Annual Radiological Environmental Operating Report 76 January 1, 2018 Through December 31, 2018
ML19154A579
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 05/31/2019
From: Herr M
Exelon Generation Co
To:
Document Control Desk, Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation
References
Download: ML19154A579 (1)


Text

,.,,,

=' Exelon Generation~

May 31, 2019 U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555-0001 Peach Bottom Atomic Power Station Units 2 and 3 Independent Spent Fuel Storage Installation (ISFSI)

Facility Operation License DPR-12, DPR-44 and DPR-56 NRC Docket 50-171, 50-277 and 50-278 and ISFSI Docket 72-29

Subject:

Annual Radiological Envir.onmental Operating Report 76 January 1, 2018 through December 31, 2018 In accordance with the requirements of Section 5.6.2 of the Peach Bottom Atomic Power Station (PBAPS), Units 2 and 3 Technical Specifications, this letter submits the Annual Radiological Environmental Operation Report 76. This report provides the 2018 results for the Radiological Environmental Monitoring Program (REMP) as called for in the Offsite Dose Calculation Manual.

In assessing the data collected for the REMP, we have concluded that the operation of PBAPS, Units 2 and 3, had no adverse impact on the environment. There are no commitments contained in this letter.

If you have any questions or require additional information, please do not hesitate to contact Dr. Amber Donley at 717-456-3056.

Sincerely, Ma~~::ger Peach Bottom Atomic Power Station MJH/MR/SMO/GRS/KH/ASD/asd Enclosure (1) cc: USN RC Region I, Regional Administrator (Daniel H. Dorman)

USN RC Senior Resident Inspector, PBAPS (Justin Heinly)

USN RC Region I Inspector (James R. Cassata)

CCN 19-69