Similar Documents at Surry |
---|
Category:Letter
MONTHYEARIR 05000280/20244012024-02-0606 February 2024 Security Baseline Inspection Report 05000280/2024401, 05000281/2024401 and 07200002/2024401 IR 05000280/20230102024-01-18018 January 2024 Age Related Degradation Inspection Report 05000280-2023010 and 05000281-2023010 ML23312A1922024-01-18018 January 2024 Issuance of Amendment Nos. 316 & 316 Regarding a Risk Informed Approach for Tornado Classification of the Fuel Handling Trolley Support Structure ML24003A9022024-01-0303 January 2024 Stations, Units 1 and 2, Emergency Plan Revision - Relocation of the Technical Support Center (TSC) - Editorial Correction IR 05000280/20233012023-12-28028 December 2023 NRC Operator License Examination Report 05000280/2023301 and 05000281/2023301 ML23283A3052023-12-20020 December 2023 Review of Appendix F to DOM-NAF2, Qualification of the Framatome ORFEO-GAIA and ORFEO-NMGRID CHF Correlations in the Dominion Energy VIPRE-D Computer Code (EPID L-2022-LLT-0003) (Nonproprietary) ML23352A3692023-12-18018 December 2023 Associated Independent Spent Fuel Storage Installation, Revision to Emergency Plan Report of Change ML23334A2342023-11-30030 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23242A2292023-11-0707 November 2023 Issuance of Amendment Nos. 315 and 315, Regarding Emergency Procedure Relocation of the Technical Support Center ML23200A2622023-11-0202 November 2023 Issuance of Amendment Nos. 314 and 314, Regarding Technical Specification and Spent Fuel Pool Criticality Change IR 05000280/20230032023-10-25025 October 2023 Integrated Inspection Report 05000280/2023003 and 05000281/2023003 ML23286A0372023-10-13013 October 2023 Annual Submittal of Technical Specifications Bases Changes Pursuant to Technical Specification 6.4.J ML23285A0922023-10-12012 October 2023 Inservice Testing Program for Pumps and Valves Sixth Interval Update and Associated Relief and Alternative Requests ML23277A1172023-10-0303 October 2023 Operator Licensing Examination Approval 05000280/2023301 and 05000281/2023301 ML23230A0502023-10-0202 October 2023 5 of the Quality Assurance Topical Report - Review of Program Changes ML23256A2672023-09-21021 September 2023 Review of the Fall 2022 Steam Generator Tube Inspection Report ML23244A2352023-09-18018 September 2023 Request to Use a Subsequent Edition of the ASME Code, Section XI ML23230A0012023-09-15015 September 2023 Request to Use a Provision of a Previous Edition of the ASME Boiler and Pressure Vessel Code, Section XI, for Non-Destructive Examinations IR 05000280/20220042023-09-0101 September 2023 Reissue - Surry Power Station - Integrated Inspection Report 05000280/2022004 and 05000281/2022004 ML23244A0142023-08-30030 August 2023 Inservice Inspection Owner'S Activity Report IR 05000280/20230052023-08-23023 August 2023 Updated Inspection Plan for Surry Power Station, Units 1 and 2 (Report 05000280/2023005 and 05000281/2023005) ML23226A1862023-08-10010 August 2023 Proposed License Amendment Request - Reclassification of Regulatory Guide 1.97 Variable for Low Head Safety Injection Flow Instrumentation ML23220A1492023-08-0707 August 2023 Independent Spent Fuel Storage Installation - Submittal of Cask Registrations for Spent Fuel Storage ML23220A1482023-08-0707 August 2023 Proposed Emergency Plan Revision - Relocation of the Technical Support Center (TSC) Response to Request for Additional Information IR 05000280/20230022023-08-0404 August 2023 Integrated Inspection Report 05000280/2023002 and 05000281/2023002 ML23208A0922023-07-26026 July 2023 Request for Approval of Appendix F of Fleet Report DOM-NAF-2-P Qualification of Framatome ORFEO-GAIA and OORFE-NMGRID CHF Correlations in the Dominion Energy Vipre-D Computer Code Response