ML19092A272
| ML19092A272 | |
| Person / Time | |
|---|---|
| Site: | North Anna (SNM-2507) |
| Issue date: | 03/26/2019 |
| From: | Lane N Virginia Electric & Power Co (VEPCO) |
| To: | Document Control Desk, Office of Nuclear Material Safety and Safeguards |
| References | |
| Download: ML19092A272 (1) | |
Text
VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 March 26, 2019 Attention: Document Control Desk Director, Division of Sp~nt Fuel Management Office of Nuclear Material Safety and Safeguards United States NuclearRegulatory Commission Washington, D. C. 20~55-0001 Gentlemen:
Serial No.19-108 NAPS/RAP Docket Nos. 72-16 72-56 License No. SNM-2507 VIRGINIA ELECTRIC AND POWER COMPANY (DOMINION ENERGY)
NORTH ANNA POWER STATION INDEPENDENT SPENT FUEL STORAGE INSTALLATION CISFSI)
SUMMARY
OF FACILITY CHANGES, TESTS AND EXPERIMENTS Pursuant to 10 CFR 72.48(d)(2), a report containing a brief description of any changes, tests, and experiments,.including a summary of the evaluation of each, must be submitted to the NRC, at intervals not to exceed 24 months. This letter is to notify you that there were no evaluations affecting the North Anna Power Station ISFSI during 2018.
If you have any questions, please contact Donald R. Taylor at (540) 894-2100.
Very truly yours, La*.
N.L;;'ryLa~
Site Vice President Commitments made in ]he letter: None cc:
U.S. Nuclear R~gulatory Commission Attention: Document Control Desk
.Washington, DC 20555-0001 United States Nuclear Regulatory Commission Region II Marquis One Tower 245 Peachtree Center Ave., NE, Suite 1200 Atl~nta, Georgi~.30303-::1257 NRG Senior Resident Inspector North Anna Power Station