ML19105A841
| ML19105A841 | |
| Person / Time | |
|---|---|
| Site: | Surry |
| Issue date: | 09/25/1975 |
| From: | Stallings C Virginia Electric & Power Co (VEPCO) |
| To: | Goller K Office of Nuclear Reactor Regulation |
| References | |
| Download: ML19105A841 (3) | |
Text
r_,-~1 ~-----,.-----*-*--.
.L-..
(*
II*,r,. I e
NRC DISTRIBUTION FOR PART 50 DOCKET MATERIAL.
(TEMPORARY FORM)
CONTROL NO: Ld '!'"'"JJ;tfct Fl~E=--~---
FROM:Virginia. Electric &PWT 0 Cc 0 DATE OF DOC DATE REC'D LTR TWX RPT OTHER Riclunond, Vao C,,Mo Stallings 9-25-75 9-29-75 XXX TO:
ORIG cc OTHER SENT NRC. PD R
!'&}..'YXX K.Ro Goller
. 1 Signed SENT LOCAL PDR xxxxx*
CLASS PROP INFO INPUT NO CYS REC'D D0CKE1 NO:
UN.CLASS xxxx 1.
50-2s7p3Y DESCRIPTION:
ENCLOSU-RES:
Ltro re their ltro,7-22-75oooSubmitting status of the modification tr>
be made to certain* port ions of the ECCS systems of Units 1 & 2o;*o PLANT NAME: Surry 1 & 2 FOR ACTION/INFORMATION
/*
v'fuirD(L)
VCR 9-29-75 BUTLER (L)
W/ Copies CLARK (L)
W/ Copies PARR (L)
W/ Copies KNIEL (L)
SCHWENCER (L)
W/ Copies STOLZ (L)
W/ Copies VASSALLO (L)
- W/ Copies PURPLE (L)
ZIEMANN (L)
REGAN (E)
W/ Copies W/ Copies W /th COPIES.
DICKER (E)
LEAR (L)
W/ Copies
- W/ Copies KNIGHTON (E)
SPIES W/ Copies W/ Copies
. YOUNGBLOOD (El LPM
- W/ *copies W/ Copies W/ Copies W/_,.C.... o-p-1e_s ____
JNTERNAL DISTRIBUTION EG F TECH REVIEW DENTON LIC ASST DR SCHROEDER
. GRIMES R. DIGGS (L)
~GC, ROOM P-506A*
MACCARY
~~MMILL H. GEARIN (L)
-1?.0SSICK/STAFF KNIGHT KASTNER E. GOULBOURNE (L)
A/T IND.
BRAITMAN SALTZMAN MELTZ
.;CASE.
PAWLICKI BALLARD P. KREUTZER (E)
<lAMBUSSO SHAO SPANGLER J. LEE (L)
PLANS e,BOYD
~TELLO M. R'!J.JTIBROOK(L)
MCDONALD MOORE (L)
HOUSTON ENVI RO S. REED (E)
CHAPMAN DEYOUNG (L)
~OVAK.ll MULLER.
M. SERVICE (L)
DUBE.(Ltr)*
SKOVHOLT (L)
,i,!P ROSS DICKER
- S. SHEPPARD (L)
E. COUPE GOLLER (L) (Ltr)
IPPOLITO KNIGHTON M. SLATER (E)
PETERSON P. COLLINS AoESCO
- YOUNGBLOOD H. SMITH (L)
HARTFIELD (2l DENISE
_ ~~COLLINS REGAN S. TEETS (L)
KLECKER
~EG QPR VLJ-\\1 NAS PROJECT LOR G. WILLIAMS (El EISENHUT FILE & REGION (2)
BENAROYA V WILSON (L)
WIGGINTON {].
MIPC
- VOLLMER HARLESS
~
INGRAM (L) 1
~'!/(k1!,{JA.d.
M. DUNCAN (E)
-: : ~-*-.:" *.~.-*...- ; *.,.: :***..,.. *-< _£.'.~-~ :~*.*tJ.*~.-:--- ;,******£XTERNA-l D1STR1BUT10N *.*'a**... :*,***-,:~-:*:-~ * **. *,* *.:,:.~:.:*:.-':,,,*.- ;.-*...-... *,*.*:.. -
.,....1-LOCAL PDRi;}tAl~~LU:J1~*>U
/-TIC (ABERNATHY)
(1)(2)(10) - N~TIONAL LABS 1 - PDR 0SAN/LA/NY.
._I! - NSIC (BUCHANAN) 1 - W. PENNINGTON, Rm E-201 GT 1 -
BROOKHAVEN NAT LAB 1-ASLB 1 -CONSULTANTS 1-G.ULRIKSON ORNL 1 tNcwton Anderson 11 NEWMARK/BLUME/AGBABIAN/'d~w.i _____ rc*cr~J
/pACRS ~/SENTt)',ut...._
~-~
t:'
- ___.*_,__~-*
e VIRGil'UA ELECTRIC AND POWER.COMPANY RIOHMOND,VIROINIA 23261 September 25; 1975 Mr. K. R. Goller, Assistant Director*
for Operating Reactors Division of Reactor Licensing Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D. C.
20555
Dear Mr. Goller:
In our letter of July 22, 1975, Serial No. 571, we advised the Commission of our plans concerning *the modifications to be made to certain portions of the emergency core cooling systems of Unit Nos. 1-and 2 at the Surry Pm,ier Station.
The purpose of this letter is to advise-you of the status of the subject changes.
As indicated previously in the aforementioned letter and in discussions with the Regulatory Staff, we plan to install redundant flow paths to the*
suction of the low head safety injection pumps to assure that the single fail-ure criteria.established by the Commission is satisfied~
The necessary engi-neering to accomplish this objective ~as essentially been completed.
- However, because of physical constraints and unacceptable installation time of our initial approach, we are pursuing an alternate method to accomplish the same objective; i.?. redundant flow* paths.
SpE;cifically, we are now contE;mplating installing a redundant pipeline to the bottom of the valve pit and locating*
the,valves and check valves in an area above the valve pit which is much more accessible* and has less restrictive space limitations..
As indicated in all our discussions with the Commission, and in our let-ters, we indicated -that material availability and delivery was expected to be a problem and that planning to complete the modifieation during the upcoming re-fueling during October 1975 was optimistic.
Our architect-engineer has reviewed material availability and we are not able to secure the necessary material *to assure completion during the scheduled Unit No. 1 refueling.
We are continuing our efforts to secure material for the Unit No. 2 refueling scheduled for April 1976.
We plan to continue the interim measures the Commission established until such time the subject modifications are completed. We shall continue to keep you
. i F-:S!*
e VIRGINIA ELECTRIC AND POWER CoMPA~'Y TO Mr. K. R. Goller Page 2 informed of our progress.
If you would like td discuss the matter in more detail, we will be pleased to meet with you.
cc:
Mr. Norman C. Moseley Very tru~y yours,
~- ]Q/7. ~~~
C. M. Stallings Vice President~Power Supply and Production-Operations