ML23207A1102023-07-26026 July 2023 NRC Regulatory Issues Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations ML23198A0322023-07-18018 July 2023 Regulatory Audit Report Regarding Review of License Amendment to Modify Emergency Plan Staff Augmentation Times ML23193A9382023-07-18018 July 2023 Closeout of Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors ML23173A0602023-07-11011 July 2023 Audit Summary for License Amendment Request Revision of the Emergency Plan to Support Relocation of the Technical Support Center ML23136B1392023-06-29029 June 2023 Issuance of Amendment No. 313 Administrative Changes to Subsequent Renewed Operating Licenses and Technical Specifications ML23178A1682023-06-26026 June 2023 2022 Annual Report of Emergency Core Cooling System (ECCS) Model Changes Pursuant to the Requirements of 10 CFR 50.46 ML23152A0432023-06-22022 June 2023 Audit Plan License Amendment Requests to Change Emergency Plan Staff Augmentation Times ML23153A1732023-06-16016 June 2023 Correction to Amendment Nos. 346 & 286 Millstone, 294 & 277 North Anna, 311 & 311 Surry, and 225 Summer to Revise Technical Specifications to Adopt TSTF-554,Rev Reactor Coolant Leakage Requirement ML23163A2352023-06-12012 June 2023 Request to Use a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI, for the SPS Sixth Inservice Inspection (Isi) Intervals and VCSNS Fifth ISI Interval ML23151A6612023-05-31031 May 2023 ES-2.1-1, Surry 2023-301 Corporate Notification Letter (Revised) ML23167B0072023-05-31031 May 2023 Proposed Emergency Plan Revision - Relocation of the Technical Support Center (TSC) Supplemental Information - LOCA Dose Calculation Summary ML23117A0952023-05-10010 May 2023 Audit Plan License Amendment Request to Support Relocation of the Technical Support Center ML23130A3742023-05-10010 May 2023 Request to Delay NRC Intial Licensing Examination 2024-02-06
[Table view] Category:License-Monthly Operating Report
MONTHYEARML0517203962005-06-13013 June 2005 May 2005 Monthly Operating Report for Surry Power Station Units 1 & 2 ML0513705192005-05-0404 May 2005 April 2005 Monthly Operating Report for Surry Units 1 and 2 ML0510903492005-04-0808 April 2005 March 2005 Monthly Operating Report from Surry Power Station Units 1 and 2 ML0508104962005-03-15015 March 2005 February 2005 Monthly Operating Report for Surry Power Station Units 1 and 2 ML0505405492005-02-14014 February 2005 January 2005 Monthly Operating Report for Surry Power Station, Units 1 and 2 ML0501902152005-01-11011 January 2005 December 2004 Monthly Operating Report for the Surry Power Station, Units 1 and 2 ML0435501382004-12-10010 December 2004 November 2004 Monthly Operating Report for Surry Power Station Units 1 and 2 ML0432104852004-11-10010 November 2004 October 2004 Monthly Operating Report for Surry Power Station Units 1 and 2 ML0429402582004-10-0808 October 2004 September 2004 Monthly Operating Report for Surry, Units 1 & 2 ML0426104132004-09-0909 September 2004 August 2004 Monthly Operating Report for Surry Power Station Units 1 and 2 ML0423003592004-08-10010 August 2004 July 2004 Monthly Operating Report for Surry, Units 1 and 2 ML0420202602004-07-12012 July 2004 June 2004 Monthly Operating Report for Surry Power Station Units 1 and 2 ML0413905502004-05-11011 May 2004 April 2004 Monthly Operating Report for Surry Power Station, Units 1 and 2 ML0412602132004-04-13013 April 2004 March 2004 Monthly Operating Report for Surry Power Station Units 1 & 2 ML0407607202004-03-0505 March 2004 February 2004 Monthly Operating Report for Surry, Units 1 and 2 ML0409605422004-02-0909 February 2004 January 2004 Monthly Operating Report for Surry, Units 1 and 2 ML0402107292004-01-11011 January 2004 December 2003 Monthly Operating Report for Surry