| Site: | Surry |
| Issue date: | 11/10/1977 |
| From: | Stallings C Virginia Electric & Power Co (VEPCO) |
| To: | Mcdonald W Office of Nuclear Reactor Regulation |
| References | |
| Serial No. 510 | |
| Download: ML19095A373 (8) | |
Text
I RICHMOND,VIRGINIA 23261 November:. 10;
- 197T Mr. William McDonald, Director Office of Management Information and Program Control U. S. Nuclear Regulatory Connnission Washington,.D. C.
20555
Dear Mr. McDonald:
Serial No. 510 PO&M/DLB :.dgt Docket Nos. 50-280 50-281 License Nos. DPR-32 DPR-37 Operating information for Surry Power Station, Unit Nos.~l and 2 for the month of October 1977 is attach~d.
Very truly yours,
- t!}, )21. ~ae&/1,o/
. C *. M. Stallings Vice President-Power Supply and Production Operations Attachments cc:
Mr. James P. O'Reilly, Director Office of Inspection and Enforcement
- ,' /\\.
OPERATING STATUS UNIT Surry Unit 1 DATE Novo 1, 1977 COMPLETED BY 0
- W. Akins DOCKET NO. 50-280
~
- l.
REPORTING PERIOD:
0001 771001 THROUGH 2400 771031 HOURS IN REPORTING PERIOD: ____
74_5 ___,.,......~-------------------
- 2.
CURRENTLY AUTHORIZED POWER LEVEL (MWth) 2441 MAX. DEPENDABLE CAPACITY (MWe-NET) 775
- 3.
LOWEST POWER LEVEL TO WHICH SPECIFICALLY RESTRICTED (IF ANY) (MWe-NET):_...;;N....;;A.;._ ______ _
- 4.
REASONS FOR RESTRICTION (IF ANY):
THlS REPORTING PERIOD S.
HOURS REACTOR WAS CRITICAL....*....*..*
- 6.
REACTOR RESER VE SHUTDOWN HOURS.....**
- 7.
HOURS GENERA "iOR ON LINE....*...***.***
- 8.
UNIT RESERVE SHUTDOWN HOURS *.*.*..**.*
- 9.
GROSS THERMAL ENERGY GENERATED(MWH)......*.*....***.*.**
- 10.
GROSS ELECTRICAL ENERGY ii.
-GENERA TED (MWH).....*...... :...*.***
NET ELECTRICAL ENERGY GE!"!ERATED (MWH)
REACTOR AVAILABILITY FACTO>:. (1).........
UNIT A VAILABlLITY FACTOR (2) *.*.*.*...*.
UNIT CAPACITY FACTOR (3)..*.*..*.******
- UNIT FORCED OUTAGE RATE (4)......**....
745 0
745 0
1,816,401 597,340 568,359 100%
100%
98.4%.
- o.:*.***
CUMULATIVE YR TO DATE TO DATE 5,912ol 28~466 0 5 0
0 5,817.8 27,71708 0
0 14,010,103
.63, 098, 459 426062920 202685.283 4;180: 728 19~G24.493 8LO%
66.8%
79 ~ 7% '
65' 11;;
77 o5%
59.4%
2~1%
18,6%
- 12.
- 13.
- 14.
IS.
- 16.
SHUTDOWNS SCHEDULED TO BEGIN IN NEXT 6 MONTHS (STATE TYPE, DATE, AND DURATION OF EACH):
- 17.
- 18.
S/G Inspection, Nov. 11. 1977 -
4 Weeks IF SHUT DOWN AT END OF REPORT-PERIOD, ESTIMATED DATE OF STARTUP: ___
N_A ________
UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION) REPORT THE FOLLOWING:
REACTOR AVAILABILITY FACTOR INITIAL CRITICALITY
. INITlAL ELECTRICAL POWER GENERATION COMMI:.RCIAL OPERATION HOURS REACTOR WAS CRITICAL HOURS IN REPORTING PERIOD x 100 DATE LAST DATE FORECAST ACHIEVED (2)
UNIT AVAILABILITY FACTOR HOURS GENERA TOR ON LINE
~x100
.HOURS IN REPORTING PERIOD NET ELECTRICAL POWER GENERATED (3)
UNIT CAPACITY FACTOR MAX. DEPENDABLE CAPACITY (MWe-NET) X HOURS IN REPORTING PERIOD (4)
UNIT FORCED OUTAGE RATE FORCED OUTAGE HOURS
~~~~~~~--~~~~-~--~~~x100 HOURS GENERA TOR ON LINE+ FORCED OUT AGE HOURS
'~
- '*F DOCKET NO.
