ML19128A228

From kanterella
Jump to navigation Jump to search
LTR-19-0192 Tom Gurdziel, E-mail 31 Vogtle 3 & 4 April 2019 Pictures
ML19128A228
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 05/07/2019
From: Tom Gurdziel
Public Commenter
To: Kristine Svinicki
NRC/Chairman
Shared Package
ML19128A229 List:
References
LTR-19-0192
Download: ML19128A228 (1)


Text

CHAIRMAN Resource From:

Sent:

To:

Tom Gurdziel <tgurdziel@twcny.rr.com>

Tuesday, May 07, 2019 9:37 PM techols@psc.state.ga.us Cc:

Subject:

Bridget Frymire; 'Ed Stronski'; Esberg, John R:(GenCo-Nuc); Screnci, Diane; CHAIRMAN Resource

[External_Sender] 31 Vogtle 3 & 4 April 2019 Pictures Hi Tim, I enjoyed viewing the progress evident in these pictures.

Can you send these questions to somebody?

3 of 31 Why is it necessary to protect the ends of those horizontal re bar? I don't think it should be necessary. (That costs money.)

6 of 31 Why isn't concrete higher on the Unit 3 containment?

9 of 31 Is there still a need for the Lampson blue crane? I thought it was gone.

10 of 31 Is there really a need for those exotic-looking diagonal braces at the top left of the picture?

11 of 31 Same comment. Are we buying artwork or a functional building?

12 of 31 Can't read the caption on the bottom of the picture.

14 of 31 What is all that material on the Turbine Building roof? It's not overloaded, is it?

17 of 31 I would feel a lot better if the concrete on the containment building was a lot higher.

23 of 31 What are those orange colored collars on the ends of the horizontal reinforcing rods?

24 of 31 Wasn't I complaining (two years ago) about not having the siding installed on at least part of the Turbine Building. Is that all that has been installed?

26 of 31 Unusual and nice picture.

Thank you, Tom j 0 :§,JS.J Virus-free. www.avast.com 1