|
---|
Category:Letter
MONTHYEARML23234A1232024-03-28028 March 2024 US600 DC and SDA 50.46 Exemption - Letter ML23180A1512023-06-29029 June 2023 LLC, Request for Exemption to the Reporting Requirements of 10 CFR 50.46(a)(3) ML21102A3072021-04-15015 April 2021 OEDO-21-00155 - Lessons-Learned from the Design Certification Review of the NuScale Power, LLC, Small Modular Reactor ML21050A4312021-02-19019 February 2021 LLC - Lessons-Learned from the Design Certification Review of the NuScale Power, LLC Small Modular Reactor ML20247J5642020-09-11011 September 2020 Standard Design Approval for the NuScale Power Plant Based on the NuScale 600 Standard Plant Design Certification Application ML20231A8042020-08-28028 August 2020 Final Safety Evaluation Report for the NuScale Standard Plant Design ML20224A4602020-08-25025 August 2020 OEDO-20-00292-Response to the Advisory Committee on Reactor Safeguards Letter on NuScale Power, LLC, Report on the Safety Aspects of the NuScale Small Modular Reactor ML20231A5982020-08-25025 August 2020 OEDO-20-00285_NuScale Area of Focus - Boron Redistribution ML20210M8902020-07-29029 July 2020 Area of Focus - Boron Redistribution ML20195A5872020-07-13013 July 2020 LLC - Submittal of Draft Operator Licensing and Examination Standard for NuScale Small Modular Reactors ML20195C7662020-07-13013 July 2020 LLC Request for Standard Design Approval Based on the NuScale Standard Plant Design Certification Application ML20192A3262020-07-10010 July 2020 LLC, Submittal of Environmental Report: Revision Status ML20198M3932020-07-0202 July 2020 LLC Submittal of Revised Packing Slip for Submittal of the NuScale Standard Plant Design Certification Application, Revision 4.1, Dated June 19, 2020 ML20174A3472020-07-0101 July 2020 OEDO-20-00220 - Area of Focus - Probabilistic Risk Assessment and Emergency Core Cooling System Valve Performance ML20184A2872020-07-0101 July 2020 LLC Submittal of Presentation Materials Entitled ACRS Full Committee Presentation: NuScale Topic - Boron Redistribution and General Design Criterion 33, PM-0720-70785, Revision 0 ML20181A2702020-06-22022 June 2020 Final SER for NuScale TR-0516-49422 Loss-of-Coolant Analysis Model, Rev 2 (Letter) ML20181A4322020-06-22022 June 2020 Final SER for NuScale TR-0516-49416 NON-Loss-of-Coolant Analysis Model, Rev 3 (Letter) ML20198M3922020-06-19019 June 2020 LLC - Submittal of the NuScale Standard Plant Design Certification Application, Revision 4.1 ML20171A7312020-06-19019 June 2020 LLC, Submittal of Riser Flow Hole Methodology and Associated Changes to Final Safety Analysis Report Incorporating Its Use ML20157A2232020-06-0303 June 2020 Letter to NuScale Requesting -A for TR-0716-50350 ML20150C5172020-05-29029 May 2020 LLC Submittal of Presentation Materials Entitled NRC Public Meeting Presentation: Boron Redistribution and Associated Design and DCA Changes, PM-0620-70336, Revision 0 ML20150E1772020-05-29029 May 2020 LLC - Submittal of Presentation Materials Entitled ACRS Full Committee Presentation: NuScale Topic - Extended Dhrs Operation and RCS Boron Redistribution (Closed Session), PM-0620-70243, Revision 0 ML20150C8812020-05-29029 May 2020 LLC Submittal of Presentation Materials Entitled ACRS Full Committee Presentation: NuScale Topic - Boron Redistribution and Associated Design and DCA Changes, PM-0620-70244, Revision 0 ML20149M1192020-05-28028 May 2020 LLC Summary of Impacts to Erai 8930 Response and Discussion on the Exemption from General Design Criterion 33 ML20141L8082020-05-20020 May 2020 LLC Submittal of Containment Response Analysis Methodology Technical Report, TR-0516-49084, Revision 3 ML20141N0122020-05-20020 May 2020 LLC Submittal of