ML19098B406

From kanterella
Jump to navigation Jump to search
Response to Request for Additional Information Proposed Inspection Program for Steam Generators
ML19098B406
Person / Time
Site: Surry  Dominion icon.png
Issue date: 02/11/1977
From: Stallings C
Virginia Electric & Power Co (VEPCO)
To: Reid R, Rusche B
Office of Nuclear Reactor Regulation
References
Download: ML19098B406 (5)


Text

--

e e

0;,J Jj f()-.,

.._~/

¥IRGINIA ELECTRIC AND POWER COMPANY oocKE1ED RIOHMOND VIRGINIA 23261

µsN&C A

q.A '"'

,EGUlATO&Y u.s. "'coMMISS\\Ot-1 Mall Section ,c. February 11, 1977 : JR!egulatory Docket File I Mr. Benard C. Rusche Director of Nuclear Reactor Regulation

u. s. Nuclear Regulatory Commission Washington, D. C.

20555 Serial No. 353A/113076 PO&M/ALH:dgt

  • Attn:

Mr. Robert W. Reid, Chief Operating Reactors Branch 4

Dear Mr. Rusche:

Docket Nos. 50-280 50-281 License Nos. DPR-32 DPR-37 This is in response to your letter of November 26, 1976 wherein you requested information regarding our proposed inspection program for Surry Unit No. 2 steam generators. The details of this program are provided in the attachment to,this letter. We intend to conduct this program within the 61 days of operation above 350 degrees F authorized in Technical Specification Amendment No. 26.

We believe that the inspection program will show that no cracking of U-bends has occurred in row 2 and beyond. The preventive plugging program which results in plugging all of rows 1', 2, and the most strained row 3 tubes, is conservative and should prevent future U-bend leaks. This con-clusion is fully supported by data presented in our letter serial no.

260C/092276 of January 3, 1977 which shows that the total equivalent. strain in row 2 and beyond at full flow slot closure is less than the equivalent manufacturing strain in row 1 tubes that had~ developed flaw indications.

Since all row 1 tubes are plugged, we believe that no further U-bend failures will occur.

Even though the special eddy current equipment required to detect flaws in dented regions may not be developed in time to be used during the scheduled outage period, we believe that the preventive plugging program presented in the attachment also adequately addresses leaky dent problems.

This plugging program was developed as a result of field data and analytical work (Vepco serial nos. 260C/092276 and 260D/092276) and should result in minimizing the occurrence of leaky dents.

Our program for continued operation of Surry Unit No. 2 is also presented in the attachment to this letter. We have taken the same approach that was agreed upon for Surry Unit No. 1 by members of your staff during j_G69

  • ..,... ~-

e e

VIRGINIA ELECTRIC AND POWER COMPANY TO Benard C. Rusche Page 2 a meeting on February 8, 1977. We therefore request your approval to operate Surry Unit No. 2 as described herein.

Attachment cc: Mr. Norman C. Moseley Very truly yours, ZP. m. ~au,;,~

C. M. Stallings Vice President-Power Supply and Production operations

r e

1. Inspection of steam generator tubes and internals A. Steam generator tubes
1. U-bends: All available tubes in each steam generator, in rows 2 through 5, will be inspected through the U-bend using the "540 beaded-flex" eddy current probe at 100 KHz. Any flaw indications found in the U-bends will be reinspected at 400 KHz with the "540 beaded-flex" probe.
2. Leaky dents: A special eddy current probe designed to provide meaningful data in dented regions is not yet fully developed.

The latest infonnation from Westinghouse indicated the probe will not be developed in a field worthy fonn before the end of February 1977. Therefore, no eddy current inspection of dented tubes is planned. However, if a field worthy eddy current probe becomes available, tubes in known dented regions will be in-spected.

B. Steam generator internals

1. Tube support plates: The flow slots in the lower tube support plate will be gauged. This infonnation will be used to verify the tube support plate expansion rate.
2. Other internals: Detailed visual inspections will be conducted through the handholes of each steam generator to assess the general conditions of the steam generator internals. Photographic and video tape records of this inspection will be made if possible.
2. Preventive plugging A. The preventive plugging program shown in figure 1 will be implemented in each steam generator. Since Unit No. 2 steam generators already have a significant number of tubes plugged, this program will result in all of row 1, 2, and the most strained tubes in row 3 being plugged.

