ML19105A228
ML19105A228 | |
Person / Time | |
---|---|
Site: | Surry |
Issue date: | 05/14/1975 |
From: | Sweeney E Virginia Electric & Power Co (VEPCO) |
To: | NRC/RGN-II |
References | |
Download: ML19105A228 (2) | |
Similar Documents at Surry | |
---|---|
Category:Letter
MONTHYEARIR 05000280/20244012024-02-0606 February 2024
[Table view]Security Baseline Inspection Report 05000280/2024401, 05000281/2024401 and 07200002/2024401 IR 05000280/20230102024-01-18018 January 2024 Age Related Degradation Inspection Report 05000280-2023010 and 05000281-2023010 ML23312A1922024-01-18018 January 2024 Issuance of Amendment Nos. 316 & 316 Regarding a Risk Informed Approach for Tornado Classification of the Fuel Handling Trolley Support Structure ML24003A9022024-01-0303 January 2024 Stations, Units 1 and 2, Emergency Plan Revision - Relocation of the Technical Support Center (TSC) - Editorial Correction IR 05000280/20233012023-12-28028 December 2023 NRC Operator License Examination Report 05000280/2023301 and 05000281/2023301 ML23283A3052023-12-20020 December 2023 Review of Appendix F to DOM-NAF2, Qualification of the Framatome ORFEO-GAIA and ORFEO-NMGRID CHF Correlations in the Dominion Energy VIPRE-D Computer Code (EPID L-2022-LLT-0003) (Nonproprietary) ML23352A3692023-12-18018 December 2023 Associated Independent Spent Fuel Storage Installation, Revision to Emergency Plan Report of Change ML23334A2342023-11-30030 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23242A2292023-11-0707 November 2023 Issuance of Amendment Nos. 315 and 315, Regarding Emergency Procedure Relocation of the Technical Support Center ML23200A2622023-11-0202 November 2023 Issuance of Amendment Nos. 314 and 314, Regarding Technical Specification and Spent Fuel Pool Criticality Change IR 05000280/20230032023-10-25025 October 2023 Integrated Inspection Report 05000280/2023003 and 05000281/2023003 ML23286A0372023-10-13013 October 2023 Annual Submittal of Technical Specifications Bases Changes Pursuant to Technical Specification 6.4.J ML23285A0922023-10-12012 October 2023 Inservice Testing Program for Pumps and Valves Sixth Interval Update and Associated Relief and Alternative Requests ML23277A1172023-10-0303 October 2023 Operator Licensing Examination Approval 05000280/2023301 and 05000281/2023301 ML23230A0502023-10-0202 October 2023 5 of the Quality Assurance Topical Report - Review of Program Changes ML23256A2672023-09-21021 September 2023 Review of the Fall 2022 Steam Generator Tube Inspection Report ML23244A2352023-09-18018 September 2023 Request to Use a Subsequent Edition of the ASME Code, Section XI ML23230A0012023-09-15015 September 2023 Request to Use a Provision of a Previous Edition of the ASME Boiler and Pressure Vessel Code, Section XI, for Non-Destructive Examinations IR 05000280/20220042023-09-0101 September 2023 Reissue - Surry Power Station - Integrated Inspection Report 05000280/2022004 and 05000281/2022004 ML23244A0142023-08-30030 August 2023 Inservice Inspection Owner'S Activity Report IR 05000280/20230052023-08-23023 August 2023 Updated Inspection Plan for Surry Power Station, Units 1 and 2 (Report 05000280/2023005 and 05000281/2023005) ML23226A1862023-08-10010 August 2023 Proposed License Amendment Request - Reclassification of Regulatory Guide 1.97 Variable for Low Head Safety Injection Flow Instrumentation ML23220A1492023-08-0707 August 2023 Independent Spent Fuel Storage Installation - Submittal of Cask Registrations for Spent Fuel Storage ML23220A1482023-08-0707 August 2023 Proposed Emergency Plan Revision - Relocation of the Technical Support Center (TSC) Response to Request for Additional Information IR 05000280/20230022023-08-0404 August 2023 Integrated Inspection Report 05000280/2023002 and 05000281/2023002 ML23208A0922023-07-26026 July 2023 Request for Approval