ML19134A284

From kanterella
Jump to navigation Jump to search

Correction Letter for Amendment Nos. 264 and 267 to Adopt TSTF-547, Clarification of Rod Position Requirements
ML19134A284
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 05/22/2019
From: Mahesh Chawla
Plant Licensing Branch III
To: Nazar M
Point Beach
Chawla M,
References
EPID L-2018-LLA-0207
Download: ML19134A284 (6)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 May 22, 2019 Mr. Mano Nazar President and Chief Nuclear Officer Nuclear Division NextEra Energy Point Beach, LLC Mail Stop: EX/JB 700 Universe Blvd Juno Beach, FL 33408

SUBJECT:

POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 - CORRECTION LETTER FOR AMENDMENT NOS. 264 AND 267 TO ADOPT TSTF-547, "CLARIFICATION OF ROD POSITION REQUIREMENTS" (EPID L-2018-LLA-0207)

Dear Mr. Nazar:

On March 27, 2019 (Agencywide Documents Access and Management System Accession (ADAMS) Accession No. ML19052A544), the U.S. Nuclear Regulatory Commission (NRC) issued Amendment Nos. 264 and 267 to Renewed Facility Operating License Nos. DPR-24 and DPR-27 for the Point Beach Nuclear Plant (PNBP) Units 1 and 2, respectively.

The amendments revised the PBNP, Units 1 and 2, technical specifications (TS) to provide time to repair rod movement failures that do not affect rod operability, correct conflicts between the TS, increase consistency between the subject TS, and improve the format and presentation.

The changes are consistent with NRG-approved Technical Specifications Task Force (TSTF)

Change Traveler TSTF-547, Revision 1, "Clarification of Rod Position Requirements."

Following issuance of the amendments, the NRC staff was informed by the licensee regarding the following errors in the TS pages:

1. Page 3.1.4 The required action B.2.5 is incorrect. The required action was changed to B.5, and other formatting changes were made.
2. Page 3.1.6 The word "overlap" is missing in the required action A.3. The required action A.3 needs to be revised to: "Restore the control bank to within the insertion sequence, and overlap limits specified in the COLR." In addition, other formatting changes were made.

The NRC staff determined that these errors were entirely administrative in nature, and were inadvertently introduced, and did not affect the associated notice to the public. Thus, according to the NRC's policy established by SECY-96-238 (ADAMS No. 9611250030 (Legacy Library)),

these errors can be corrected by a letter. Enclosed, please find the replacement TS pages.

These corrections do not change any of the conclusions in the safety evaluation associated with the amendments. We regret any inconvenience this may have caused.

M. Nazar If you have any questions regarding this matter, I may be reached at 301-415-8371.

Sincerely, Mahesh L. Chawla, Project Manager Plant Licensing Branch Ill Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-266 and 50-301

Enclosure:

Corrected TS Pages cc: Listserv

Enclosure Technical Specification Pages

Rod Group Alignment Limits 3.1.4 ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME B. One rod not within B.1.1 Verify SOM to be within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> alignment limits. the limits provided in the COLR.

OR B.1.2 Initiate boration to 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> restore SOM to within limit.

AND 8.2 Reduce THERMAL 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> POWER to ~ 75% RTP.

AND 8.3 Verify SOM to be within Once per the limits provided in 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> the COLR.

AND 8.4 Perform SR 3.2.1.1, 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> 3.2.1.2, and 3.2.2.1.

AND 8.5 Re-evaluate safety 5 days analyses and confirm results remain valid for duration of operation under these conditions.

C. Required Action and C.1 Be in MODE 3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time of Condition B not met.

(continued)

Point Beach 3.1.4-2 Unit 1 - Amendment No. 264 Unit 2 - Amendment No. 267

Control Bank Insertion Limits 3.1.6 3.1 REACTIVITY CONTROL SYSTEMS 3.1.6 Control Bank Insertion Limits LCO 3.1.6 Control banks shall be within the insertion, sequence, and overlap limits specified in the COLR.


---- -- -- -- ------- -- ---- -- ----- --- NOTE -- --- ------- ---- ----- -- ------ --- -- ----- -- ---

Not applicable to control banks inserted while performing SR 3.1.4.2.

APPLICABILITY: MODE 1, MODE 2 with ken~ 1.0.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. Control bank A, B, or C A.1 Verify all shutdown 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> inserted s 10 steps banks are within the beyond the insertion, insertion limits specified sequence, or overlap in the COLR.

limits specified in the COLR. AND 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> A.2.1 Verify SOM is within the limits specified in the COLR.

OR 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> A.2.2 Initiate boration to restore SOM to within limit.

AND 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> A.3 Restore the control bank to within the insertion, sequence, and overlap limits specified in the COLR.

(continued}

Point Beach 3.1.6-1 Unit 1 - Amendment No. 264 Unit 2 - Amendment No. 267

ML19134A284 *via email OFFICE DORL/LPL3-1/PM DORL/LPL3-1 /LA DSS/SRXB/BC*

NAME MChawla SRohrer JWhitman DATE 5/22/19 5/22/19 5/16/19 OFFICE DSS/STSB/BC(A)* DORL/LPL3-1 /BC DORL/LPL3-1 /PM NAME PSnyder DWrona MChawla DATE 5/16/19 5/22/19 5/22/19