The program for leaky dents will be the same as as that perfonnance on Unit No. 1.

3. Program for continued operation A. After completing 61 equivalent days and completion of the program described herein, we request approval for Surry Unit No. 2 to operate for 60 equivalent days at a reactor coolant temperature greater than 350 degrees F. The following restrictions on reactor operation apply:
1. Unit No. 2 shall be brought to the cold shutdown condition in order to perform an inspection of the steam generators within 60 equivalent days of operation from approval date.

Nuclear*..

Regulatory Commission approval shall be obtained before resuming power operation following this operating period.

r' For the purpose of this requirement, equivalent operation is defined as operation with a primary coolant temperature greater than 350 degrees F.

2. Total primary to secondary leakage shall be limited to 1.0 gpm-

)

and primary to secondary leakage through each steam generator shall be limited to 0.3 gpm. With any steam generator tube leak-age greater than this limit the reactor shall be brought to the cold shutdown condition within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

3. Reactor operation wiil be terminated if primary to secondary leakage which is attributable to 2 or more tubes occurs during a 20 day period. Nuclear Regulatory Commission approval shall be obtained before resuming reactor operation.
4. The concentration of radioiodine in the primary coolant shall be limited to 1 microcurie per gram during normal operation and to 30 microcuries per gram during power transients as defined in the Safety Evaluation.

. /

I'

. *(

-.)

-~:

..... ~-~..-...

I I

~

I~

~

>=-. '.. :..

~

I', I

-:... \\,.

L*

'I

, *.' f

~

~3-,zzoN*

  • t**.......... '.
  • I. *
  • ' 'I *,.,.... '
  • I I

AV/V\\N'vW~.*:::.~ ** *

-~-

I. ~ "*.

  • ..s.

..... ~.

~

  • I *e ~

... ~

.... i

.... -..'4

.. *.*.-,*~*

.. *;... :.9.* ****

1*

~... *..

~. -~.** ~.. ;_

  • *et.

I I

  • . * *. '4 1

~....,'.

        • -r-*..;,.,Jt*-

.*.. *: *** I?

.; ~....

~*

  • t *. *

~.

'.I'*..

  • I L

tlffll;:t..t:i::&v=~Ullt~

.. 't *

  • I*!: s-.:J*_u~.s..

l

'f;J

. I

.-1,I.U..M l

  • * * ~

.......... 1..... *

......... ~*

..... *1

.l

    • ~~.* -
      • i*. *;-..
  • I *

~................

i.
  • 1
  • * ~

I

  • t

~.,

I t

~ *

... **, r*~*.. i. *...

.~

i-*

... '~,*

,,,* f*

~,*****,

,* **i'!. 1

_.,.* e *'

1 I

I **.** '

, **,~,.....,,

  • ,,.. I

, * **

  • J.
  • ti
  • 1*.....,. ~ *,. i...
  • ~' :

~. *

  • \\

. ~.

. ** \\i........

  • v.. ****l **,**,t.. :-.., "'., 'c. *****.**, ** *~.

, ; * *** ****-~\\,.

,:*.  ; *. L.. I:.

\\

' '...., **: f*

r.. '.

I.*

  • .~ ~

I..,

  • /

. t t' I 14' : '

1

,* I

~

  • *** I
  • **I..

I

'*** '*r:.:,~:.- **: * *. -~-t.. -~!-/1 * *'.:, *...,,* 0 *

  • .:'.* :***., *:*,I *.: :...... **.:._:i:, '.'.* 1* *. I
  • .. : _';.. :1 ;, °i~*

I.

0 J. *.

o

,f.1..... ti,e.~

  • l...

~

01

.* ~** I'll... J

  • 9, I* t I...

..*.*:t.~** -~.~., ~....,,..*;*...... ~

.....,ri*'.i~... **~*~"-*-~-=!'..* *~*.*

..,.:..,_.......,.. :,.,,,..*. ~,_.,...

., ~

.....,...,..,. *............ :....iu............ *

  • , r***t.~.... """".........
  • 1i. *. *"'*.... ~-..,....,,............
    • -.*~*,*,*r** *.
  • 'i"'**'.... _..,. * "'

1

,.. "