of Appendix F of Fleet Report DOM-NAF-2-P Qualification of Framatome ORFEO-GAIA and OORFE-NMGRID CHF Correlations in the Dominion Energy Vipre-D Computer Code Response ML23207A1102023-07-26026 July 2023 NRC Regulatory Issues Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations ML23198A0322023-07-18018 July 2023 Regulatory Audit Report Regarding Review of License Amendment to Modify Emergency Plan Staff Augmentation Times ML23193A9382023-07-18018 July 2023 Closeout of Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors ML23173A0602023-07-11011 July 2023 Audit Summary for License Amendment Request Revision of the Emergency Plan to Support Relocation of the Technical Support Center ML23136B1392023-06-29029 June 2023 Issuance of Amendment No. 313 Administrative Changes to Subsequent Renewed Operating Licenses and Technical Specifications ML23178A1682023-06-26026 June 2023 2022 Annual Report of Emergency Core Cooling System (ECCS) Model Changes Pursuant to the Requirements of 10 CFR 50.46 ML23152A0432023-06-22022 June 2023 Audit Plan License Amendment Requests to Change Emergency Plan Staff Augmentation Times ML23153A1732023-06-16016 June 2023 Correction to Amendment Nos. 346 & 286 Millstone, 294 & 277 North Anna, 311 & 311 Surry, and 225 Summer to Revise Technical Specifications to Adopt TSTF-554,Rev Reactor Coolant Leakage Requirement ML23163A2352023-06-12012 June 2023 Request to Use a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI, for the SPS Sixth Inservice Inspection (Isi) Intervals and VCSNS Fifth ISI Interval ML23151A6612023-05-31031 May 2023 ES-2.1-1, Surry 2023-301 Corporate Notification Letter (Revised) ML23167B0072023-05-31031 May 2023 Proposed Emergency Plan Revision - Relocation of the Technical Support Center (TSC) Supplemental Information - LOCA Dose Calculation Summary ML23117A0952023-05-10010 May 2023 Audit Plan License Amendment Request to Support Relocation of the Technical Support Center ML23130A3742023-05-10010 May 2023 Request to Delay NRC Intial Licensing Examination 2024-02-06 Category:Licensee Event Report (LER) MONTHYEAR05000281/LER-2020-001, Cancellation of LER 2020-001-00 for Surry Power Station Unit 2 Re Loss of Containment Cooling Affecting Containment Partial Pressure Indication2020-11-0606 November 2020
[Table view]Cancellation of LER 2020-001-00 for Surry Power Station Unit 2 Re Loss of Containment Cooling Affecting Containment Partial Pressure Indication 05000280/LER-2019-0022020-02-0404 February 2020 LER 2019-002-00 for Surry Power Station Unit 1, Items Non-Conforming to Design for Tornado Missile Protection 05000280/LER-2017-0012017-10-0606 October 2017 1 OF 3, LER 17-001-00 for Surry, Unit 1, Regarding Shutdown due to an Unisolable Leak in Reactor Coolant Pressure Boundary 05000281/LER-2016-0012016-12-0202 December 2016 Unit 2 Reactor Trip due to Generator Differential Lockout, LER 16-001-00 for Surry Power Station, Unit 2, Regarding Reactor Trip Due to Generator Differential Lockout 05000280/LER-2016-0012016-07-11011 July 2016 1 OF 4, LER 16-001-00 for Surry Power Station, Unit 1 and 2, Regarding Emergency Service Water Pump Inoperable Due to Corrosion of Valve Support ML1015505662009-03-0404 March 2009 Event Notification for Surry on Relief Valve Failure Results in Tritium and Cesium Spill ML0702501902007-01-17017 January 2007 Special Report on Qpt Not Less than Two Percent for Twenty Four Hours ML19105B1281979-08-21021 August 1979 LER 1979-011-03X for Surry Units 1 & 2 Loss of Power with Both Units at Cold Shutdown, Observed Radiation Monitors Without Power ML19093B4141978-09-26026 September 1978 Reporting Condenser Cooling Water Outlet Temperature to James River Decreased by 3.5oF as Measured at Station Discharge Structure ML19105A3001978-09-0808 September 1978 LER 78-013-03X-1, LER 78-029-03L-0, & LER 