50-280 UNIT Surry Unit 1 DATE Nov. 2; 1977 COMPLETED BY o. W. Akins AVERAGE DAILY UNIT POWER LEVEL MONTH_o_c_t_o_b_e_r_l_9_7_7 ____ _
AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY (MWe-net)
DAY (MWe-net) 1 758.5 17 768.6 2
- 759.7 18 767.8 3
764.5 19 767.2 4
764.2 20 765. 3.
5 76500 21 763.4 6
76005 22 766.6 7
760.1 23 767.4 8
758.3 24 767.0 9
759.2 25 764.4 10 758.2 26 762.5 11 759.9 27 751.4 12 756.0 28 765.7 13 760.3 29 763.3 14 763.1 30 763.2 15 766.5 31 764.4 16 767.8 DAILY UNIT POWER LEVEL FORM INSTRUCTIONS On this form, list the average daily unit power level in MWe-net for each day in the reporting month.
Compute to the nearest whole megawatt.
These figures will be used to plot a graph for each reporting month. Note that by using maximum dependable capacity for the* net electrical rating of the unit, there may be occasions when the daily average power level exceeds the I 00% line (or the restricted rower level line). In such cases, the average daily unit power output sheet should be footnoted to explain the apparent anomaly.
/
TYPE F-FORCED DURATION NO.
DATE S-SCHEDULED (HOURS)
.. -1
SUMMARY
UNIT SHIUTDOWNS DOCKETNO. ~5=0~-2=8=0~-'-~
UNIT NAME Surry Unit 1 DATE Nov. 2, 1977 COMPLETED BY Oo W. Akins REPORT MONTH OCTOBER, 1977
~I REASON (1)
Tl THERE WERE NO s I
\\' :.
lv'JETHODOF
-iUTTING DOWN
~E REACTOR (2)
. CORRECTIVE ACTIONS/COMMENTS HUTDOWNS DURING OCTOBER, 1977
._ ** r (1) REASON A--EQUIPMENT FAILURE (EXPLAIN)
B-MA INT. OR TEST C-- REFUELING D-REGllLATORY RESTRICTION
-E-OPERATOR TRAINING AND LICENSE EXAMINATION F-ADMINISTRATIVE -
G-OPERATIONALERROR (EXPLAIN)
- H-OTHER (EXPLAIN)
(2) METHOD I-MANUAL 2-MANUAL SCRAM 3-AUTOMATIC SCRAM
UNIT Surry Unit 2 DATE Nov. 1, 1977 COMPLETED BY O
- W
- Akins DOCKET No._5_ 0-_28_ 1 ____
OPERA TING ST A TUS
- l.
REPORTING PER!OD: __
o_o_o_1 __
1_11_0_0_1 ______ THROUGH __
2_4.;...0:.....0;;.___7_7_1_0_3_1 ____
HOURS IN REPORTING PERIOD:
7 45
- 2.
CURRENTLY AUTHORIZED POW_E_R_L_E_V_E_L_(_M_W-th_)__,2,,_4.,...4'""'1...--~-IA-X-. D_E_P_E_N_D_A_B_L_E_C_A_P_A_C-IT-Y-(M_\\_!/e--N-E_T_) __
7_7_5_
- 3.
LOWEST POWER LEVEL TO WHICH SPECIFICALLY RESTRICTED (IF ANY) (MWe-NET): __
N_A _______ _
- 4.
REASONS FOR RESTRICTION (IF ANY):
- 5.
- 6.
- 7.
- 8.
- 9.
- 10.
. ii.
- 12.
- 13.
- 14.
- 15.
I6.
I 7.
- 18.
THIS REPORTING PERIOD HOURS REACTOR WAS CRITICAL..........* _.
REACTOR RESERVE SHUTDOWN HOURS *.**.**
HOURS GENERATOR ON LINE.*....... :.*..*
UNIT RESER VE SHUTDOWN HOURS.....*.... :
GROSS THERMAL ENERGY GENERATED(MWH) *...*........*.***.*
GROSS ELECTRICAL ENERGY
-GENER A TED (MWH).......*....***.*.***
NET ELECTRICAL E!'!ERGY GENFRATEJ)
(MWH)...*.*....*......*.*.*..*..*.
