MONTHYEAR05000280/LER-2024-001, Troubleshooting Initiated Unknown Turbine Trip Feature in Control System2024-07-30030 July 2024 Troubleshooting Initiated Unknown Turbine Trip Feature in Control System 05000280/LER-2022-003, Loss of Emergency Switchgear Room Cooling Due to Use of Incorrect Air Handler Fan V-Belts2022-11-11011 November 2022 Loss of Emergency Switchgear Room Cooling Due to Use of Incorrect Air Handler Fan V-Belts 05000280/LER-2022-002, Failure of Unit 1 Emergency Diesel Generator Results in an Operation or Condition Prohibited by Technical Specifications2022-09-19019 September 2022 Failure of Unit 1 Emergency Diesel Generator Results in an Operation or Condition Prohibited by Technical Specifications 05000281/LER-2020-001, Cancellation of LER 2020-001-00 for Surry Power Station Unit 2 Re Loss of Containment Cooling Affecting Containment Partial Pressure Indication2020-11-0606 November 2020 Cancellation of LER 2020-001-00 for Surry Power Station Unit 2 Re Loss of Containment Cooling Affecting Containment Partial Pressure Indication 05000280/LER-2019-0022020-02-0404 February 2020 LER 2019-002-00 for Surry Power Station Unit 1, Items Non-Conforming to Design for Tornado Missile Protection 05000280/LER-2017-0012017-10-0606 October 2017 1 OF 3, LER 17-001-00 for Surry, Unit 1, Regarding Shutdown due to an Unisolable Leak in Reactor Coolant Pressure Boundary 05000281/LER-2016-0012016-12-0202 December 2016 Unit 2 Reactor Trip due to Generator Differential Lockout, LER 16-001-00 for Surry Power Station, Unit 2, Regarding Reactor Trip Due to Generator Differential Lockout 05000280/LER-2016-0012016-07-11011 July 2016 1 OF 4, LER 16-001-00 for Surry Power Station, Unit 1 and 2, Regarding Emergency Service Water Pump Inoperable Due to Corrosion of Valve Support ML1015505662009-03-0404 March 2009 Event Notification for Surry on Relief Valve Failure Results in Tritium and Cesium Spill ML0702501902007-01-17017 January 2007 Special Report on Qpt Not Less than Two Percent for Twenty Four Hours ML19105B1281979-08-21021 August 1979 LER 1979-011-03X for Surry Units 1 & 2 Loss of Power with Both Units at Cold Shutdown, Observed Radiation Monitors Without Power ML19093B4141978-09-26026 September 1978 Reporting Condenser Cooling Water Outlet Temperature to James River Decreased by 3.5oF as Measured at Station Discharge Structure ML19105A3001978-09-0808 September 1978 LER 78-013-03X-1, LER 78-029-03L-0, & LER 78-031-03L-0 for Surry 2 Re Critical Below Minimum Insertion Limit on D Control Bank ML19105A3011978-09-0101 September 1978 LER 1978-028-03L-0 for Surry 2 Re Containment Pressure Exceeded Allowable Limit ML19095A4971978-08-25025 August 1978 Submit Licensee Event Report No. LER 78-024/03L-0 Re No Alarm During a Planned Release of Liquid Radioactive Waste ML19095A4981978-08-22022 August 1978 Submit Licensee Event Report Nos. LER 1978-019/03L-0, LER 1978-021/03L-0, LER 1978-022/03L-0, LER 1978-023/03L-0, LER 1978-025/03L-0, LER 1978-026/03L-0 for Surry Unit No. 1 ML19105A0781978-08-16016 August 1978 Submit LER 78-027/03L-0 Re Seven Snubbers Not Meeting Inspection Criteria ML19105A0771978-08-16016 August 1978 Submit LER 78-027/03L-0 Re Seven Snubbers Not Meeting Inspection Criteria ML19105A0791978-08-11011 August 1978 LER 78-026/03L-0. Follow-up Inspection for Valve Cleanliness, Discovered That Containment Spray Isolation Valves (MOV-CS-201C and D) Contained No More That Five Milliliters. Technical Specification TS 6.6.2.b.