Response to Request of 5/13/1975 for Secondary System Fluid Flow Instability Information in 60 Days, Advising, It Takes 6 Months to Adequately Investigate
ML19098B312
Person / Time
Site: Surry  Dominion icon.png
Issue date: 06/09/1975
From: Stallings C
Virginia Electric & Power Co (VEPCO)
To: Goller K
Office of Nuclear Reactor Regulation
References
Serial No. 533/051375
Download: ML19098B312 (1)


Text

e June 9, 1975 Mr. K. R. Goller, Assistant Director for Operating Reactors Division of Reactor Licensing Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Connnission Washington, D. C.

20555

Dear Mr. Goller:

Serial No. -533/051375

. PO&M_/ CMS : clw Docket License Nos.i=UP Nos~ DPR-32 DPR-37 With reference to your request of May 13, 1975 that.we supply you with information on secondary system fluid flow instability, we will be glad to comply with your request, but it will be impossible to do it within sixty days because it will take six months for us to adequately. investigate the matter and report to you.

I trust that this schedule will be satisfactory with yqu.

Very truly yours,

-tiJ.111.. 0/d~

C. M~ Stallings Vice President-Power Supply and Production Operations 6358