Text
OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION
OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION
Enclosure transmitted herewith
contains SUNSI. When separated
from enclosure, this transmittal
document is decontrolled.
May 27, 2019
Mr. John Dent, Jr.
Vice President-Nuclear and CNO
Nebraska Public Power District
Cooper Nuclear Station
72676 648A Avenue
P.O. Box 98
Brownville, NE 68321
SUBJECT:
COOPER NUCLEAR STATION - NRC CYBER SECURITY INSPECTION
REPORT 05000298/2019410
Dear Mr. Dent:
On February 28, 2019, the U.S. Nuclear Regulatory Commission (NRC) completed the onsite
portion of an inspection at Cooper Nuclear Station. On April 17, 2019, the NRC inspectors
discussed the results of this inspection with Mr. K. Dia, Acting Vice President-Nuclear and Chief
Nuclear Officer, and other members of your staff. The results of this inspection are documented
in the enclosed report.
NRC inspectors documented two findings of very low security significance (Green) in this report.
The findings involved violations of NRC requirements. The NRC is treating these violations as
non-cited violations consistent with Section 2.3.2 of the Enforcement Policy.
If you contest the violations or significance of these non-cited violations, you should provide a
response within 30 days of the date of this inspection report, with the basis for your denial, to
the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington,
DC 20555-0001; with copies to the Regional Administrator, Region IV; the Director, Office of
Enforcement; and the NRC resident inspector at Cooper Nuclear Station.
If you disagree with any cross-cutting aspect assignment in this report, you should provide a
response within 30 days of the date of this inspection report, with the basis for your
disagreement, to the U. S. Nuclear Regulatory Commission, ATTN: Document Control Desk,
Washington, DC, 20555-0001; with copies to the Regional Administrator, Region IV; and the
NRC resident inspector at Cooper Nuclear Station.
OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION
J. Dent
2
OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION
This letter will be made available for public inspection and copying at
http://www.nrc.gov/reading-rm/adams.html and the NRC Public Document Room in accordance
with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding. However, the
enclosed report contains Security-Related Information, so the enclosed report will not be made
publicly available in accordance with 10 CFR 2.390(d)(1). If you choose to provide a response
that contains Security-Related Information, please mark your entire response Security-Related
Information-Withhold from public disclosure under 10 CFR 2.390, in accordance with
10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1).
The NRC is waiving the affidavit requirements for your response in accordance with
Sincerely,
/RA/
Nicholas H. Taylor, Chief
Project Branch B
Division of Reactor Projects
Docket No. 50-298
License No. DPR-46
Non-Public Enclosure:
NRC Inspection Report 05000298/2019410
cc: Mr. Jerry Bebb
Security Manager
Nebraska Public Power District
Cooper Nuclear Station
72676 648A Avenue
P.O. Box 98
Brownville, NE 68321
Entire Report:
ADAMS:
Non-Publicly Available
Non-Sensitive
Keyword:
SUNSI Review By: GAP Yes No
Publicly Available
Sensitive _______ MD 3.4 A.3
ADAMS ACCESSION NUMBER: ML19148A479
Cover Letter Only:
ADAMS:
Non-Publicly Available
Non-Sensitive
Keyword:
SUNSI Review By: GAP Yes No
Publicly Available
Sensitive
OFFICE
SRI:EB2
RI:EB2
C:PBC
BC:PBB
NAME
GPick
SMakor
NTaylor
JKozal
NTaylor
SIGNATURE
/RA/
/RA/
/RA/
/RA/
/RA/
DATE
05/17/2019
05/16/2019
05/20/2019
5/24/2019
5/27/2019