Reviewed 04/22/1976 Letter Advising of Revisions to 10 CFR 50.55a, Requiring Periodic Update of Inservice Inspection Procedures. Provides Dates of Next Regular 40 Month Inspection Period Occurring After 09/01/1976
ML19094A802
Person / Time
Site: Surry  Dominion icon.png
Issue date: 05/27/1976
From: Stallings C
Virginia Electric & Power Co (VEPCO)
To: Reid R, Rusche B
Office of Nuclear Reactor Regulation
References
Download: ML19094A802 (1)


Text

e i?egulato!)' lcket f)ffl May 27,. 1976 Mr. Benard C. Rusche, Director Office of Nuclear Reactor Regulation Attn:

Mr. Robert W. Reid, Chief Operating Reactors Branch #4 Division of Operating Reactors U. S. Nuclear Regulatory Commission Washington, D.C.

20555

Dear Mr. Rusche:

Serial No. 008/042276 LQA/ESG:cel Docket Nos. 50-280 C)-2Bl)

License Nos. DPR-32 DPR-37 We have reviewed Mr. Reid's letter of April 22, 1976, advising us of the revisions to 10 CFR 50.55a, requiring periodic update of inservice inspection procedures.

As requested in his letter, we have determined the dates of the start of the next regular 40 month inspection period occurring after September 1, 1976.

  • These are:

Surry Unit 1 Surry Unit 2.

August 22, 1979:

January 1,. 1980 We are currently in the process of determining the practicability of conformance to certain ASME Section XI inservice inspection and testing requirements, as well as the impact of the changes to the regulations on the Technical Specifications.

We anticipate we will be prepared to submit any required requests for relief or license amendment by September!, 1976.

cc:

Mr. N. C. Moseley, Director Office of Inspection & Enforcement Region II Very truly yours, C. M. Stallings Vice President-Power Supply and Production Operations