e VIRGINIA ELECTRIC AND POWER COMP.A.

RIOHMOND, VIRGINIA 23261 July 12;

  • l:977,
  • Mr. Edson G. Case,.. Acting Director Office of NucTear* Reactor Regulation Attention:

Mr. R. W. Reid,

  • Chief I t..,,

File Cy._

R:egu _a: _2ferial Ne-. -2"8*0 LQA/DWSj r: krb Operating Reactors 'Branch Division of Operating: Reactors u.* s.* Nuclear Re.gulatory Commission Washington,.D. C.*

2.0555

  • Docket Nos.. 50-280

. 50....;.281 License Nds. DPR~32 DPR-37. *

Dear Mr.. Case:

On June 17,.1977, we.forwarded to the Nuclear.Re.gulatory Commission one copy of our Appendix I analysis for Sur,ry :i?ower Sta-tion along with *one copy of other supportive. information.

In a recent telephone request by your Project 'Managenierit Sta£ f,.we were requested to make *available* for.ty ( 40). copies of the subm:i ttal. It is therefore, the purpose of this letter to transmit forty '(4.0.).

copies. of the following information contained in the June *.17,,1977 letter:

1.

Appendix T Analys*is, Surry Power. Station, Units. 1 and 2,.June,,:.1977..

2.

Appendix I Cost/B_enefit Analysis, Surry Urii ts 1 and: 2, June, 19'7 7.'

3.

Appendices. 2.'.4-'.A and 2.5-B of Appendix I Analysis..

4.

Appendix 2. 9 of the Appendix I Analysis.*

.Attachnierits cc:

Mr. Norman C. Mo*seley ve:rY: truly yours,*

~- J?/J. ~a;~,.a/

C. M. Stallings

  • Vice Pres.ident-Power. Supply and: Production Operations
  • Mr. Edson G. Case Acting Director of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D. C. 20555 Attn:

Mr. Robert W. Reid, Chief Operating Reactors Branch 4

Dear Mr. Case:

Serial No. 247 PO&M/JTB:nkw Docket Nos. 50-280 50-281 License Nos. DPR-32 DPR-37 Attached for your use and information are two.reports entitled "Appendix I Analysis, Surry Power Station, Unit Nos. 1 and 2," dated June, 1977 and "Appendix I Cost/Benefit Analysis, Surry Units 1 and 2," dated June, 1977.

Appendices 2.5 and 2.9 of the Appendix I Analysis are included as separate documents~

Please note that the Appendix I analysis uses the relative deposition (D/Q) values which were originally included in Regulatory Guide 1,111 (RG 1.111).

The D/Q values were recently revised downward in RG 1.111; therefore, the D/Q values used in the enclosed analysis are overestimated by as much as a factor of two (2).

Therefore, our results are conservative.

Much of the information contained in the attached reports has been pre-viously submitted to you; however, for completeness, it has been reiterated in the reports~

These reports complete our submittals in Appendix I, 10 CFR 50.

Attachments*

  • cc:

Mr. Norman C. Moseley OR.

Very 1:fi. yours, A'

/fl, I,

,1tf!a!YU/JV 4/.

, Stallings

  • o_;

Vice B esident-Powet Supply and/J?roduction Operations

RECEf VEO OOCUMEHT PROCESS!t-JG UNlT 1977 JUN 20 AM 7 5 I

,;...