ML19107A035
| ML19107A035 | |
| Person / Time | |
|---|---|
| Site: | Prairie Island |
| Issue date: | 03/19/2019 |
| From: | Sharp S Northern States Power Company, Minnesota, Xcel Energy |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| L-Pl-19-011 | |
| Download: ML19107A035 (1) | |
Text
ENCLOSURES - WITHHOLD FROM PUBLIC DISCLOSURE IN ACCORDANCE WITH 10 CFR 2.390 Xcel Energy RESPONSIBLE BY NATURE MAR 19 2019 A TIN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Prairie Island Nuclear Generating Plant, Units 1 and 2 Docket Nos. 50-282 and 50-306 Renewed Facility Operating License Nos. DPR-42 and DPR-60 Revised Prairie Island Nuclear Generating Plant Emergency Plan 1717 Wakonade Drive Welch, MN 55089 L-Pl-19-011 10 CFR 50.54(q)
Northern States Power Company, a Minnesota corporation, doing business as Xcel Energy (hereafter "NSPM"), hereby submits a revision to the Prairie Island Nuclear Generating Plant Emergency Plan (enclosure 2).
The changes to the Emergency Plan were assess under the requirements of 10 CFR 50.54(q)
- and were deterrnined not to result in a.reduction in the effectiveness of the Emergency Plan.
In addition, as required by 10 CFR 50.54(q)(5), enclosure 1 oft.he submittal includes a summary analysis of the change to the Emergency Plan. The information contained in the.
enclosures should be withheld in accordance with 10 CFR 2.390.
Summary of Commitments k.,,,.l~
commitments and no revisions to existing commitme~ts:
Scott Sharp Site Vice President, Prairie Island Nucl.ear Generating* Plant Northern States Power Company - Minnesota Enclosure (2).
cc:
NRG Administrator, Region Ill, USNRC (with enclosure)
NRG Project Manager (w/o enclosure)
)tx4S tJ;e. t..
Resident Inspector, Prairie Island Nuclear Generating Plant, USNRC (w/o enclosures)
ENCLOSURES - WITHHOLD FROM PUBLIC DISCLOSURE IN ACCORDANCE WITH 10 CFR 2.390