Power Station Units 1 & 2 ML0335300822003-12-11011 December 2003 November 2003 Monthly Operating Report for Surry, Units 1 and 2 ML0332404632003-11-10010 November 2003 October 2003 Monthly Operating Report for Surry Power Station, Units 1 and 2 ML0329406642003-10-13013 October 2003 September 2003 Monthly Operating Report for Surry Units 1 & 2 ML0326709772003-09-12012 September 2003 August 2003 Monthly Operating Report for Surry Units 1 & 2 ML0323805452003-08-11011 August 2003 July 2003 Monthly Operating Report for Surry Units 1 & 2 ML0319903262003-07-0909 July 2003 June 2003 Monthly Operating Report for Surry Power Station Units 1 & 2 ML0316813982003-06-0505 June 2003 May 2003 Monthly Operating Report for Surry Units 1 and 2 ML0314104892003-05-14014 May 2003 April 2003 Monthly Operating Report for Surry Units 1 & 2 ML0310603802003-04-0808 April 2003 March 2003 Monthly Operating Report for Surry Units 1 & 2 ML0308301622003-03-14014 March 2003 February 2003 Monthly Operating Report for Surry Power Station Units 1 & 2 ML0305507462003-02-13013 February 2003 January 2003 Monthly Operating Report for Surry Power Station Units 1 & 2 ML0302303952003-01-14014 January 2003 December 2002 Monthly Operating Report for Surry Units 1 & 2 ML0235205262002-12-0909 December 2002 November 2002 Monthly Operating Report for Surry Units 1 & 2 ML0232503822002-11-12012 November 2002 October 2002 Monthly Operating Report for Surry Power Station Units 1 & 2 ML0229100752002-10-0909 October 2002 September 2002 Monthly Operating Report for Surry Units 1 & 2 ML0226006852002-09-10010 September 2002 August 2002 Monthly Operating Report for Surry Units 1 & 2 ML0222702902002-08-0808 August 2002 July 2002 Monthly Operating Report for Surry Units 1 & 2 ML0220400052002-07-15015 July 2002 June 2002 Monthly Operating Report for Surry Power Station Units 1 & 2 ML0217104242002-06-11011 June 2002 May 2002 Monthly Operating Report for Surry Power Station, Units 1 & 2 ML0215504742002-05-0707 May 2002 April 2002 Monthly Operating Report for Surry Power Station, Units 1 & 2 ML0211304582002-04-15015 April 2002 March 2002 Monthly Operating Report for Surry Power Station, Units 1 and 2 ML0208403462002-03-11011 March 2002 February 2002 Monthly Operating Report for Surry Power Station, Units 1 & 2 ML0205801832002-02-0606 February 2002 January 2002 Monthly Operating Report for Surry Power Station, Units 1 and 2 ML0204504432002-01-11011 January 2002 December 2001 Monthly Operating Report for Surry Power Station, Units 1 & 2 ML19095A3841980-11-12012 November 1980 Monthly Operating Report for Month of October 1980 ML19095A3821978-08-16016 August 1978 Monthly Operating Report for Month of July 1978 ML19095A3831978-08-0101 August 1978 Monthly Operating Report for Month of July 1978 ML19095A3651978-07-18018 July 1978 Monthly Operating Report for Month of June 1978 ML19095A3661978-06-13013 June 1978 Refueling & Spent Fuel Storage Information & Monthly Operating Report for May 1978 ML19095A3671978-05-12012 May 1978 Monthly Operating Report for Month of April 1978 ML19095A3681978-04-12012 April 1978 Monthly Operating Report for Month of March 1978 ML19095A3691978-03-16016 March 1978 Monthly Operating Report for Month of February 1978 ML19095A3711978-01-0909 January 1978 Monthly Operating Report for Month of December 1977 2005-06-13
[Table view] |
Text
I -
RICHMOND,VIRGINIA 23261 November:. 10;
- 197T Mr. William McDonald, Director Serial No. 510 Office of Management Information and PO&M/DLB :.dgt Program Control Docket Nos. 50-280 U. S. Nuclear Regulatory Connnission 50-281 Washington, .D. C. 20555 License Nos. DPR-32 DPR-37
Dear Mr. McDonald:
Operating information for Surry Power Station, Unit Nos.~l and 2 for the month of October 1977 is attach~d.
