC Staffs First Request for Additional Information (RAI), Part 3, issued on April 23, 2019. Letter E-54423 transmits ISPs responses to Transportation (TR) RAIs TR-1 through TR-10. In responding to the Transportation RAIs, ISP reviewed the original RADTRAN calculation and decided to regenerate the basis transportation evaluation consistent with the TN Americas Quality Assurance Requirements for licensing activities. As noted in the Letter, although there are small changes to the evaluations output values, the conclusions remain the same as in the original evaluation described in Section 4.2 of the ER. Specifically, estimated radiological impacts for both incident-free transportation and accidents for shipments to and from the proposed ISP facility are small and well below background doses, consistent with conclusions reached in previous studies conducted by the NRC.
As a result, ISP has prepared a revised Attachment 4-1 to the Environmental Report (ER). The revised -1, titled Explanation of Transportation Analysis, supersedes and fully replaces the original -1, titled Transportation Evaluation. In addition, ISP has prepared corresponding revisions to ER Sections 4.2.6 (Radiological Impacts of Transportation), 4.2.7 (Transportation Routes), and 4.2.8 (Impacts from Transportation Accidents). Finally, ISP also has revised ER Section 4.2.9 (Nonradiological Impacts) consistent with its response to RAI TR-9.
1 See Duke Power Co. (William B. McGuire Nuclear Station, Units 1 & 2), ALAB-143, 6 AEC 623, 625 (1973).
Paul S. Ryerson, Chairman June 28, 2019 Page 2 The above-referenced Letter, RAI responses, revised ER Sections, and revised Attachment 4.1 are attached hereto. The Board and hearing participants may view portions of the revised ER Sections and -1 as relevant to Joint Petitioners (Dont Waste Michigan et al.) Proposed Contention 1, Sierra Clubs Proposed Contentions 4 and 16, and/or ISPs answers to those proposed contentions.
Respectfully submitted, Executed in accord with 10 C.F.R. § 2.304(d)
Timothy P. Matthews, Esq.
MORGAN, LEWIS & BOCKIUS LLP 1111 Pennsylvania Ave., NW Washington, D.C. 20004 Phone: (202) 739-5527 Fax: (202) 739-3001 E-mail: timothy.matthews@morganlewis.com Counsel for Interim Storage Partners LLC
Enclosures:
- 1. ISP Letter E-54423
- 3. ER Changed Pages (Sections 4.2.6 through 4.2.9 and Attachment 4-1)
DB1/ 104785326 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of:
INTERIM STORAGE PARTNERS LLC (WCS Consolidated Interim Storage Facility)
)
)
)
)
)
)
)
Docket No. 72-1050-ISFSI June 28, 2019 CERTIFICATE OF SERVICE Pursuant to 10 C.F.R. § 2.305, I certify that, on this date, the foregoing Licensing Board Notification Regarding ISP Letter E-54423 and corresponding enclosures were served upon the Electronic Information Exchange (the NRCs E-Filing System), in the above-captioned proceeding.
Signed (electronically) by Ryan K. Lighty Ryan K. Lighty, Esq.
MORGAN, LEWIS & BOCKIUS LLP 1111 Pennsylvania Avenue, N.W.
Washington, D.C. 20004 Phone: (202) 739-5274 Fax: (202) 739-3001 E-mail: ryan.lighty@morganlewis.com Counsel for Interim Storage Partners LLC