ML19148A479

From kanterella
Jump to navigation Jump to search
NRC Cyber Security Inspection Report 05000298/2019410
ML19148A479
Person / Time
Site: Cooper Entergy icon.png
Issue date: 05/27/2019
From: Nick Taylor
NRC/RGN-IV/DRP/RPB-B
To: Dent J
Nebraska Public Power District (NPPD)
Taylor N
References
IR 2019410
Download: ML19148A479 (3)


See also: IR 05000298/2019410

Text

OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION

OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION

Enclosure transmitted herewith

contains SUNSI. When separated

from enclosure, this transmittal

document is decontrolled.

May 27, 2019

Mr. John Dent, Jr.

Vice President-Nuclear and CNO

Nebraska Public Power District

Cooper Nuclear Station

72676 648A Avenue

P.O. Box 98

Brownville, NE 68321

SUBJECT:

COOPER NUCLEAR STATION - NRC CYBER SECURITY INSPECTION

REPORT 05000298/2019410

Dear Mr. Dent:

On February 28, 2019, the U.S. Nuclear Regulatory Commission (NRC) completed the onsite

portion of an inspection at Cooper Nuclear Station. On April 17, 2019, the NRC inspectors

discussed the results of this inspection with Mr. K. Dia, Acting Vice President-Nuclear and Chief

Nuclear Officer, and other members of your staff. The results of this inspection are documented

in the enclosed report.

NRC inspectors documented two findings of very low security significance (Green) in this report.

The findings involved violations of NRC requirements. The NRC is treating these violations as

non-cited violations consistent with Section 2.3.2 of the Enforcement Policy.

If you contest the violations or significance of these non-cited violations, you should provide a

response within 30 days of the date of this inspection report, with the basis for your denial, to

the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington,

DC 20555-0001; with copies to the Regional Administrator, Region IV; the Director, Office of

Enforcement; and the NRC resident inspector at Cooper Nuclear Station.

If you disagree with any cross-cutting aspect assignment in this report, you should provide a

response within 30 days of the date of this inspection report, with the basis for your

disagreement, to the U. S. Nuclear Regulatory Commission, ATTN: Document Control Desk,

Washington, DC, 20555-0001; with copies to the Regional Administrator, Region IV; and the

NRC resident inspector at Cooper Nuclear Station.

OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION

J. Dent

2

OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION

This letter will be made available for public inspection and copying at

http://www.nrc.gov/reading-rm/adams.html and the NRC Public Document Room in accordance

with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding. However, the

enclosed report contains Security-Related Information, so the enclosed report will not be made

publicly available in accordance with 10 CFR 2.390(d)(1). If you choose to provide a response

that contains Security-Related Information, please mark your entire response Security-Related

Information-Withhold from public disclosure under 10 CFR 2.390, in accordance with

10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1).

The NRC is waiving the affidavit requirements for your response in accordance with

10 CFR 2.390(b)(1)(ii).

Sincerely,

/RA/

Nicholas H. Taylor, Chief

Project Branch B

Division of Reactor Projects

Docket No. 50-298

License No. DPR-46

Non-Public Enclosure:

NRC Inspection Report 05000298/2019410

cc: Mr. Jerry Bebb

Security Manager

Nebraska Public Power District

Cooper Nuclear Station

72676 648A Avenue

P.O. Box 98

Brownville, NE 68321

ML19148A476

Entire Report:

ADAMS:

Non-Publicly Available

Non-Sensitive

Keyword:

SUNSI Review By: GAP Yes No

Publicly Available

Sensitive _______ MD 3.4 A.3

ADAMS ACCESSION NUMBER: ML19148A479

Cover Letter Only:

ADAMS:

Non-Publicly Available

Non-Sensitive

Keyword:

SUNSI Review By: GAP Yes No

Publicly Available

Sensitive

NRC-002

OFFICE

SRI:EB2

RI:EB2

BC

C:PBC

BC:PBB

NAME

GPick

SMakor

NTaylor

JKozal

NTaylor

SIGNATURE

/RA/

/RA/

/RA/

/RA/

/RA/

DATE

05/17/2019

05/16/2019

05/20/2019

5/24/2019

5/27/2019