ML19098B457

From kanterella
Jump to navigation Jump to search
Submit Three VEPCO Reports (VEP-FRD-21, VEP-FRD-22, VEP-FRD-25) on Surry 1 & 2 Startup Physics Tests & Core Performance
ML19098B457
Person / Time
Site: Surry  Dominion icon.png
Issue date: 03/25/1977
From: Thomas W
Virginia Electric & Power Co (VEPCO)
To: Reid R, Rusche B
Office of Nuclear Reactor Regulation
References
Serial No. 127
Download: ML19098B457 (1)


Text

VIRGINIA ELECTRIC A:ND POWER COMPANY RICHMOND, VIRGINIA 23261 March 25, 1977 Mr. Benard C. Rusche, Director Office of Nuclear Reactor Regulation Attn:

Mr. Robert W. Reid, Chief Operating Reactors Branch No. 4 Division of Operating Reactors U. S. Nuclear Regulatory Commission Washington, D. C.

20555

Dear Mr. Rusche:

Serial No. -127 FR/JTR:cjw

. Docket Nos.: -50..;280

. 50...:281*

For your information, enclosed are five copies of the following Vepco topical.reports on Surry 1 and 2 startup physics tests and core performance:

VEP-FRD-21, "Surry Unit 2, Core Performance Report,*. Cycle 2" VEP-FRD-22, "Surry Unit 2, Startup Physics Test Report, Cycle 3"'

VEP-FRD-.25, "Surry Unit 1, Core Performance Report,* Cycle 311*

Although the contents of these reports are included in the Annual Operating Report for the Surry Power Sta~ion which has recently been sent to the NRC, these copies are being sent separately for your convenience.

Should you have any questions, please contact us.

Enclosures cc:

Mr. Norman C. Moseley W. N *. Thomas Vice President Fuel Resources Office of Inspection and Enforcement Region II