REACTOR AVAILABILITY FACTOR (I)...**.*.*
UNIT AVAILABILITY FACTOR (2)....*.****..
UNIT CAPACITY FACTOR (3).......****.***
UNIT FORCED OUTAGE RATE (4)......*..*..
550.4 0
0 1,136,944
.3682180 348,833 73.9%
64o3%
60.4%
0 CUMULATIVE YR TO DATE TO DATE 4' 851. 6 25,170.5 0
0 4274902 242694.6 0
0 11,397,881 56,742,508 327232885 1825952259 3,534 '725 17,630,427 66.5%
- 63. 8%
65!1%
62o5%
62o5%
5706%
27.2%
26 00%
SHUTDOWNS SCHE;DULED TO ~EGtN IN NEXT8 6 MONTHS (STATE TYPE, DATE, AND DURATION OF EACH):
S/G Inspection, April 10, 197 J weeks IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: __ N_/:_A _________ _
. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION) REPORT THE FOLLOWING:
DA TE LAST DATE FORECAST ACHIEVED INITIAL CRITICALITY
. (1)
REACTOR AVAILABILITY FACTOR (2)
UNIT AV AILABIL!TY FACTOR (3)
UNIT CAPACITY FACTOR (4)
UNIT FORCED OUTAGE RATE
. INITIAL ELECTRICAL POWER GENERATION COMMERCIAL OPERATION HOURS REACTOR WAS CRITICAL HOURS IN REPORTING PERIOD x 100 HOURS GENERATOR ON LINE
= -----------~XIOO HOURS IN REPORTING PERIOD NET ELECTRICAL POWER GENERATED MAX. DEPENDABLE,CAP~CITY (MWe-NET) X HOURS IN REPORTING PERIOIJ FORCED OUTAGE HOURS
~~~~~~-~~~~~~~x100 HOURS GENERATOR ON LINE+ FORCED OUTAGE HOURS
~..
l DOCKETN0._50_-_2_8_1~~
UNIT Surry Unit 2 DATE Nov. 2, 1977 COMPLETED BY 00 W
- Akins AVERAGE DAILY UNIT POWER LEVEL MONTH October 1977 AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY (MWe-net)
DAY (MWe-net) 1 0
17 752.8 2
0 18 755.3 3
0 19 756 5 4
0 20 756.1 5
0 21 754.2 6
0 22 757.5 7
0 23 758.7 8
- a 24 757.8 9
0 25 758~2 10 0
26 759. 2.
11 0
'27 760".1 12 365.0
' 28 753.2 13 632.8 29 752.5 14 694.1
.30' 750.0 72706 75203 15 31 16 749.8
- .. DAILY UNIT POWER LEVEL FORM INSTRUCTIONS On this form, list the average daily unit power level in MWe-net for each day in the reporting month.
Compute to the nearest whole megawatt.
These figures will be used to plot a graph for each reporting month. Note that by using maximum dependable capacity for the* net electrical rating of the unit, there may be occasions when the daily average power level exceeds the l 00% line (or the restricted power level line). In such cases, the average daily unit power output sheet should be footnoted to explain the apparent anomaly.
- .-. ~~.
.. ~*
- ~*
/
NO.
DATE II-1 10-1-:77 to 10-12-7:?
SUMMARY
UNIT SHUTDOWNS DOCKET NO. _5-'-0-_2_8_1 __ _,,__,_
UNlT NAME Surry Unit 2 DATE Nov. 2, 1977 COMPLETED BY o. W. Akins TYPE F*FORCED DURATION S-SCHEDULED (HOURS) s 265.8 REPORT MONTH OCTOBER
~H REASON (1)
TH c
- ~~~~~~~~
METHOD OF UTTING DOWN E REACTOR (2) 1 CORRECTIVE ACTIONS/COMMENTS S/G Inspection and Refueling Scheduled Outage.
(1) REASON A--EQUIPMENT FAILURE (EXPLAIN)
B-MAINT. OR TEST C--REFUELING D-REGULATORY RESTRICTION E-OPERATOR TRAINING AND LICENSE EXAMINATION F-ADMINISTRATIVE G--OPERA TIONAL ERROR (EXPLAIN)
H-OTHER (EXPLAIN)
(2) METHOD I-MANUAL 2-MANUAL SCRAM 3-AUTOMATIC SCRAM
RECF::IVEO DOCUMEIH r
1
~... -