Changes to Final Safety Analysis Report, Section 6.2, Containment Systems, Section 6.3, Emergency Core Cooling System, and Technical Report TR-0516-49084, Containment Response Analysis Methodology Technical Report ML20141L8162020-05-20020 May 2020 LLC, Submittal of Long-Term Cooling Methodology, TR-0916-51299, Revision 3 ML20141M7642020-05-20020 May 2020 LLC Submittal of Nuclear Steam Supply System Advanced Sensor Technical Report, TR-0316-22048, Revision 3 ML20141L7872020-05-20020 May 2020 LLC, Submittal of Second Updates to Standard Plant Design Certification Application, Revision 4 ML20141M1142020-05-20020 May 2020 LLC Submittal of NuScale Instrument Setpoint Methodology Technical Report, TR-0616-49121, Revision 3 ML20141L8042020-05-20020 May 2020 LLC Submittal of Technical Specifications Regulatory Conformance and Development, TR-1116-52011, Revision 4 ML20128J3162020-05-18018 May 2020 OEDO-20-00167 - Response to the ACRS Letter on Combustible Gas Monitoring ML20133K0882020-05-12012 May 2020 LLC, Submittal of Presentation Materials Entitled Public Meeting Presentation: Topic - Emergency Core Cooling System (ECCS) Boron Distribution (Closed Session), PM-0420-69512, Revision 0 ML20133J9142020-05-11011 May 2020 LLC Submittal of Presentation Materials Entitled Public Meeting Presentation: Topic - Emergency Core Cooling System (ECCS) Boron Distribution, PM-0420-69511, Revision 0 ML20112F4552020-05-0101 May 2020 LLC, Design Certification Application Phases 5 and 6 Review Status ML20107F8492020-05-0101 May 2020 OEDO-2000140 - NuScale Area of Focus - Helical Tube Steam Generator Design ML20104A0792020-04-27027 April 2020 OEDO-20-00115 - Safety Evaluation Report for Topical Report TR-0516-49416, Revision 2, Non-Loss-of-Coolant Accident Analysis Methodology ML20099H0802020-04-0808 April 2020 LLC - Submittal of Presentation Materials Entitled NRC Public Meeting: Revisions to NuScales EPZ Sizing Methodology Topical Report, PM-0420-69598, Revision 0 ML20098G2372020-04-0707 April 2020 Nuscale Power, LLC Submittal of Remaining Closure Items for the Emergency Core Cooling System Valve Failure Mode Effects Analysis Audit Items ML20097F1922020-04-0606 April 2020 Nuscale Power, LLC Submittal of Presentation Materials Entitled ACRS Full Committee Presentation: Nuscale Topic - Hydrogen/Oxygen Monitoring, PM-0420-69518, Revision 0 ML20094H6742020-04-0303 April 2020 LLC Submittal of Presentation Materials Entitled ACRS Full Committee Presentation NuScale Topic-Probabilistic Risk Assessment with a Focus on Emergency Core Cooling System Analysis PM-0420-69559, Revision 0 ML20092L8992020-04-0101 April 2020 LLC - Submittal of Updates to Standard Plant Design Certification Application, Revision 4 ML20072M6682020-03-30030 March 2020 Response to NuScale Letter Dated February 24, 2020, on Planned SDA Application Content ML20072H3332020-03-0909 March 2020 LLC - Submittal of Presentation Materials Entitled Public Meeting Presentation: Topic - Emergency Core Cooling System (ECCS) Boron Distribution, PM-0320-69218, Revision 0 ML20057D9002020-03-0606 March 2020 Submittal of Errata to Final SE for NuScale Power, LLC TR-1010-859-NP-A, Quality Assurance Program Description for the NuScale Power Plant ML20062F7262020-03-0505 March 2020 Request for Withholding Information from Public Disclosure for Nuscale Power, LLC Letter Public ML20069A9632020-03-0404 March 2020 LLC Submittal of Presentation Materials Entitled ACRS Full Committee Presentation: NuScale Topical Report, Loss-of-Coolant Accident Evaluation Model, PM-0320-69138, Revision 0 ML20069A1772020-03-0404 March 2020 LLC - Submittal of Presentation Materials Entitled ACRS Full Committee Presentation: NuScale Topical Report-Non-Loss-of-Coolant Accident, PM-0320-69141, Revision 0 ML20069A1572020-03-0404 March 2020 LLC - Submittal of Presentation Materials Entitled ACRS Full Committee Presentation: NuScale Topical Report-Rod Ejection Accident Methodology, PM-0320-69146, Revision 0 ML20066G2802020-03-0303 March 2020 LLC, Submittal of Presentation Materials Entitled ACRS Subcommittee Presentation: NuScale Topic - Hydrogen Monitoring, PM-0220-69071, Revision 0 2024-03-28
