ML19177A366

From kanterella
Jump to navigation Jump to search
BWXT Nuclear Operations Group (Nog) Calendar Year 2020 Inspection Schedule - Public Letter
ML19177A366
Person / Time
Site: BWX Technologies
Issue date: 06/25/2019
From: Eric Michel
NRC/RGN-II/DFFI
To: Burch B
BWXT
References
Download: ML19177A366 (4)


Text

OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 June 25, 2019 Mr. B. Joel Burch Vice President and General Manager BWXT Nuclear Operations Group, Inc.

P.O. Box 785 Lynchburg, VA 24505-0785

SUBJECT:

BWXT NUCLEAR OPERATIONS GROUP (NOG) - CALENDAR YEAR 2020 SAFEGUARDS INSPECTION SCHEDULE

Dear Mr. Burch:

Enclosed is the schedule of inspections to be performed by the U.S. Nuclear Regulatory Commission (NRC) inspectors at BWXT Nuclear Operations Group, Inc. (NOG) facility in Lynchburg, VA for calendar year 2020. The inspection schedule is provided in advance to minimize the resource impact on your staff and allow for the resolution of any scheduling conflicts and personnel availability issues, well in advance of inspector arrival onsite.

Please note that inspections related to non-safeguards are included in a separate letter. In addition, any regional initiative or other reactive inspection is not included. If circumstances arise which cause the NRC inspectors to change the dates of the planned inspections, we will contact you to discuss the change as early as possible. Please contact Noel Pitoniak at (404) 997-4634 with any questions or concerns you may have regarding this letter or the inspection schedule.

Enclosure(s) transmitted herewith contain(s) SUNSI. When separated from enclosure(s),

this transmittal document is decontrolled.

LIMITED INTERNAL DISTRIBUTION PERMITTED OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION

OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION B. Burch 2 In accordance with Title 10 of the Code of Federal Regulations Section 2.390 of the NRCs Rules of Practice and Procedure, this letter and its enclosure contain sensitive information, and therefore, are exempt from public disclosure.

Sincerely,

/RA/

Eric C. Michel, Chief Projects Branch 2 Division of Fuel Facility Inspection Docket No. 70-27

Enclosure:

BWXT NOG CALENDAR YEAR 2020 SAFEGUARDS INSPECTION SCHEDULE cc: (See page 3)

OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION

OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION B. Burch 3 cc:

Joel W. Duling, President BWXT Nuclear Operations Group, Inc.

2016 Mount Athos Road Lynchburg, VA 24505 Christopher T. Terry, Manager Licensing and Safety Analysis BWXT Nuclear Operations Group, Inc.

P.O. Box 785 Lynchburg, VA 24505-0785 Steve Harrison, Director Division of Radiological Health Department of Health 109 Governor Street, Room 730 Richmond, VA 23219 OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION

ML19177A366 SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DFFI RII:DFFI RII:DFFI NAME T. Sippel N. Pitoniak E. Michel DATE 6/25/2019 6/25/2019 6/25/2019 E-MAIL COPY? YES NO YES NO YES NO