Very truly yours,
- t!}, )21. ~ae&/1,o/
.C*. M. Stallings Vice President-Power Supply and Production Operations Attachments cc: Mr. James P. O'Reilly, Director Office of Inspection and Enforcement
/\.
UNIT Surry Unit 1 DATE Novo 1, 1977 COMPLETED BY 0
- W. Akins DOCKET NO. 50-280
~
OPERATING STATUS
- l. REPORTING PERIOD: 0001 771001
- THROUGH 2400 771031 HOURS IN REPORTING PERIOD: _ _ _ _ _ _ _,.,......~-------------------
74_5
- 2. CURRENTLY AUTHORIZED POWER LEVEL (MWth) 2441 MAX. DEPENDABLE CAPACITY (MWe-NET) 775
- 3. LOWEST POWER LEVEL TO WHICH SPECIFICALLY RESTRICTED (IF ANY) (MWe-NET):_...;;N....;;A.;.__ _ _ _ _ __
- 4. REASONS FOR RESTRICTION (IF ANY):
THlS CUMULATIVE REPORTING PERIOD YR TO DATE TO DATE S. HOURS REACTOR WAS CRITICAL. . . . * . . . . * . .
- 6. REACTOR RESER VE SHUTDOWN HOURS . . . . . *
- 7. HOURS GENERA "iOR ON LINE . . . . * . . . * * * . * *
- 8. UNIT RESERVE SHUTDOWN HOURS *.*.*..**.* 0 0 0
- 9. GROSS THERMAL ENERGY GENERATED(MWH) . . . . . . * . * . . . . * * * . * . *
- 1,816,401 14,010,103 .63, 098, 459
- 10. GROSS ELECTRICAL ENERGY
-GENERA TED (MWH) . . . . . * . . . . . . : ...*.*** 597,340 426062920 202685.283 ii. NET ELECTRICAL ENERGY GE!"!ERATED (MWH) 568,359 4;180: 728 19~G24.493
- 12. REACTOR AVAILABILITY FACTO>:. (1) . . . . . . . . . 100% 8LO% 66.8%
- 13. UNIT A VAILABlLITY FACTOR (2) * . * . * . * . . . * . 100% 79 ~ 7% ' 65' 11;;
- 14. UNIT CAPACITY FACTOR (3) ..*.*..*.******
IS. UNIT FORCED OUTAGE RATE (4) . . . . . . * * . . . .
- 16. SHUTDOWNS SCHEDULED TO BEGIN IN NEXT 6 MONTHS (STATE TYPE, DATE, AND DURATION OF EACH):
S/G Inspection, Nov. 11. 1977 - 4 Weeks
- 17. IF SHUT DOWN AT END OF REPORT-PERIOD, ESTIMATED DATE OF STARTUP: _ _ _N_A_ _ _ _ _ _ _ __
- 18. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION) REPORT THE FOLLOWING:
DATE LAST DATE FORECAST ACHIEVED INITIAL CRITICALITY
. INITlAL ELECTRICAL POWER GENERATION COMMI:.RCIAL OPERATION HOURS REACTOR WAS CRITICAL REACTOR AVAILABILITY FACTOR x 100 ! ..
HOURS IN REPORTING PERIOD HOURS GENERATOR ON LINE (2) UNIT AVAILABILITY FACTOR -----------~x100
.HOURS IN REPORTING PERIOD NET ELECTRICAL POWER GENERATED (3) UNIT CAPACITY FACTOR MAX. DEPENDABLE CAPACITY (MWe-NET) X HOURS IN REPORTING PERIOD FORCED OUTAGE HOURS (4) UNIT FORCED OUTAGE RATE ~~~~~~~--~~~~-~--~~~x100 HOURS GENERA TOR ON LINE+ FORCED OUT AGE HOURS
'~'
- '*F DOCKET NO. 50-280 UNIT Surry Unit 1 DATE Nov. 2; 1977 COMPLETED BY o. W. Akins AVERAGE DAILY UNIT POWER LEVEL MONTH_o_c_t_o_b_e_r_l_9_7_7_ _ _ __
AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY (MWe-net) DAY (MWe-net) 1 758.5 17 768.6 2 *759.7 18 767.8 3 764.5 19 767.2 4 764.2 20 765. 3 .