[Table view] Category:Response to Request for Additional Information (RAI)
MONTHYEARRAIO-0420-69855, LLC, Submittal of Corrected Response to NRC Request for Additional Information No. 284 (Erai No. 9225) on the NuScale Design Certification2020-04-30030 April 2020 LLC, Submittal of Corrected Response to NRC Request for Additional Information No. 284 (Erai No. 9225) on the NuScale Design Certification ML19332A1202019-11-27027 November 2019 LLC Supplemental Response to NRC Request for Additional Information No. 484 (Erai No. 8930) on the NuScale Design Certification Application ML19304B4712019-10-31031 October 2019 LLC Supplemental Response to NRC Request for Additional Information No. 466 (Erai No. 9482) on the NuScale Design Certification Application ML19296D8052019-10-23023 October 2019 LLC Response to NRC Request for Additional Information No. 526 (Erai No. 9719) on the NuScale Design Certification Application ML19283E5302019-10-10010 October 2019 LLC Supplemental Response to NRC Request for Additional Information No. 522 (Erai No. 9681) on the NuScale Design Certification Application ML19260G7352019-10-0707 October 2019 Summary of Public Meeting with NuScale to Discuss Response to RAI 9681 ML19266A5872019-09-23023 September 2019 LLC Supplemental Response to NRC Request for Additional Information No. 518 (Erai No. 9659) on the NuScale Design Certification Application ML19262G9742019-09-19019 September 2019 LLC - Submittal of Changes to Final Safety Analysis Report, Tier 1, Section 3.11, Reactor Building and Section 3.13, Control Building, and Tier 2, Section 3.8.4, Design of Category I Structure and Section 14.3, Certified ... ML19262G5762019-09-19019 September 2019 LLC - Submittal of Changes to Final Safety Analysis Report, Section 14.2, Initial Plant Test Program, Table 14.2-2, Pool Cleanup Systems Test #2, and Table 14.2-50, Module Assembly Equipment Test #50 ML19259B8102019-09-16016 September 2019 LLC Supplemental Response to NRC Request for Additional Information No. 205 (Erai No. 9044) on the NuScale Design Certification Application ML19259A0922019-09-16016 September 2019 LLC Response to NRC Request for Additional Information No. 525 (Erai No. 9705) on the NuScale Design Certification Application ML19238A3722019-08-26026 August 2019 LLC Supplemental Response to NRC Request for Additional Information No. 197 (Erai No. 9051) on the NuScale Design Certification Application ML19238A3662019-08-23023 August 2019 LLC - Response to NRC Request for Additional Information No. 523 (Erai No. 9682) on the NuScale Design Certification Application ML19215A0032019-08-0202 August 2019 LLC - Supplemental Response to NRC Request for Additional Information No. 202 (Erai No. 8911) on the NuScale Design Certification Application ML19215A0062019-08-0202 August 2019 LLC - Supplemental Response to NRC Request for Additional Information No. 441 (Erai No. 9485) on the NuScale Design Certification Application ML19212A7622019-07-31031 July 2019 LLC Response to NRC Request for Additional Information No. 523 (Erai No. 9682) on the NuScale Design Certification Application ML19212A3752019-07-31031 July 2019 LLC Supplemental Response to NRC Request for Additional Information