Text

ES-301 Operating Test Qualitv Checklist Form ES-301-3 Facilitv: Dresden Generating Station Date of Examination: 4/8/19 Operating Test Number: 2019-301

1. General Criteria lnitials a

b*

c a.

The operating test conforms to the previously approved outline; changes are consistent with samolino reouirements (e.o,. 10 CFB 55.45. operational imoortance, safetv function distribution).

/

h/il\\ 6 b.

There is no day-to-day repetition between this and other operating tests to be administered durinq this examination.

/

ürrû 6 c.

The ooeratino test shall not duolicate items from the apolicants'audít test(s) (see Section D.1.4.), v {/{w A d

Overlap with the written examination and betvveen different parts of the operating test is within acceptable limits.

/

rl{ 6 e.

It appears that the operating test will ditferentiate between competent and less-than-competent applicants at the desiqnated license level.

/

ilft'jv G

2. Walkthrouqh Criteria a.

Each JPM includes the following, as applicable:

initial conditions initiating cues references and tools, including associated procedures reasonable and validated time limits (average time allowed for completion) and specific designation if deemed to be time critical by the facility licensee operationally important specific performance criteria that include-detailed expected actons with exact criteria and nomenclature system response and other examiner cues statements describing important observations to be made by the applicant criteria for successful completion ol the task identification of critical steps and their associated performance standards restrictions on the seouence of steos. if aoolicable

/

CINl q b.

Ensure that any changes from the previously approved systems and administrative walkthrough outlines (Forms ES-301-1 and ES-301-2) have not caused the test to deviate from any of the acceptance criteria (e.9., item distribution, bank use, repetition from the last two NRC examinations) soecified on those forms and Form ES-201-2.

r,t\\ G

3. Simulator Criteria The associated simulator operating tests (scenario sets) have been reviewed in accordance wth Form ES-301-4, and a coov is attached.

/

ür$ Ç Date a.

b.

c.

d.

Author Facility Reviewer (-)

NRC Chief Examiner (#)

I I

NRC Supervisor <{*

. The facilig licensee signature is not applicable for NRC-developed tests.

  1. The independent NRC reviewer initials items in column "c": the chief examiner concurrence is required