ZS-2019-0043, Transmittal of Revised Final Status Survey Report - Phase 1

From kanterella
(Redirected from ML19178A109)
Jump to navigation Jump to search
Transmittal of Revised Final Status Survey Report - Phase 1
ML19178A109
Person / Time
Site: Zion  File:ZionSolutions icon.png
Issue date: 06/21/2019
From: Gerard van Noordennen
ZionSolutions
To:
Document Control Desk, Office of Nuclear Material Safety and Safeguards
Shared Package
MML19178A106 List:
References
ZS-2019-0043
Download: ML19178A109 (3)


Text

~

~ ~ ~ ~ ~ ~ ~ -ZIONSOLUTIONSL-LC~ ~ ~ ~ ~ ~ ~ - An EnergySolufion.s eonv,any June 21, 2019 ZS-2019-0043 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Zion Nuclear Power Station, Units 1 and 2 Facility Operating License Nos. DPR-39 and DPR-48 NRC Docket Nos. 50-295 and 50-304

Subject:

Revised Final Status Survey Report - Phase 1

References:

1) Gerard van Noordennen, ZionSolutions, Letter to U.S . Nuclear Regulatory Commission, "Final Status Survey Final Report - Phase 1," dated November 1, 2018
2) John B. Hickman, U.S. Nuclear Regulatory Commission, Letter to John Sauger, EnergySolutions, " Zion Nuclear Power Station Units 1 and 2 - Review of Final Status Survey Report - Phase 1," dated March 22, 2019
3) Gerard van Noordennen, ZionSolutions, Letter to U.S. Nuclear Regulatory Commission, "Final Status Survey (FSS) Report Phase 1 Request for Additional Information," dated May 14, 2019 ZionSolutions (ZS) submitted Final Status Survey (FSS) Report, Phase 1, for Nuclear Regulatory Commission (NRC) review on November 1, 2018, as documented in Reference 1. During the report review, the NRC staff identified several issues prohibiting completion of the review. The NRC requested additional information and corrections as documented in Reference 2.

In Reference 3, ZS provided a detailed response to the issues identified and committed to a number of actions to be taken to correct the errors in the report and to prevent recurrence.

Regulatory Commitment #7 in Enclosure 2 of Reference 3 was to resubmit the revised Final Status Survey (FSS) Report -Phase 1 addressing the errors. The revised FSS Report - Phase 1 is included as the enclosure to this letter.

There are no regulatory commitments made in this submittal. If you should have any questions regarding this submittal, please contact me at (860) 462-9707.

Respectfully, 0MA-,e,j_ ~ -- ~~

Gerard van N oordennen Senior Vice President Regulatory Affairs 101 Shiloh Boulevard, Zion

  • IL 60099 (224) 789-4016
  • Fax: (224) 789-4008
  • www.zionsolutionscompany.com

ZionSolutions, LLC ZS-2019-0043 Page 2 of2 Attachments:

Attachment 1 - Final Status Survey Final Report - Phase 1, Revision 1 Attachment 2 - Preflight Report

Enclosure:

Enclosure 1: CD contains Final Status Survey Final Report - Phase 1 & Appendices, Revisions 1 cc: John Hickman, U.S. NRC Senior Project Manager Regional Administrator, U.S. NRC, Region III Service List (Cover letter only, no attachments and enclosure)

Zion Nuclear Power Station, Unit 1 and 2 License Transfer Service List cc:

Ken Robuck Steven A. Reynolds President and CEO Manager, Nuclear Facility Inspection EnergySolutions Division of Nuclear Safety 299 South Main Street, Suite 1700 Illinois Emergency Management Agency Salt Lake City, UT 84111 245 W. Roosevelt Road, Units 55 & 56 West Chicago, Illinois 60185 John Sauger President and Chief Nuclear Officer Kelly F. Grahn, Senior Health Physicist ReactorD&D Illinois Emergency Management Agency EnergySolutions Division of Nuclear Safety 121 W. Trade Street, Suite 2700 245 W Roosevelt Road, Building 8, Suite 55 Charlotte, NC 28202 West Chicago, IL 60185 Bruce Hinkley William P. Mazzeno Senior Vice President Emergency Management Coordinator D&D Operations Lake County Emergency Management Agency EnergySolutions 1303 N. Milwaukee Avenue 121 W. Trade Street, Suite 2700 Libertyville, IL 60048-1308 Charlotte, NC 28202 John E. Matthews Gerard van Noordennen Morgan, Lewis & Bockius LLP Senior VP Regulatory Affairs 1111 Pennsylvania Avenue, NW EnergySolutions Washington, DC 20004 121 W. Trade Street, Suite 2700 Charlotte, NC 28202 Jerry Houff General Manager ZionSolutions, LLC 2701 Deborah Avenue Zion, IL 60099 Russ Workman General Counsel EnergySolutions 299 South Main Street, Suite 1700 Salt Lake City, UT 84111