5 76500 21 763.4 6 76005 22 766.6 7 760.1 23 767.4 8 758.3 24 767.0 9 759.2 25 764.4 10 758.2 26 762.5 11 759.9 27 751.4 12 756.0 28 765.7 13 760.3 29 763.3 14 763.1 30 763.2 15 766.5 31 764.4 16 767.8 DAILY UNIT POWER LEVEL FORM INSTRUCTIONS On this form, list the average daily unit power level in MWe-net for each day in the reporting month.
Compute to the nearest whole megawatt.
These figures will be used to plot a graph for each reporting month. Note that by using maximum dependable capacity for the* net electrical rating of the unit, there may be occasions when the daily average power level exceeds the I 00% line (or the restricted rower level line). In such cases, the average daily unit power output sheet should be footnoted to explain the apparent anomaly.
/
DOCKETNO. ~5=0~-2=8=0~-'-~
UNIT SHIUTDOWNS UNIT NAME Surry Unit 1 DATE Nov. 2, 1977 COMPLETED BY Oo W. Akins REPORT MONTH OCTOBER, 1977 TYPE lv'JETHODOF F-FORCED DURATION ~I -iUTTING DOWN NO. DATE S-SCHEDULED (HOURS) REASON (1) Tl ~E REACTOR (2) . CORRECTIVE ACTIONS/COMMENTS THERE WERE NO sHUTDOWNS DURING OCTOBER, 1977 (1) REASON (2) METHOD A--EQUIPMENT FAILURE (EXPLAIN) I-MANUAL B- MA INT. OR TEST 2-MANUAL C-- REFUELING SCRAM D-REGllLATORY RESTRICTION 3-AUTOMATIC
- E-OPERATOR TRAINING AND SCRAM LICENSE EXAMINATION I
F-ADMINISTRATIVE -
G-OPERATIONALERROR
- - (EXPLAIN)
- H-OTHER (EXPLAIN)
SUMMARY
'*' <**""* \' :. ._ ** r
UNIT Surry Unit 2 DATE Nov. 1, 1977 COMPLETED BY O* W* Akins DOCKET No._5 _ 0 -_ 28 _ 1_ _ _ _____
OPERA TING ST A TUS
- l. REPORTING PER!OD: _ _o_o_o_1_ _ 1_11_0_0_1_ _ _ _ _ _ THROUGH _ _2_4.;...0:.....0;;.___7_7_1_0_3_1_ _ _ __
HOURS IN REPORTING PERIOD: 745
- 2. CURRENTLY AUTHORIZED POW_E_R_L_E_V_E_L_(_M_W-th_)__,2,,_4.,...4'""'1...--~-IA-X-.D_E_P_E_N_D_A_B_L_E_C_A_P_A_C-IT-Y-(M_\_!/e--N-E_T_)__7_7_5_
- 3. LOWEST POWER LEVEL TO WHICH SPECIFICALLY RESTRICTED (IF ANY) (MWe-NET): __N_A_ _ _ _ _ _ __
- 4. REASONS FOR RESTRICTION (IF ANY):
THIS CUMULATIVE REPORTING PERIOD YR TO DATE TO DATE
- 5. HOURS REACTOR WAS CRITICAL . . . . . . . . . .
- _. 550.4 4' 851. 6 25,170.5
- 6. REACTOR RESERVE SHUTDOWN HOURS *.**.** 0 0 0
- 7. HOURS GENERATOR ON LINE . * . . . . . . . : .*..* 4274902 242694.6
- 8. UNIT RESER VE SHUTDOWN HOURS . . . . . * . . . . : 0 0 0
- 9. GROSS THERMAL ENERGY GENERATED(MWH) * . . . * . . . . . . . . * . * * * .
- 1,136,944 11,397,881 56,742,508
- 10. GROSS ELECTRICAL ENERGY
-GENER ATED (MWH) . . . . ...*....***.*.*** .3682180 327232885 1825952259
, . ii. NET ELECTRICAL E!'!ERGY GENFRATEJ)
(MWH) ...*.*....*......*.*.*..*..*.