(3) ML19095A4991978-08-0404 August 1978 Sutmit Licensee Event Report No. LER 78-018/03L-0 Re Two Main Steam Safety Valves Were Not within Plus or Minus 3% of Setpoint as Required ML19105A0801978-07-28028 July 1978 LER 1978-022-03L-0 Re Axial Power Distribution Monitoring Was Exceeded,& Three LERs 1978-021-03L-0, LER 1978-023-03L-0, & LER 1978-024-03L-0 Re Inlet Circulating Water Temperature Exceeded ML19095A5001978-07-28028 July 1978 Submit Licensee Event Report Nos. LER 78-017/03L-0 Re Not Documenting Four Electric Maintenance Procedures & Two Periodic Tests, & 78-020/03L-0 Re Suspended Air Bubbles in Reservoir Fluid ML19095A2281978-07-27027 July 1978 Reporting & Providing Additional Information on Incidence of Missing Two Steam Generator Tube Plugs Found During Inspection ML19095A2291978-07-26026 July 1978 Reporting of Cooling Water Discharge Temperature Change Rate on 7/9/1978 & Found No Evidence of Any Detrimental Effects in River or Its Inhabitants ML19095A5011978-07-21021 July 1978 Submit Licensee Event Report No. LER 78-016/03L-0 Re Valve MOV-RH-100 Was Not Opening ML19105A0821978-07-17017 July 1978 LER 1978-025-03L for Surry Unit 2 Excessive Gap Around Battery Room Ventilation Duct ML19105A0811978-07-17017 July 1978 LER 1978-025-03L for Surry Unit 2 Excessive Gap Around Battery Room Ventilation Duct ML19095A5021978-07-0707 July 1978 Submit Licensee Event Report Nos. LER 78-013/03L-0 Re Six Snubbers Not Meeting Test Criteria, & 78-014/03L-0 Re Mount Plate Was Warped, & 3 of 8 Bolts Were Insufficiently Embedded ML19095A5041978-06-27027 June 1978 Submit Licensee Event Report No. LER-78-015/03L-0 Re Valve Cleanliness Inspection Found Foreign Material on Valve Seating Surfaces ML19095A5031978-06-27027 June 1978 Submit Licensee Event Report No. LER-78-015/03L-0 Re Valve Cleanliness Inspection Found Foreign Material on Valve Seating Surfaces ML19105A0831978-06-23023 June 1978 LER 1978-017-03L, LER 1978-018-03L, LER 1978-019-03L, & LER 1978-020-03L for Surry Unit 2 Related to Snubbers ML19095A2481978-06-19019 June 1978 06/19/1978 Letter Reporting Increase of Condenser Cooling Water Discharge ML19095A5051978-06-0707 June 1978 Submit Licensee Event Report No. LER-78-012/03L-0 Re Inside Recirculation Spray Pump 1-RS-P-1A, Failure to Rotate by Hand ML19105A0851978-05-23023 May 1978 LER 1978-015-03L for Surry Unit 2 Finding of Air Leak on Header of Control Room Emergency Air Supply Bank ML19095A5061978-05-23023 May 1978 Submit Licensee Event Report Nos. LER-78-008/03L-0, LER-78-009/03L-0, LER-78-010/03L-0, LER-78-011/03L-0 for Surry Unit No. 1 ML19105A0861978-05-12012 May 1978 LER 1978-013-03L for Surry Unit 2 Reactor Brought Critical Below Minimum Insertion Limit on D Control Bank ML19105A0871978-05-0505 May 1978 LER 1978-014-03L for Surry Unit 2 Charging Pump Service Water Pump a Tripped on High Current ML19095A5071978-05-0505 May 1978 Submit Licensee Event Report No. LER-78-007/03L-0 Re Leak on Body to Bonnet Joint Diaphragm Valve 1-CH-98 ML19105A0881978-04-19019 April 1978 LER 1978-006-01T for Surry Unit 2 Review of Fire Protection Yard Piping Revealed That Two Pipe Extensions May Not Have Been Seismically Qualified ML19095A5081978-04-19019 April 1978 Submit Licensee Event Report No. LER-78-006/01T-0 Re Seismically Disqualified Two Pipe Extensions on Fire Protection Yard Piping ML19095A5091978-04-0707 April 1978 Forwarding Licensee Event Report No. LER-78-005/01T-0 Re Westinghouse'S Error in LOCA-ECCS Evaluation Model, Which Will Result in Higher Calculated Peak Clad Temperature ML19105A0901978-04-0606 April 1978 LER 1978-012-01T for Surry Unit 2 Failure to Meet Containment Integrity ML19095A5101978-04-0404 April 1978 Submit Licensee Event Report No. LER-78-004/03L-0 Re Loss of Service Water Flow Through Charging Pump Intermediate Seal