NRC Technical Review Group Results for Emergency Diesel Generators 1
Robert Wolfgang, P.E.
U.S. Nuclear Regulatory Commission robert.wolfgang@nrc.gov 301-415-2263 Joint Emergency Diesel Generator Owners Group Conference July 8 - 12, 2019 ML19171A420
Disclaimer 2
This presentation was prepared by staff of the U.S.
Nuclear Regulatory Commission (NRC). It may present information that does not currently represent an agreed upon NRC staff position. NRC has neither approved nor disapproved the technical content.
=
Background===
3
- The Technical Review Groups (TRGs) were created to provide support to the NRC Operating Experience (OpE)
Program.
- Purpose of TRGs is to identify issues, negative trends, and recurrences and to glean OpE insights and lessons learned that could be applied to NRC programs.
- Lessons learned from Davis Besse (NRC failed to connect the dots and effectively apply OpE).
- Various NRC offices have representatives in the TRGs.
- There are currently 25 TRGs.
What TRGs Review 4
- TRGs review OpE in their technical discipline:
- OpE Comms
- Inspection Findings
- 10 CFR 50.73 Licensee Event Reports
- 10 CFR 50.72 Event Notifications
- International OpE
- 10 CFR 21 Reports
- INPO Consolidated Event System (ICES)
Accomplishments From TRG Reviews
- Generic Communications issued or proposed
- Change to Standard Review Plan guidance
- Inspection procedure changes
- Vendor inspections
- Periodic OpE newsletters
- COMM updates
- Issues for Resolution
- Regional presentations
- Management briefings 5
2019 Results for TRG for Electrical Power Systems (EDGs Mechanical) 6 Event Cause 2019 2018 2017 Procedures 4
0 3
Tests 0
0 0
Design 3
8 8
Human Factors 4
10 9
Part 21 1
1 1
Fire 4
2 7
FME 1
0 2
Leak 5
4 15 Broken/Failed Part 12 11 20
2019 Results for TRG for Electrical Power Systems (EDGs Mechanical)
Event Cause 2019 2018 2017 Corrosion 2
1 1
Governor 0
0 1
International 3
1 0
7
QUESTIONS?