78-031-03L-0 for Surry 2 Re Critical Below Minimum Insertion Limit on D Control Bank ML19105A3011978-09-0101 September 1978 LER 1978-028-03L-0 for Surry 2 Re Containment Pressure Exceeded Allowable Limit ML19095A4971978-08-25025 August 1978 Submit Licensee Event Report No. LER 78-024/03L-0 Re No Alarm During a Planned Release of Liquid Radioactive Waste ML19095A4981978-08-22022 August 1978 Submit Licensee Event Report Nos. LER 1978-019/03L-0, LER 1978-021/03L-0, LER 1978-022/03L-0, LER 1978-023/03L-0, LER 1978-025/03L-0, LER 1978-026/03L-0 for Surry Unit No. 1 ML19105A0771978-08-16016 August 1978 Submit LER 78-027/03L-0 Re Seven Snubbers Not Meeting Inspection Criteria ML19105A0781978-08-16016 August 1978 Submit LER 78-027/03L-0 Re Seven Snubbers Not Meeting Inspection Criteria ML19105A0791978-08-11011 August 1978 LER 78-026/03L-0. Follow-up Inspection for Valve Cleanliness, Discovered That Containment Spray Isolation Valves (MOV-CS-201C and D) Contained No More That Five Milliliters. Technical Specification TS 6.6.2.b.(3) ML19095A4991978-08-0404 August 1978 Sutmit Licensee Event Report No. LER 78-018/03L-0 Re Two Main Steam Safety Valves Were Not within Plus or Minus 3% of Setpoint as Required ML19105A0801978-07-28028 July 1978 LER 1978-022-03L-0 Re Axial Power Distribution Monitoring Was Exceeded,& Three LERs 1978-021-03L-0, LER 1978-023-03L-0, & LER 1978-024-03L-0 Re Inlet Circulating Water Temperature Exceeded ML19095A5001978-07-28028 July 1978 Submit Licensee Event Report Nos. LER 78-017/03L-0 Re Not Documenting Four Electric Maintenance Procedures & Two Periodic Tests, & 78-020/03L-0 Re Suspended Air Bubbles in Reservoir Fluid ML19095A2281978-07-27027 July 1978 Reporting & Providing Additional Information on Incidence of Missing Two Steam Generator Tube Plugs Found During Inspection ML19095A2291978-07-26026 July 1978 Reporting of Cooling Water Discharge Temperature Change Rate on 7/9/1978 & Found No Evidence of Any Detrimental Effects in River or Its Inhabitants ML19095A5011978-07-21021 July 1978 Submit Licensee Event Report No. LER 78-016/03L-0 Re Valve MOV-RH-100 Was Not Opening ML19105A0821978-07-17017 July 1978 LER 1978-025-03L for Surry Unit 2 Excessive Gap Around Battery Room Ventilation Duct ML19105A0811978-07-17017 July 1978 LER 1978-025-03L for Surry Unit 2 Excessive Gap Around Battery Room Ventilation Duct ML19095A5021978-07-0707 July 1978 Submit Licensee Event Report Nos. LER 78-013/03L-0 Re Six Snubbers Not Meeting Test Criteria, & 78-014/03L-0 Re Mount Plate Was Warped, & 3 of 8 Bolts Were Insufficiently Embedded ML19095A5031978-06-27027 June 1978 Submit Licensee Event Report No. LER-78-015/03L-0 Re Valve Cleanliness Inspection Found Foreign Material on Valve Seating Surfaces ML19095A5041978-06-27027 June 1978 Submit Licensee Event Report No. LER-78-015/03L-0 Re Valve Cleanliness Inspection Found Foreign Material on Valve Seating Surfaces ML19105A0831978-06-23023 June 1978 LER 1978-017-03L, LER 1978-018-03L, LER 1978-019-03L, & LER 1978-020-03L for Surry Unit 2 Related to Snubbers ML19095A2481978-06-19019 June 1978 06/19/1978 Letter Reporting Increase of Condenser Cooling Water Discharge ML19095A5051978-06-0707 June 1978 Submit Licensee Event Report No. LER-78-012/03L-0 Re Inside Recirculation Spray Pump 1-RS-P-1A, Failure to Rotate by Hand ML19105A0851978-05-23023 May 1978 LER 1978-015-03L for Surry Unit 2 Finding of Air Leak on Header of Control Room Emergency Air Supply Bank ML19095A5061978-05-23023 May 1978 Submit Licensee Event Report Nos. LER-78-008/03L-0, LER-78-009/03L-0, LER-78-010/03L-0, LER-78-011/03L-0 for Surry Unit No. 1 ML19105A0861978-05-12012 May 1978 LER 1978-013-03L for Surry Unit 2 Reactor Brought Critical Below Minimum Insertion Limit on D Control Bank ML19105A0871978-05-0505 May 1978 LER 1978-014-03L for Surry