ML19164A126

From kanterella
Jump to navigation Jump to search

Correction of Amendment No. 235 Adoption of TSTF-542, Revision 2, Reactor Pressure Vessel Water Inventory Control
ML19164A126
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 06/21/2019
From: John Lamb
Plant Licensing Branch II
To: Gayheart C
Southern Nuclear Operating Co
Lamb J 415-3100
References
EPID L-2017-LLA-0215
Download: ML19164A126 (4)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 June 21, 2019 Ms. Cheryl A. Gayheart Regulatory Affairs Director Southern Nuclear Operating Co., Inc.

3535 Colonnade Parkway Birmingham, AL 35243

SUBJECT:

EDWIN I. HATCH NUCLEAR PLANT, UNIT NO. 2 - CORRECTION OF AMENDMENT NO. 235 RE: ADOPTION OF TSTF-542, REVISION 2, "REACTOR PRESSURE VESSEL WATER INVENTORY CONTROL (EPID L-2017-LLA-0215)

Dear Ms. Gayheart:

On May 31, 2018, the U.S. Nuclear Regulatory Commission (NRC) issued Amendment No. 235 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML18123A368) to Renewed Facility Operating License NPF-5 for the Edwin I. Hatch Nuclear Plant (HNP) Unit No. 2. The amendment replaced the existing requirements in several technical specifications (TSs) related to operations with a potential for draining the reactor vessel with revised TSs providing alternative requirements in new TS 3.5.2, "Reactor Pressure Vessel (RPV) Water Inventory Control," and associated changes.

The NRC staff has confirmed that Amendment No. 235 for HNP, Unit No. 2 contained a typographical error on TS page 3.5-8 in Required Action D.1 states "TAF or~ 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />" instead of "TAF for~ 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />."

The NRC staff found that the markup of page TS 3.5-8 correctly had "for" in Required Action D.1 in the licensee's letter dated April 20, 2017 (ADAMS Accession No. ML17114A377), and determined that the error was inadvertently introduced and were not the subject of the amendment or the associated notice to the public. Therefore, consistent with NRC staff guidance dated January 16, 1997 (ADAMS Accession No. ML103260096), based on the NRC's policy established by SECY-96-238, these errors can be corrected by a letter to the licensee from the NRC staff.

Enclosed please find the corrected HNP, Unit No. 2 TS page 3.5-8. This correction does not change any of the conclusions in the safety evaluation associated with Amendment No. 235.

C. Gayheart If you have any questions, please contact me at 301-415-3100 or John.Lamb@nrc.gov.

Sincerely, n G. Lamb, Senior Project Manager nt Licensing Branch 11-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No.: 50-366

Enclosure:

As stated cc: Listserv

RPV Water Inventory Control 3.5.2 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME C. (continued) AND C.3 Verify required standby 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> gas treatment subsystem(s) are capable of being placed in operation in less than the DRAIN TIME D. DRAIN TIME < 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />. D.1 -----NOTE----

Required ECCS injection/spray subsystem or additional method of water injection shall be capable of operating without offsite electrical power.

Initiate action to Immediately establish an additional method of water injection with water sources capable of maintaining RPV water level > TAF for ;::: 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />.

AND D.2 Initiate action to Immediately establish secondary containment boundary.

AND D.3 Initiate action to isolate Immediately each secondary containment penetration flow path or verify it can be manually isolated from the control room.

(continued)

HATCH UNIT 2 3.5-8 Amendment No. 235

ML19164A126 OFFICE NRR/D0RL/LPL2-1/PM NRR/D0RL/LPL2-1/LA NRR/D0RL/LPL2-1 /BC NRR/D0RL/LPL2-1 /PM NAME Jlamb KGoldstein MMarkley Jlamb DATE 6/13/19 6/21/19 6/21/19 6/21/19