348,833 3,534 '725 17,630,427
- 12. REACTOR AVAILABILITY FACTOR (I) . . . * * . * .
UNIT AVAILABILITY FACTOR (2) . . . . * . * * * * . . 64o3% 65!1% 62o5%
13.
60.4% 62o5% 5706%
- 14. UNIT CAPACITY FACTOR (3) .......****.***
- 15. UNIT FORCED OUTAGE RATE (4) . . . . . . * . . * . . 0 27.2% 26 0 0%
I6. SHUTDOWNS SCHE;DULED TO ~EGtN IN NEXT 6 MONTHS (STATE TYPE, DATE, AND DURATION OF EACH):
S/G Inspection, April 10, 197 8 - J weeks . .
I 7. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: __N_/:_A _ _ _ _ _ _ _ _ __
- 18. . UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION) REPORT THE FOLLOWING:
DA TE LAST DATE FORECAST ACHIEVED INITIAL CRITICALITY <
. INITIAL ELECTRICAL POWER GENERATION COMMERCIAL OPERATION HOURS REACTOR WAS CRITICAL
. (1) REACTOR AVAILABILITY FACTOR x 100 HOURS IN REPORTING PERIOD HOURS GENERATOR ON LINE (2) UNIT AV AILABIL!TY FACTOR = -----------~XIOO HOURS IN REPORTING PERIOD NET ELECTRICAL POWER GENERATED (3) UNIT CAPACITY FACTOR MAX. DEPENDABLE,CAP~CITY (MWe-NET) X HOURS IN REPORTING PERIOIJ FORCED OUTAGE HOURS (4) UNIT FORCED OUTAGE RATE ------~~~~~~-~~~~~~~x100 HOURS GENERATOR ON LINE+ FORCED OUTAGE HOURS '.*'
~
DOCKETN0._50_-_2_8_1~~
l UNIT Surry Unit 2 DATE Nov. 2, 1977 COMPLETED BY 00 W* Akins AVERAGE DAILY UNIT POWER LEVEL MONTH October 1977 AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY (MWe-net) DAY (MWe-net) 0 752.8 1 17 2 0 18 755.3 3 0 19 756 5 4 0 20 756.1
0 754.2 ,
5 21 ':*
6 0 22 757.5 7 0 23 758.7
- a 757.8 8 24 9 0 25 758~2
.. ~*
10 0 26 759. 2 .
11 0 '27 760".1 12 365.0 ' 28 753.2 13 632.8 29 752.5 14 694.1 .30' 750.0
- 75203 15 72706 31
- ~*
16 749.8
- .. DAILY UNIT POWER LEVEL FORM INSTRUCTIONS On this form, list the average daily unit power level in MWe-net for each day in the reporting month.
Compute to the nearest whole megawatt.
These figures will be used to plot a graph for each reporting month. Note that by using maximum dependable capacity for the* net electrical rating of the unit, there may be occasions when the daily average power level exceeds the l 00% line (or the restricted power level line). In such cases, the average daily unit power output sheet should be footnoted to explain the apparent anomaly .
/
DOCKET NO. _5-'-0-_2_8_1_ __,,__,_
UNIT SHUTDOWNS UNlT NAME Surry Unit 2 DATE Nov. 2, 1977
- COMPLETED BY o. W. Akins REPORT MONTH OCTOBER
TYPE METHOD OF F*FORCED DURATION ~H UTTING DOWN NO. DATE S-SCHEDULED (HOURS) REASON (1) TH E REACTOR (2) CORRECTIVE ACTIONS/COMMENTS II-1 10-1-:77 s 265.8 c 1 S/G Inspection and Refueling Scheduled to Outage.
10-12-7:?
(1) REASON (2) METHOD A--EQUIPMENT FAILURE (EXPLAIN) I-MANUAL B- MAINT. OR TEST 2-MANUAL C--REFUELING SCRAM D-REGULATORY RESTRICTION 3-AUTOMATIC E-OPERATOR TRAINING AND SCRAM LICENSE EXAMINATION F-ADMINISTRATIVE
- G--OPERA TIONAL ERROR
H-OTHER (EXPLAIN)
SUMMARY