No. 483 (Erai No. 9516) on the NuScale Design Certification Application ML19212A7992019-07-31031 July 2019 LLC Supplemental Response to NRC Request for Additional Information No. 427 (Erai No. 9408) on the NuScale Design Certification Application ML19212A6892019-07-31031 July 2019 LLC Supplemental Response to NRC Request for Additional Information No. 205 (Erai No. 9044) on the NuScale Design Certification Application ML19210D1592019-07-29029 July 2019 LLC Supplemental Response to NRC Request for Additional Information No. 401 (Erai No. 9447) on the NuScale Design Certification Application ML19210D7342019-07-29029 July 2019 LLC Supplemental Response to NRC Request for Additional Information No. 520 (Erai No. 9642) on the NuScale Design Certification Application ML19210E1462019-07-29029 July 2019 LLC Supplemental Response to NRC Request for Additional Information No. 197 (Erai No. 9051) on the NuScale Design Certification Application ML19207B3812019-07-26026 July 2019 LLC - Response to NRC Request for Additional Information No. 427 (Erai No. 9408) on the NuScale Design Certification Application ML19207A5342019-07-26026 July 2019 LLC - Response to NRC Request for Additional Information No. 523 (Erai No. 9682) on the NuScale Design Certification Application ML19207B8522019-07-25025 July 2019 LLC Response to NRC Request for Additional Information No. 194 (Erai No. 8884) on the NuScale Design Certification Application ML19203A3152019-07-22022 July 2019 LLC Supplemental Response to NRC Request for Additional Information No. 325 (Erai No. 9268) on the NuScale Design Certification Application ML19203A3212019-07-22022 July 2019 LLC Supplemental Response to NRC Request for Additional Information No. 333 (Erai No. 9282) on the NuScale Design Certification Application ML19203A3092019-07-22022 July 2019 LLC Supplemental Response to NRC Request for Additional Information No. 54 (Erai No. 8837) on the NuScale Design Certification Application ML19203A3422019-07-22022 July 2019 LLC Supplemental Response to NRC Request for Additional Information No. 154 (Erai No. 8938) on the NuScale Design Certification Application ML19200A2482019-07-19019 July 2019 LLC Response to NRC Request for Additional Information No. 522 (Erai No. 9681) on the NuScale Design Certification Application ML19200A2082019-07-19019 July 2019 LLC - Response to NRC Request for Additional Information No. 524 (Erai No. 9691) on the NuScale Design Certification Application ML19199A1172019-07-18018 July 2019 LLC - Supplemental Response to NRC Request for Additional Information No. 484 (Erai No. 8930) on the NuScale Design Certification Application ML19198A3252019-07-17017 July 2019 LLC - Supplemental Response to NRC Request for Additional Information No. 249 (Erai No. 9135) on the NuScale Design Certification Application ML19196A3682019-07-15015 July 2019 LLC Response to NRC Request for Additional Information No. 516 (Erai No. 9647) on the NuScale Design Certification Application ML19191A2202019-07-10010 July 2019 LLC Supplemental Response to NRC Request for Additional Information No. 197 (Erai No. 9051) on the NuScale Design Certification Application ML19184A6152019-07-0303 July 2019 LLC Supplemental Response to NRC Request for Additional Information No. 386 (Erai No. 9316) on the NuScale Design Certification Application ML19176A5802019-06-25025 June 2019 LLC Supplemental Response to NRC Request for Additional Information No. 232 (Erai No. 9113) on the NuScale Design Certification Application ML19170A3702019-06-19019 June 2019 LLC Supplemental Response to NRC Request for Additional Information No. 232 (Erai No. 9113) on the NuScale Design Certification Application