ML19172A140

From kanterella
Jump to navigation Jump to search
2020 Urenco Inspection Schedule (Non-Safeguards)
ML19172A140
Person / Time
Site: 07003103
Issue date: 06/21/2019
From: Robert Williams
NRC/RGN-II
To: Cowne S
Louisiana Energy Services, URENCO USA
References
Download: ML19172A140 (5)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 June 21, 2019 Stephen R. Cowne, Chief Nuclear Officer and Compliance Manager URENCO USA P.O. Box 1789 Eunice, NM 88231

SUBJECT:

LOUISIANA ENERGY SERVICES, LLC (LES), dba URENCO USA (UUSA) -

CALENDAR YEAR 2020 INSPECTION SCHEDULE

Dear Mr. Cowne:

Enclosed is the schedule of inspections to be performed by the U.S. Nuclear Regulatory Commission (NRC) inspectors at the URENCO USA facility for calendar year 2020. The inspection schedule is provided in advance to minimize the resource impact on your staff and allow for the resolution of any scheduling conflicts and personnel availability issues, well in advance of inspector arrival onsite.

Please note that inspections related to Safeguards are not included in this schedule. In addition, any regional initiative or other reactive inspection is not included. If circumstances arise which cause the NRC inspectors to change the dates of the planned inspections, we will contact you to discuss the change as early as possible. Please contact Brannen Adkins at (404) 997-4620 or Lindsey Cooke at (404) 997-4836 with any questions or concerns you may have regarding this letter or the inspection schedule.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice and Procedure, a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA: Eric C. Michel for/

Robert E. Williams, Jr., Chief Projects Branch 1 Division of Fuel Facility Inspection Docket No. 70-3103 License No. SNM-2010

Enclosure:

2020 LES Inspection Schedule cc: (See Page 2)

S. Cowne 2 cc:

Butch Tongate, Cabinet Secretary New Mexico Department of Environment Office of the Secretary 1190 St. Francis Drive P.O. Box 26110 Santa Fe, NM 87502-0157 Billy Hobbs, Mayor City of Eunice P.O. Box 147/1106 Ave J Eunice, NM 88231 The Honorable Sam D. Cobb, Mayor City of Hobbs 200 E. Broadway Hobbs, NM 88240 Stephen Aldridge, Mayor City of Jal P.O. Drawer 340 Jal, NM 88252 Chair Rebecca Long Lea County Board of County Commissioners Lea County Courthouse 100 North Main Avenue, Suite 4 Lovington, NM 88260 Daniel F. Stenger, Counsel Hogan Lovells VP LLP 555 13th Street, NW Washington, DC 20004 Santiago Rodriguez, Chief Radiation Controls Bureau NM Environment Department PO Box 5469 Santa Fe, NM 87502-5469 (cc: contd on page 3)

S. Cowne 3 (cc: contd)

Karen Fili, Managing Director UUSA, President and Chief Executive Officer Louisiana Energy Services, LLC URENCO USA P.O. Box 1789 Eunice, NM 88231 Karen.Fili@Urenco.com Lisa Hardison, Manager of Communications and Public Relations Communications and Public Relations Louisiana Energy Services, LLC URENCO USA P.O. Box 1789 Eunice, NM 88231 Lisa.Hardison@urenco.com Richard Goorevich, Director of Government Affairs Government Affairs Louisiana Energy Services, LLC URENCO Ltd.

1560 Wilson Blvd. Suite 300 Arlington, VA 22209 Richard.Goorevich@urenco.com Perry Robinson, Outside General Counsel URENCO USA P.O. Box 1789 Eunice, NM 88231 Perry.Robinson@urenco.com Richard A. Ratliff, PE, LMP Radiation Program Officer Bureau of Radiation Control Department of State Health Services Division for Regulatory Services 1100 West 49th Street Austin, TX 78756-3189

ML19172A140 SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DFFI RII:DFFI RII:DFFI SIGNATURE BJA LVC7 ECM2 for REW1 NAME B. Adkins L. Cooke R. Williams DATE 6/202019 6/20/2019 6/ /2019 E-MAIL COPY? YES NO YES NO YES NO

LOUISIANA ENERGY SERVICES, LLC (URENCO USA) 2020 INSPECTION/ACTIVITY PLAN SCHEDULE NRC Inspection 1 Dates February 24 - 28, 2020 Number of Inspectors 3 IP 88020 Operational Safety Inspection Procedures (IPs) IP 88015 Nuclear Criticality Safety IP 88025 Maintenance and Surveillance of Safety Controls NRC Inspection 2 Dates May 18 - 22, 2020 Number of Inspectors 3 IP 88035 Radioactive Waste Processing, Handling, Storage, and Transportation Inspection Procedures (IPs)

IP 88045 Effluent Control and Environmental Protection IP 88030 Radiation Protection (Appendix A)

NRC Inspection 3 Dates July 13 - 17, 2020 Number of Inspectors 3 IP 88161 Corrective Action Program (CAP)

Inspection Procedures (IPs)

Implementation at Fuel Cycle Facilities NRC Inspection 4 Dates August 10 - 14, 2020 Number of Inspectors 2 IP 88050 Emergency Preparedness Inspection Procedures (IPs)

IP 88055 Fire Protection (Annual)

NRC Inspection 5 Dates November 16 - 20, 2020 Number of Inspectors 3 IP 88020 Operational Safety Inspection Procedure (IP) IP 88015 Nuclear Criticality Safety IP 88070 Plant Modifications (Annual)

Enclosure