This document becomes an NRC Official Agency Record once it is signed by the Branch Chief
NRC FORM 591M PART 1
(07-2012)*
U.S. NUCLEAR REGULATORY COMMISSION
SAFETY INSPECTION REPORT AND COMPLIANCE INSPECTION
1. LICENSEE/LOCATION INSPECTED:
2. NRC/REGIONAL OFFICE
Super Asphalt Pavement Corp.
P.O. Box 1849
Guaynabo, PR 00970-1849
U.S. Nuclear Regulatory Commission
Region I, 2100 Renaissance Blvd, Suite 100
King of Prussia, Pennsylvania 19406-2713
REPORT NUMBER(S)
2019-001
3. DOCKET NUMBER(S)
4. LICENSE NUMBER(S)
5. DATE(S) OF INSPECTION
030-35472
52-25537-01
May 20, 2019
LICENSEE:
The inspection was an examination of the activities conducted under your license as they relate to radiation safety and to compliance with the Nuclear
Regulatory Commission (NRC) rules and regulations and the conditions of your license. The inspection consisted of selective examinations of
procedures and representative records, interviews with personnel, and observations by the inspector. The inspection findings are as follows:
X 1. Based on the inspection findings, no violations were identified.
2. Previous violation(s) closed.
3. The violation(s), specifically described to you by the inspector as non-cited violations, are not being cited because they were self-
identified, non-repetitive, and corrective action was or is being taken, and the remaining criteria in the NRC Enforcement Policy, to
exercise discretion, were satisfied.
Non-cited violation(s) were discussed involving the following requirement(s) and corrective action(s):
4. During this inspection, certain of your activities, as described below and/or attached, were in violation of NRC requirements and are being
cited in accordance with the NRC Enforcement Policy. This form is a NOTICE OF VIOLATION, which may be subject to posting in
accordance with 10 CFR 19.11. (Violations and Corrective Actions)
Statement of Corrective Actions
I hereby state that, within 30 days, the actions described by me to the Inspector will be taken to correct the violations identified. This statement of
corrective actions is made in accordance with the requirements of 10 CFR 2.201 (corrective steps already taken, corrective steps which will be taken,
date when full compliance will be achieved). I understand that no further written response to NRC will be required, unless specifically requested.
Title
Printed Name
Signature
Date
LICENSEES REPRESENTATIVE
NRC INSPECTOR
6/10/2019
Michael Reichard
Signed by: Michael C. Reichard
NA
BRANCH CHIEF
6/17/2019
X Arthur L Burritt
Signed by: NRC-PIV
N/A
- NRC FORM 591M PART 1 (07-2012) (RI Rev. 09/12/2013)
G:\\WBL Documents\\WBL Inspection Records\\R52-25537-01.2019001.591M-Part1 DigitalSig-Public B1.doc
SUNSI Review Completed By:
X
Public
X
Non-Sensitive