ML19168A2442019-06-17017 June 2019 LLC - Supplemental Response to NRC Request for Additional Information No. 325 (Erai No. 9268) on the NuScale Design Certification Application ML19164A1452019-06-13013 June 2019 LLC - Submittal of Containment Response Analysis Methodology Technical Report, TR-0516 -49 08 4, Revision 1 ML19157A3262019-06-0606 June 2019 LLC - Supplemental Response to NRC Request for Additional Information No. 232 (Erai No. 9113) on the NuScale Design Certification Application ML19154A6222019-06-0303 June 2019 LLC Supplemental Response to NRC Request for Additional Information No. 202 (Erai No. 8911) on the NuScale Design Certification Application ML19154A6052019-06-0303 June 2019 LLC Response to NRC Request for Additional Information No. 514 (Erai No. 9645) on the NuScale Design Certification Application ML19151A8372019-05-31031 May 2019 LLC - Supplemental Response to NRC Request for Additional Information No. 377 (Erai No. 9380) on the NuScale Design Certification Application ML19140A4592019-05-20020 May 2019 LLC Supplemental Response to NRC Request for Additional Information No. 401 (Erai No. 9447) on the NuScale Design Certification Application ML19137A2902019-05-17017 May 2019 LLC Supplemental Response to NRC Request for Additional Information No. 156 (Erai No. 9031) on the NuScale Design Certification Application ML19137A2872019-05-15015 May 2019 LLC Response to NRC Request for Additional Information No. 519 (Erai No. 9656) on the NuScale Design Certification Application ML19126A2942019-05-0606 May 2019 LLC Supplemental Response to NRC Request for Additional Information No. 26 (Erai No. 8840) on the NuScale Design Certification Application ML19122A5092019-05-0202 May 2019 LLC - Supplemental Response to NRC Request for Additional Information No. 494 (Erai No. 9548)on the Design Certification Application ML19121A6002019-05-0101 May 2019 LLC - Supplemental Response to NRC Request for Additional Information No. 202 (Erai No. 8911) on Design Certification Application 2020-04-30
[Table view] |
Text
RAIO-0419-65230 April 15, 2019 Docket No.52-048 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk One White Flint North 11555 Rockville Pike Rockville, MD 20852-2738
SUBJECT:
NuScale Power, LLC Response to NRC Request for Additional Information No.
512 (eRAI No. 9634) on the NuScale Design Certification Application
REFERENCES:
- 1. U.S. Nuclear Regulatory Commission, "Request for Additional Information No. 512 (eRAI No. 9634)," dated November 29, 2018
- 2. NuScale Power, LLC Response to NRC "Request for Additional Information No. 512 (eRAI No.9634)." dated January 10, 2019
- 3. NuScale Power, LLC Response to NRC "Request for Additional Information No. 512 (eRAI No.9634)." dated January 16, 2019
- 4. NuScale Power, LLC Response to NRC "Request for Additional Information No. 512 (eRAI No.9634)." dated January 29, 2019
- 5. NuScale Power, LLC Response to NRC "Request for Additional Information No. 512 (eRAI No.9634)." dated February 25, 2019 The purpose of this letter is to provide the NuScale Power, LLC (NuScale) response to the referenced NRC Request for Additional Information (RAI).
The Enclosure to this letter contains NuScale's response to the following RAI Questions from NRC eRAI No. 9634:
16-60-2 16-60-77 Other portions of the NuScale response to question 16-60 were previously provided in References 2,3,4 and 5. This completes all responses to eRAI 9634.
This letter and the enclosed response make no new regulatory commitments and no revisions to any existing regulatory commitments.
If you have any questions on this response, please contact Carrie Fosaaen at 541-452-7126 or at cfosaaen@nuscalepower.com.
