ML19098B323

From kanterella
Jump to navigation Jump to search
Submit Preliminary Results of Inservice Inspection Program, Refueling Outage No. 1 for Surry Power Station, Unit No. 1
ML19098B323
Person / Time
Site: Surry  
Issue date: 01/22/1975
From: Stallings C
Virginia Electric & Power Co (VEPCO)
To: Goller K
Office of Nuclear Reactor Regulation
References
Serial No. 409
Download: ML19098B323 (1)


Text

..

VIRGINIA ELECTRIC AND POWER COMPANY RIOHMOND, VIRGINIA 2 3 2 61 January 22, 1975 Mr. K. R. Goller, Assistant Director for Operating Reactors Directorate of Licensing Office of Regulation United States Atomic Energy Commission Washington, D. C.

20545

Dear Mr. Goller:

Serial No. 409 PO&M/JTB:clw Docket Nos. 50-280 50-281 License Nos. DPR-32 DPR-37 Pursuant to Technical Specification,6.6.C for the Surry Power Station, Unit Nos. 1 and 2, the Virginia Electric and Power Company hereby submits forty (40) copies of the document entitled Preliminary Results of the Inservice Inspection Program, Refueling Outage No._!_ for the Surry Power Station, Unit No. 1.

This report summarizes the results of the inservice inspection program recently completed during the first refueling outage of Unit No. 1.

The results of the examinations and the corrective action taken where indications were noted assure the integrity of the systems and.components inspected are, therefore, capable of safely performing their design function.

We presently plan to return Unit No. 1 to service on or about January 25, 1975.

Very truly yours,

'&.}l)ix/i~

C. M. Stallings Vice President-Power Supply and Production Operations Enclosures 40 copies of Inservice Inspection Program cc:

Mr. Norman C. Moseley 881