Cooler ML19105A0921978-04-0404 April 1978 LER 1978-011-03L for Surry Unit 1 Loss of Service Water Flow Through Charging Pump Intermediate Seal Cooler ML19105A0931978-03-30030 March 1978 LER 1978-008-03L Re Snubber Body in Contact with Structure; LER 1978-009-03L Re Trip of Boric Acid Transfer Pump; & LER 1978-010-03L Re Failure of Pressurizer Channel ML19095A5111978-03-28028 March 1978 Submit Licensee Event Report No. LER-78-003/03L-0 Re Failed Heat Tracing, Panel 8 Circuit 24 ML19095A5121978-03-21021 March 1978 Submit Licensee Event Report No. LER-78-002/01T-0 Re Additional Radial Peaking Factor Surveillance ML19105A0941978-02-27027 February 1978 LER 1978-006-03L Re Failure of Sola Transformer, & LER 1978-007-03L Re Trip of Boric Acid Transfer Pump on Thermal Overload ML19095A5131978-02-24024 February 1978 Submit Licensee Event Report No. LER-78-001/03L-0 Re Hydraulic Shock Suppressor Found Inverted with Empty Reservoir ML19105A0951978-02-16016 February 1978 LER 1978-003-03L Re Erroneous Readings of Loop a Hot Leg Temperature Protection Channel; LER 1978-004-03L Re Unqualified Welding of Two Diaphragm Welds on Heat Exchanger; & LER 1978-005-03L Re Low Current Condition from Heat Tracing 2024-07-30
[Table view] |
Text
! -,...
,'; e
- Mr. K. R. Goller, Assistant Director Serial No. 609 for Operating Reactors PO&M/JTB:clw Division of Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-280 U.S. Nuclear Regulatory Commission 50-281 Washington, D. C. 20555 License ~OS, DPR~32 DPR-37
Dear Mr. Goller:
In accordance with the Surry Power Station, Unit Nos. 1 and 2, Technical Specifications, this is to notify you of an incident during which the thermal limitations on the condenser cooling water discharge were exceeded.
The incident occurred on July.11, 1975 while escalating power on Unit No.
2 following a unit start-up. The unit was at approximately 48 per.cent of rated thermal power and 340 MWe. At this time during the power escalation, two circulating water pumps were.started and the condenser outlet valves positioned to maintain intake canal level. Subsequent monitoring of the cir-culating water temperatures revealed that .the increase in flow thro_ugh .the condenser caused the temperature at the discharge control structure to decrease 3.5 degrees Fin approximately fifteen (15) minutes. There was no.further de-crease in the discharge temperature during the hour. Technical Specification 4,14.A.3 requires that the cooling water temperature at the discharge control structure not exceed an average *rate of change of 3 degrees F per hour. There was *no evidence of any adverse environmental impact caused by the incident.
Analysis of the occurrence indicates that the rate of circulating water flow through the condenser was increased too rapidly. In order to prevent recurrence, operating personnel have.been instructed to exercise more caution when operating the condenser water boxes and to monitor the circulating water
.temperatures closeiy during the operation. The operating procedures *for the circulating water system are being revised to.reflect these precautions and to limit starting of the circulati~g water pumps to one at a time at sufficient intervals to avoid exceeding the maximum rate of change of temperature at the discharge c~ut~structure.
<p i I ':"i(;,,,
~--/
c)l'<'t~, §*, ~t Very truly yours, i:\:::* .
. o\\c;,~~ . , ..
(\C?>1(lv7 -
\ \\ U
\ \J _. , ~oi-"' 1 9 C. M. ings
~e President-Power Supply
\-:.
t _.., ..-
.J
~ .S*'
~._~r~\~~,!s:C:,~
er"**\ Se<")' ~ Production Operations
\ (; \; N'n\
\.()~_ **, ..... , n---r1 ' --<<":-,.,
\ ,.. . ,.,
"', I '/ I, I ' ~,::::--*"'""
7819