Sincerely, Zackary W. Rad Director, Regulatory Affairs NuScale Power, LLC NuScale Power, LLC 1100 NE Circle Blvd., Suite 200 Corvalis, Oregon 97330, Office: 541.360.0500, Fax: 541.207.3928 www.nuscalepower.com
RAIO-0419-65230 Distribution: Gregory Cranston, NRC, OWFN-8H12 Samuel Lee, NRC, OWFN-8H12 Getachew Tesfaye, NRC, OWFN-8H12 : eRAI No. 9634, Question 16-60 Cross-Reference Table : NuScale Response to NRC Request for Additional Information eRAI No. 9634 NuScale Power, LLC 1100 NE Circle Blvd., Suite 200 Corvalis, Oregon 97330, Office: 541.360.0500, Fax: 541.207.3928 www.nuscalepower.com
Attachment 1:
RAIO-0419-65230 eRAI No. 9634, Question 16-60 04/15/2019 Cross-Reference Table Page 1 of 3 NuScale NRC RAI Sub-Tracking paragraph NuScale Letter Submittal Letter Number Number No. Date Accession Number 16-60-1 1 RAIO-0119-64111 January 10, 2019 ML19010A409 16-60-2 2 RAIO-0419-65230 April 15, 2019 Pending 16-60-3 3 RAIO-0119-64281 January 29, 2019 ML19029B572 16-60-4 4 RAIO-0119-64111 January 10, 2019 ML19010A409 16-60-5 5 RAIO-0119-64111 January 10, 2019 ML19010A409 16-60-6 6 RAIO-0119-64178 January 16, 2019 ML19016A374 16-60-7 7 RAIO-0119-64281 January 29, 2019 ML19029B572 16-60-8 8 RAIO-0119-64111 January 10, 2019 ML19010A409 16-60-9 9 RAIO-0119-64281 January 29, 2019 ML19029B572 16-60-10 10 RAIO-0119-64111 January 10, 2019 ML19010A409 16-60-11 11 RAIO-0119-64111 January 10, 2019 ML19010A409 16-60-12 12 RAIO-0119-64111 January 10, 2019 ML19010A409 16-60-13 13 RAIO-0119-64111 January 10, 2019 ML19010A409 16-60-14 14 RAIO-0119-64111 January 10, 2019 ML19010A409 16-60-15 15 RAIO-0119-64111 January 10, 2019 ML19010A409 16-60-16 16 RAIO-0119-64111 January 10, 2019 ML19010A409 16-60-17 17 RAIO-0119-64281 January 29, 2019 ML19029B572 16-60-18 18 RAIO-0119-64281 January 29, 2019 ML19029B572 16-60-19 18 RAIO-0119-64111 January 10, 2019 ML19010A409 16-60-20 19 RAIO-0119-64111 January 10, 2019 ML19010A409 16-60-21 20 RAIO-0119-64281 January 29, 2019 ML19029B572 16-60-22 21 RAIO-0119-64281 January 29, 2019 ML19029B572 16-60-23 22 RAIO-0119-64281 January 29, 2019 ML19029B572 16-60-24 23 RAIO-0119-64281 January 29, 2019 ML19029B572 16-60-25 24 RAIO-0119-64281 January 29, 2019 ML19029B572 16-60-26 25 RAIO-0119-64281 January 29, 2019 ML19029B572 16-60-27 26 RAIO-0119-64281 January 29, 2019 ML19029B572 16-60-28 27 RAIO-0119-64281 January 29, 2019 ML19029B572 16-60-29 28 RAIO-0119-64281 January 29, 2019 ML19029B572 16-60-30 29 RAIO-0119-64281 January 29, 2019 ML19029B572 16-60-31 29 RAIO-0119-64281 January 29, 2019 ML19029B572 16-60-32 29 RAIO-0119-64281 January 29, 2019 ML19029B572 16-60-33 30 RAIO-0119-64281 January 29, 2019 ML19029B572 16-60-34 30 RAIO-0119-64281 January 29, 2019 ML19029B572 16-60-35 31 RAIO-0119-64281 January 29, 2019 ML19029B572 16-60-36 32 RAIO-0119-64111 January 10, 2019 ML19010A409 16-60-37 33 RAIO-0119-64111 January 10, 2019 ML19010A409 16-60-38 34 RAIO-0119-64111 January 10, 2019 ML19010A409
Attachment 1:
