ML19148A575

From kanterella
Jump to navigation Jump to search
Energy Solutions Biennial 10 CFR 72.48 Report for the Fuelsolutions Storage System
ML19148A575
Person / Time
Site: 07201026
Issue date: 05/20/2019
From: Gerard van Noordennen
Energy Solutions
To:
Document Control Desk, Office of Nuclear Material Safety and Safeguards
References
CD19-0104
Download: ML19148A575 (2)


Text

"'

'I!-*

-~

~~~~~~~ENERGYSOLUTIONs~~~~~~~

May 20, 2019

(

U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555-0001

Subject:

Biennial §72.48 Report for the FuelSolutions' Storage System CD19-0104

Reference:

U.S. Nuclear Regulatory Commission, Certificate of Compliance for Spent Fuel Storage Casks, Model No.: FuelSolutions', Certificate No. 1026, Docket No. 72-1026.

In accordance with the requirements of 10 CFR 72.48 (d)(2), EnergySolutions hereby notifies

  • NRC that it has not implemented any changes, tests, and experiments to the Fue1Solutions' Storage System under the provisions of 10-CFR 72.48 since the previous biennial update.

Should you or any member of your staff have quest,ons, please contact the undersigned at (860) 462-9707.

Sincerely,

{;~'Y-?l.._ ~

Gerry van Noordennen Senior Vice President Regulatory Affairs cc:

Jose Cuadrado-Caraballo, NRC NMSS SFM Aleksandr Gelfond, EnergySolutions 250 Berryhill Road, Suite 400

1.

803.256.0450

  • Fax 803.772.0626*www.energysout10ns.com

.I

.\\

Service List:

Mr'. Brian Smith NextEra Energy Point Beach Nuclear Plant 661 0 Nuclear Road Two Rivers, WI 54241-9516 Brian.Smith@nexteraenergy.com Mr. Wesley Jacobson Entergy Arkansas Nuclear One 1448 State Road 333 Russellville, AR 72801 spyle@entergy.com Mr. Tim Crocker Entergy Nuclear Operations, Inc.

Palisades Nuclear Plant 27780 Blue Star Memorial Hwy.

Covert,MI49043-0930 tcrocke@entergy.com Ms. Suzanne Leblang Entergy Nuclear Operations, Inc.

Palisades Nuclear Plant 27780 Blue Star Memorial Hwy.

Covert, MI 49043-0930 slebla2@entergy.com CDI9-0104 Page 2 of2