ML19098B323
| ML19098B323 | |
| Person / Time | |
|---|---|
| Site: | Surry |
| Issue date: | 01/22/1975 |
| From: | Stallings C Virginia Electric & Power Co (VEPCO) |
| To: | Goller K Office of Nuclear Reactor Regulation |
| References | |
| Serial No. 409 | |
| Download: ML19098B323 (1) | |
Text
..
VIRGINIA ELECTRIC AND POWER COMPANY RIOHMOND, VIRGINIA 2 3 2 61 January 22, 1975 Mr. K. R. Goller, Assistant Director for Operating Reactors Directorate of Licensing Office of Regulation United States Atomic Energy Commission Washington, D. C.
20545
Dear Mr. Goller:
Serial No. 409 PO&M/JTB:clw Docket Nos. 50-280 50-281 License Nos. DPR-32 DPR-37 Pursuant to Technical Specification,6.6.C for the Surry Power Station, Unit Nos. 1 and 2, the Virginia Electric and Power Company hereby submits forty (40) copies of the document entitled Preliminary Results of the Inservice Inspection Program, Refueling Outage No._!_ for the Surry Power Station, Unit No. 1.
This report summarizes the results of the inservice inspection program recently completed during the first refueling outage of Unit No. 1.
The results of the examinations and the corrective action taken where indications were noted assure the integrity of the systems and.components inspected are, therefore, capable of safely performing their design function.
We presently plan to return Unit No. 1 to service on or about January 25, 1975.
Very truly yours,
'&.}l)ix/i~
C. M. Stallings Vice President-Power Supply and Production Operations Enclosures 40 copies of Inservice Inspection Program cc:
Mr. Norman C. Moseley 881