ML19093A436
Jump to navigation
Jump to search
| ML19093A436 | |
| Person / Time | |
|---|---|
| Site: | Surry |
| Issue date: | 07/15/1977 |
| From: | Stallings C Virginia Electric & Power Co (VEPCO) |
| To: | Moseley N NRC/IE, NRC/RGN-II |
| References | |
| IR 1977012 | |
| Download: ML19093A436 (1) | |
Text
- -*-* -----*
e e
VIRGINIA ELECTRIC A.ND POWER COMPANY RICHMOND, VIRGINIA 23261 July 15,
- 1977-Mr. Norman C. Moseley, Director Office of Inspection and Enforcement U. S. Nuclear Regulatory Conunission Region II - Suite.818 230 Peachtree Street, Northwest Atlanta, Ge~rgia 30303
Dear Mr. Moseley:
Serial No. 290/070777 PO&M/TAP:das Docket Nosy-"5~-280
~
License Nos. DPR-32 DPR-37 This is in response to your letter of July 7, 1977, in reference to the inspection conducted at Surry Power Station on May 31-June 3, 1977, and report-ed in inspection reports IE-50-280/77-12 and 50-281/77-12.
We have reviewed your letter and the enclosed inspection reports and have determined that no proprietary information is contained in the reports.
Accord-ingly, the Virginia Electric and Power Company interposes no objection to these inspection reports being made a matter of public disclosure.
cc: Mr. Robert W. Reid Very truly yours,
-~ ),)1.A7,._.. / '
q,.
- i/ I. '0 /..r{,lti -t.: ~y*J C. M. Stallings Vice President-Power Supply and Production Operations