Hydraulic Snubber Functional Test. Completed Test Required by Tech. Spec. 4.17 on Surry Unit No. Ii. Results of Refueling Test Revealed a Significant Number of Snubbers That Failed to Pass the Periodic Test
ML19093A986
Person / Time
Site: Surry  Dominion icon.png
Issue date: 10/12/1977
From: Stallings C
Virginia Electric & Power Co (VEPCO)
To: O'Reilly J
NRC/RGN-II
References
Download: ML19093A986 (1)


Text

VIROil\\e ELECTRIC AND POWER CoMPa RICHMOND,VIBGINIA 23261 October 12; *. l 977 Mr. James P. O'Reilly, Director Region II, Office of Inspection and Enforcement 230 Peachtree Street, N. W. - Suite 1217 Atlanta, Georgia 30303 Gentlemen:

Re:

Surry #1 Hydraulic Snubber Functional Test Serial No. 450 PO&M/ES:wh~

Docket No.~

License No. DPR-32 We have just completed the hydraulic snubber functional test required by Tech. Spec. 4.17 on Surry Unit No. II.

The results of this refueling test revealed a significant number of snubbers that failed to pass the acceptance criteria of the periodic test. All unacceptable hydraulic snubbers were subsequently re-adjusted, repaired or replaced.

\\

Based on the test results experienced on Unit No. II, we have embarked on a similar program to insure operability of all snubbers required to be functionally tested, by Tech. Specs., on Surry Unit No. 1.

The program is in progress and will be completed before the return of Surry Unit No. 1 following the next scheduled outage.

<J Very truly yours,

~~-

c. M, Stallings

--;/---

Vice President-Power Supply and Production Operations