RAIO-0419-65230 eRAI No. 9634, Question 16-60 04/15/2019 Cross-Reference Table Page 2 of 3 NuScale NRC RAI Sub-Tracking paragraph NuScale Letter Submittal Letter Number Number No. Date Accession Number 16-60-39 35 RAIO-0119-64111 January 10, 2019 ML19010A409 16-60-40 36 RAIO-0119-64281 January 29, 2019 ML19029B572 16-60-41 37.1 RAIO-0119-64111 January 10, 2019 ML19010A409 16-60-42 37.2 RAIO-0119-64281 January 29, 2019 ML19029B572 16-60-43 37.3 RAIO-0119-64281 January 29, 2019 ML19029B572 16-60-44 38 RAIO-0119-64111 January 10, 2019 ML19010A409 16-60-45 39 RAIO-0219-64635 February 25, 2019 ML19056A587 16-60-46 40 RAIO-0119-64281 January 29, 2019 ML19029B572 16-60-47 41 RAIO-0119-64111 January 10, 2019 ML19010A409 16-60-48 42 RAIO-0119-64111 January 10, 2019 ML19010A409 16-60-49 43 RAIO-0119-64111 January 10, 2019 ML19010A409 16-60-50 44 RAIO-0119-64111 January 10, 2019 ML19010A409 16-60-51 45 RAIO-0119-64111 January 10, 2019 ML19010A409 16-60-52 Tracking number 16-60-52 not used 16-60-53 46 RAIO-0119-64111 January 10, 2019 ML19010A409 16-60-54 47 RAIO-0119-64111 January 10, 2019 ML19010A409 16-60-55 48 RAIO-0119-64178 January 16, 2019 ML19016A374 16-60-56 49 RAIO-0119-64111 January 10, 2019 ML19010A409 16-60-57 50 RAIO-0119-64111 January 10, 2019 ML19010A409 16-60-58 51 RAIO-0119-64111 January 10, 2019 ML19010A409 16-60-59 52 RAIO-0119-64178 January 16, 2019 ML19016A374 16-60-60 53 RAIO-0219-64635 February 25, 2019 ML19056A587 16-60-61 54 RAIO-0119-64281 January 29, 2019 ML19029B572 16-60-62 55 RAIO-0119-64281 January 29, 2019 ML19029B572 16-60-63 55 RAIO-0119-64281 January 29, 2019 ML19029B572 16-60-64 56, 57, 58 RAIO-0119-64178 January 16, 2019 ML19016A374 16-60-65 59 RAIO-0219-64635 February 25, 2019 ML19056A587 16-60-66 60 RAIO-0219-64635 February 25, 2019 ML19056A587 16-60-67 61 RAIO-0119-64178 January 16, 2019 ML19016A374 16-60-68 62 RAIO-0119-64178 January 16, 2019 ML19016A374 16-60-69 63 RAIO-0119-64178 January 16, 2019 ML19016A374 16-60-70 64 RAIO-0119-64178 January 16, 2019 ML19016A374 16-60-71 65 RAIO-0119-64178 January 16, 2019 ML19016A374 16-60-72 66 RAIO-0119-64281 January 29, 2019 ML19029B572 16-60-73 67 RAIO-0119-64281 January 29, 2019 ML19029B572 16-60-74 68 RAIO-0119-64111 January 10, 2019 ML19010A409 16-60-75 69 (i - iv) RAIO-0219-64635 February 25, 2019 ML19056A587 16-60-76 69 (v) RAIO-0219-64635 February 25, 2019 ML19056A587 16-60-77 70 RAIO-0419-65230 April 15, 2019 Pending
Attachment 1:
RAIO-0419-65230 eRAI No. 9634, Question 16-60 04/15/2019 Cross-Reference Table Page 3 of 3 NuScale NRC RAI Sub-Tracking paragraph NuScale Letter Submittal Letter Number Number No. Date Accession Number 16-60-78 71 RAIO-0119-64281 January 29, 2019 ML19029B572 16-60-79 72 RAIO-0219-64635 February 25, 2019 ML19056A587 16-60-80 73 RAIO-0219-64635 February 25, 2019 ML19056A587 16-60-81 74 RAIO-0219-64635 February 25, 2019 ML19056A587 16-60-82 75 RAIO-0219-64635 February 25, 2019 ML19056A587
RAIO-0419-65230 :
NuScale Response to NRC Request for Additional Information eRAI No. 9634 NuScale Power, LLC 1100 NE Circle Blvd., Suite 200 Corvalis, Oregon 97330, Office: 541.360.0500, Fax: 541.207.3928 www.nuscalepower.com
Response to Request for Additional Information Docket No.52-048 eRAI No.: 9634 Date of RAI Issue: 11/29/2018 NRC Question No.: 16-60-2
- 2. A response is not required because this item is already included in and will be addressed in the response to RAI 506-9614, Question 16-59. In Revision 2 of DCA part 2, FSAR Section 15.1.1.2 says In a decrease in feedwater temperature event that results in a reactor trip, the subsequent actuation of the decay heat removal system (DHRS) is credited with maintaining reactor cooling. The MPS signals credited for DHRS actuation are low PZR pressure, high steam superheat, low PZR level, high steam pressure, or high hot leg temperature. The listing of Low PZR level is a typo, because low low PZR level initiates DHRS.
