ML19093A444
| ML19093A444 | |
| Person / Time | |
|---|---|
| Site: | Surry |
| Issue date: | 06/23/1977 |
| From: | Stallings C Virginia Electric & Power Co (VEPCO) |
| To: | Moseley N NRC/IE, NRC/RGN-II |
| References | |
| IR 1977008 | |
| Download: ML19093A444 (1) | |
Text
e VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIB.GINJ:A 2 3 2 61 June.23',.1977-
- Mr. Norman C. Moseley, Director Office of Inspection and Enforcement U.S. Nuclear.Regulatory Commission
~egion II - Suite 818 230 Peachtree Street, Northwest Atlanta, Georgia 30303
Dear Mr. Moseley:
Serial No. 233/060677 PO&M/TAP :das Docket N~:f)
License Nos. DPR-32 DPR-37 This is in response to your letter of June 6, 1977, in reference to the inspection conducted at Surry Power Station on May 10-13, 1977 and reported in inspection reports IE 50-280/77-8 and 50-281/77-8.
We have reviewed the subject inspection reports and have determined that no proprietary information is contained therein.
Accordingly, the Virginia Electric and Power Company interposes no objection to those in-sp.ection reports being made a matter of public disclosure.
cc: Mr. Robert W. Reid Very truly yours,
~-.* ) ) l \\;;;cl/,
- i.J I C. M. Stallings Vice President-Power Supply and Production Operations