ML19098B308

From kanterella
Jump to navigation Jump to search
Refer to NRC Letter of 6/30/1975, Advising VEPCO Do Not Plan to Utilize Fuel Assembly N-20 in Surry Unit 2 Beyond Second Cycle
ML19098B308
Person / Time
Site: Surry  Dominion icon.png
Issue date: 07/16/1975
From: Stallings C
Virginia Electric & Power Co (VEPCO)
To: Purple R
Office of Nuclear Reactor Regulation
References
Serial No. 590/063075
Download: ML19098B308 (1)


Text

..,._

e Vepco VIRGINIA ELECTRIC AND POWER COMPANY, RICHMOND, VIRGINIA 23261 Mr. Robert A. Purple, Chief Operating Reactors Branch /fl Division of Reactor Licensing Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D. c.* 20555

Dear Mr. Purple:

July 16, 197 5,

~~f::Jjl{fpfto IJ file Cy.

Serial No. 590/063075 LQA/WFB: eel.

Docket Nos. 50-280 50-281 This is in reference to your letter of June 30, 1975 in which you advised that while continued operation of fuel assembly N-20 in the second cycle core of Surry Unit No. 2 was acceptable, further utilization of that assembly beyond the end of the second cycle would require a detailed examination inclusive of backup analytical work and a specific surveillance plan.

All factors considered, we hereby* advise you that.we do not plan to utilize fuel assembly N-20 in Surry Unit No. 2.beyond the second cycle.

Very truly yours,

'Zo.20. #atkvp/

C. M. Stalli_ngs Vice President - Power. Supply.

and Production Operations 7862

\\