Letter Schedule for Responding to Request for Additional Information on Double-Ended Pump Suction Pipe Break Loss of Coolant Accident
ML19105A037
Person / Time
Site: Surry  Dominion icon.png
Issue date: 07/08/1977
From: Stallings C
Virginia Electric & Power Co (VEPCO)
To: Case E, Reid R
Office of Nuclear Reactor Regulation
References
Download: ML19105A037 (2)


Text

...

I;


~

e VIRGINIA ELECTRIC AND RICHMOND, VIRGINIA. 23261 July 8, 11977: :

Mr. Edson G. Case Acting Director of Nuclear Reactor Regulation United States Nuciear.Regulatory Commission Washington, D. C. 20555 Attn: Mr. Robert W. Reid, Chief Operating Reactors Branch 4

Dear Mr. Case:

e Serial No. 260/061677, PO&M/ ALH :.dgt Docket Nos. 50-280 50-281 License Nos. DPR-32 DPR-37 This is in response to your letter of June 16, 1977wherein you re-quested information.regarding a double-ended pump suction pipe break loss of coolant accident.

As you are aware, this analysis. has never been re-quired at Surry and the information is not readily available.

We have taken steps to acquire the requested information from our Architect-Engineer, but will be unable to do so in the time specified in your letter.

We expect to have the information in final form in the second week of August, and should be able to complete our review and forward our re-sponse to you by August 31, 1977,.

Very truly yours,

%<~

  • .c. M. Stallings P-Vice President-Power Supply and Production Operations cc: Mr. Norman C. Moseley

~ --~.. ~.~-.. ~;-;~,-.