NuScale Response:
The actuation logic of the DHRS has been modified, and a new ESFAS function Secondary System Isolation (SSI) was added to the module protection system design. The DHRS actuation logic no longer includes actuation on reduced pressurizer level.
The new SSI function actuates on Low-Low Pressurizer Level. Technical specification Table 3.3.1-1 has been modified to reflect this design change as shown in the unilateral submittal provided in NuScale letter LO-0419-65170 dated April 15, 2019.
Impact on DCA:
There are no impacts to the DCA as a result of this response.
NuScale Nonproprietary
Response to Request for Additional Information Docket No.52-048 eRAI No.: 9634 Date of RAI Issue: 11/29/2018 NRC Question No.: 16-60-77
- 70. A response is not required because the applicant stated in an email dated November 12, 2018, to follow up the November 6, 2018, public meeting conference call, that it would address this item in the response to RAI 506-9614, Question 16-59, and in Revision 3 of DCA part 4.
DCA Revision 2, part 4, on DCA pages B 3.3.1-14 and 15, describe the T-3 interlock as automatically bypassing MPS Functions 9.b, 9.c, and 9.d when wide range RCS hot temperature is < 350°F (T-3 interlock); but an RCS hot temperature below 350°F implies the NPM is in MODE 3, which is outside the stated Applicability of these Functions, which is MODES 1 and 2.
The Bases rationale for not including MODE 3 seems to be the passage on page B 3.3.1-25:
Four Low Low Pressurizer Pressure DHRS, CVCSI and Pressurizer Heater Trip channels are required to be OPERABLE when operating in MODES 1 and 2. In MODES 3, 4, and 5 the reactor is subcritical.
The applicant is requested to explain and clarify this rationale.
NuScale Response:
The actuation of the decay heat removal system (DHRS), chemical volume and control system isolation, and the pressurizer heater trip on receipt of the Low Low Pressurizer Pressure signals in MODE 3 do not provide protective functions. In MODES 4 and 5 the module is not in its operating location and the sensors are not OPERABLE.
NuScale Nonproprietary
Note that as a result of recent design changes, the DHRS and pressurizer heater trip are no longer actuated directly by the Low Low Pressurizer Pressure signal. The Low Low Pressurizer Pressure signal causes a secondary system isolation actuation.
As described in FSAR Table 15.0-7, the Low Low Pressurizer Pressure signal is designed to detect and mitigate primary high energy line breaks outside containment and to protect the reactor coolant subcooled margin against instability events.
The actuations resulting from the Low Low Pressurizer Pressure signal are not necessary when the reactor coolant temperature is below 420 F because the low pressurizer level provides inventory protection for the RPV.
Similarly, the actuations provided by the Low Low Pressurizer Pressure signal are not necessary for protecting the subcooled margin when the reactor is subcritical because the instability events of concern cannot occur.
Impact on DCA:
There are no impacts to the DCA as a result of this response.
NuScale Nonproprietary