ML19098B458

From kanterella
Jump to navigation Jump to search
Submit Annual Operating Report for 1976
ML19098B458
Person / Time
Site: Surry  Dominion icon.png
Issue date: 03/25/1977
From: Stallings C
Virginia Electric & Power Co (VEPCO)
To: Moseley N
NRC/RGN-II
References
Serial No. 097
Download: ML19098B458 (1)


Text

VIRGINIA ELECTRIC AND POWER COMP.A RICHMOND, VIRGINIA 23261 Match 25, 1977 Mr. Nonnan c. Moseley, Director Office of Inspection and Enforcement

u. s. Nuclear Regulatory Cormnission Region II - Suite 818 230 Peachtree Street, Northwest Atlanta, Georgia 30303

Dear Mr. Moseley:

Serial No. 097 PO&M/ALH:dgt Docket Nos. 50-280 50-281 License Nos. DPR-32 DPR-37 In accordance with 0 Technical Specification 6.6.1.b for the Surry Power Station, Unit Nos. 1 and 2, the Virginia Electric and Power Company hereby submits one (1) copy of the Annual Operating Report for 1976. By copy of this letter, thirty nine (39) copies are being forwarded to Mr.

Robert W. Reid in the NRG Headquarters, Bethesda, Maryland.

Very truly yours,

~- })/)_J}adM,r,/

c. M. Stallings Vice President-Power Supply and Production Operations Attachment cc: Mr. Robert W. Reid, Chief Operating Reactors Branch 4 39 copies