L-MT-19-033, Thirty-Day Report of Changes in Emergency Core Cooling System Evaluation Models Pursuant to 10 CFR 50.46

From kanterella
(Redirected from ML19158A452)
Jump to navigation Jump to search
Thirty-Day Report of Changes in Emergency Core Cooling System Evaluation Models Pursuant to 10 CFR 50.46
ML19158A452
Person / Time
Site: Monticello Xcel Energy icon.png
Issue date: 06/07/2019
From: Church C
Northern States Power Company, Minnesota, Xcel Energy
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
L-MT-19-033
Download: ML19158A452 (2)


Text

(l Xcel Energy*

RESP O N $ I 8 L E 8 Y H AT URE* 2807 West County Road 75 Monticello, MN 55362 June 7, 2019 L-MT-19-033 10 CFR 50.46(a)(3)(ii)

ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Monticello Nuclear Generating Plant Docket No. 50-263 Renewed Facility Operating License No. DPR-22 Thirty-Day Report of Changes in Emergency Core Cooling System Evaluation Models Pursuant to 10 CFR 50.46

References:

1) Letter from NSPM to NRC, Thirty Day Report of Changes in the Emergency Core Cooling System Evaluation Models Pursuant to 10 CFR 50.46, (L-MT-19-003), dated January 28, 2019 (ADAMS Accession No ML19028A256)
2) Framatome Report ANP-3720P Revision 0, Monticello LOCA MAPLHGR Limits for EPU/EFW with ATRIUM 10XM Fuel and Revised ECCS Modeling Parameters, January 2019 Northern States Power Company, a Minnesota corporation, doing business as Xcel Energy (hereafter NSPM), in accordance with 10 CFR 50.46, Acceptance criteria for emergency core cooling systems for light-water nuclear power reactors, is submitting this thirty-day report which reflects the results of a reanalysis performed with the Emergency Core Cooling System (ECCS) evaluation models for the Monticello Nuclear Generating Plant (MNGP). On January 28, 2019, NSPM submitted a thirty-day report (Reference 1) concerning changes or errors identified in the ECCS evaluation for the MNGP.

In January 2019, a reanalysis was completed by Framatome, Inc. in accordance with the NRC approved Loss of Coolant Accident (LOCA) evaluation models for the MNGP (Reference 2).

This reanalysis incorporated existing changes and corrected errors in the evaluation models reflecting the fuel designs for the current operating cycle that began on May 12, 2019, and those projected for an equilibrium cycle of ATRIUM' 10XM fuel. The results demonstrate that MNGP operation within the Maximum Average Planar Linear Heat Generation Rate (MAPLHGR) limit ensures that the LOCA response acceptance criteria in 10 CFR 50.46 are satisfied. This new MAPLHGR analysis supersedes prior MNGP MAPLHGR analyses and establishes a new baseline LOCA analysis of record for the ATRIUM' 10XM fuel.

Document Control Desk NSPM Page 2 The resulting licensing basis Peak Cladding Temperature (PCT) is 2125°F for the ATRIUM' 10XM fuel. This PCT is 75°F below the 2200°F acceptance criterion of 10 CFR 50.46(b)(1).

Should you have questions regarding this letter, please contact Mr. Richard Loeffler at (612) 342-8981.

Summary of Commitments This letter makes no new commitments and no revisions to existing commitments.

Christopher R. Church Site Vice President, Monticello Nuclear Generating Plant Northern States Power Company - Minnesota cc: Administrator, Region Ill, USNRC Project Manager, Monticello, USNRC Resident Inspector, Monticello, USNRC