Unit 2 Charging Pump Service Water Pump a Tripped on High Current ML19095A5071978-05-0505 May 1978 Submit Licensee Event Report No. LER-78-007/03L-0 Re Leak on Body to Bonnet Joint Diaphragm Valve 1-CH-98 ML19105A0881978-04-19019 April 1978 LER 1978-006-01T for Surry Unit 2 Review of Fire Protection Yard Piping Revealed That Two Pipe Extensions May Not Have Been Seismically Qualified ML19095A5081978-04-19019 April 1978 Submit Licensee Event Report No. LER-78-006/01T-0 Re Seismically Disqualified Two Pipe Extensions on Fire Protection Yard Piping ML19095A5091978-04-0707 April 1978 Forwarding Licensee Event Report No. LER-78-005/01T-0 Re Westinghouse'S Error in LOCA-ECCS Evaluation Model, Which Will Result in Higher Calculated Peak Clad Temperature ML19105A0901978-04-0606 April 1978 LER 1978-012-01T for Surry Unit 2 Failure to Meet Containment Integrity ML19105A0921978-04-0404 April 1978 LER 1978-011-03L for Surry Unit 1 Loss of Service Water Flow Through Charging Pump Intermediate Seal Cooler ML19095A5101978-04-0404 April 1978 Submit Licensee Event Report No. LER-78-004/03L-0 Re Loss of Service Water Flow Through Charging Pump Intermediate Seal Cooler ML19105A0931978-03-30030 March 1978 LER 1978-008-03L Re Snubber Body in Contact with Structure; LER 1978-009-03L Re Trip of Boric Acid Transfer Pump; & LER 1978-010-03L Re Failure of Pressurizer Channel ML19095A5111978-03-28028 March 1978 Submit Licensee Event Report No. LER-78-003/03L-0 Re Failed Heat Tracing, Panel 8 Circuit 24 ML19095A5121978-03-21021 March 1978 Submit Licensee Event Report No. LER-78-002/01T-0 Re Additional Radial Peaking Factor Surveillance ML19105A0941978-02-27027 February 1978 LER 1978-006-03L Re Failure of Sola Transformer, & LER 1978-007-03L Re Trip of Boric Acid Transfer Pump on Thermal Overload ML19095A5131978-02-24024 February 1978 Submit Licensee Event Report No. LER-78-001/03L-0 Re Hydraulic Shock Suppressor Found Inverted with Empty Reservoir ML19105A0951978-02-16016 February 1978 LER 1978-003-03L Re Erroneous Readings of Loop a Hot Leg Temperature Protection Channel; LER 1978-004-03L Re Unqualified Welding of Two Diaphragm Welds on Heat Exchanger; & LER 1978-005-03L Re Low Current Condition from Heat Tracing ML19105A0971978-02-0202 February 1978 LER 1978-001-03L for Surry Unit 2 Inoperability of Condenser Circulating Water Outlet Valve ML19095A5141978-01-0909 January 1978 Submit Licensee Event Report Nos. LER-77-021/03L-0 & LER-77-022/03L-0 ML19105A0991978-01-0909 January 1978 LER 1977-021-03L Re Routine Sampling of Bast a Revealed Tank Was at Concentration of 11.5%, & LER 1977-022-03L Re Failure of Comparator to Trip During Routine Test of a Steam Generator Level Protection Channel II 2020-02-04 |
Text
e* e*
Letter to N. c. Moseley from Virginia Electric and Power Company dated May 14, 1975.
DISTRIBUTION:
H. D. Thornburg, IE IE:HQS (4)
Office of Standards Development
.,_~entraJ. Files Division of Reactor Licensing (4)
. ~-. '
e e VIRGINIA EL£CTRIC ANO POWER COMPANY Surry Power Stat.ion P.O. Box 315 Su~l.'Y. Virginia 231383 May 14. 1975 Di.recto~ of Regulatory Operations 230 Peachtree Street. N.H.
Suite 818 Atlanr:a. Geo-rgia .30303 Dear Sir; Th.is is 1:0 inform you by t:.elecopy of an Abnormal Occurrence that was noted on May 13. 1975, at Surry .Nuclear Pcver Stat~on~ during the refueling of Unit 2. Dur:tng the lifting of a fue1 asee~bly, the manipu1a-tor crane stopped due to overload. The subject fuel aseemb1y vas transfe~rad to the spent fuel pit for :lnapecti.on. Inspect:Lc:l'll revealed an apparent: small perforation :in the fue1 clad. Subsequent ins-pact:ion revea1ed no*additi.onal damage to any asse::m.blies that vere adjacent. to the moving assembly at. the time of the incident. -,
-***-Very t:ruly yours.
-J .;...tu ~-;,;.... .
E. M. Sweeney. Jr ..
- ManageJ:
/
/
I'