ML19085A055

From kanterella
Jump to navigation Jump to search
Interim Storage Partners - Partial Response to RAI Part 1, Physical Security, Including Revision 3 of the Physical Security Plan, Guard Training and Qualification Plan, Docket 72-1050
ML19085A055
Person / Time
Site: Consolidated Interim Storage Facility
Issue date: 03/22/2019
From: Sanchez E
Consolidated Interim Storage Facility
To:
Document Control Desk, Office of Nuclear Material Safety and Safeguards
References
E-53893
Download: ML19085A055 (2)


Text

INTERIM STORAGE PARTNERS March 22, 2019 E-53893 Director, Division of Spent Fuel Management

-Office of Nuclear Material Safety and Safeguards U. S. Nuclear Regulatory Commission Attn: Document Control Desk One White Flint North 11555 Rockville Pike Rockville, MD 20852

Subject:

Partial Response to RAI Part 1, Physical Security, Including Revision 3 of the Physical Security Plan, Guard Training and Qualification Plan, Docket 72-1050

Reference:

1.

Letter from John-Chau Nguyen (NRC) to Elicia Sanchez (ISP),

Interim Storage Partners' License Application to Construct and Operate the Waste Control Specialists Consolidated Interim Storage Facility, Andrews County, Texas, Docket No. 72-1050- First Request for Additional Information Part 1, Physical Security, dated November 6, 2018 (E-51587) *

2.

Letter from Elicia B. Sanchez (ISP) to Document Control Desk (NRC), Partial Response to RAI Part 1, Physical Security, including Revision 3 of the Physical Security Plan, Guard Training and Qualification Plan, Docket 72~1050, dated January 7, 2019 Interim Storage Partners (ISP) provided a partial response to the Request for Additional Information (RAI) Part 1, Physical Security documented in the attachments to the NRC letter dated November 6, 2018 (Reference 1) on January 7, 2019 (Reference 2).

The reference 2 submittal provided responses to seventeen (17) of the twenty-eight (28)

RAls attached to Reference 1. Enclosure 1 of this letter is the draft responses to the remaining eleven (11) RAls along with topics of discussion/clarification associated with

  • some of the RAls.

Safeguards Information When separated from Safeguards Information enclosure(s), this document is decontrolled provided the transmittal document does not otherwise warrant protection from the unauthorized disclosure.

P.O. Box 1129

  • interimstoragepartners.com SoD I

Safeguards Information Document Control Desk E-53893 Page 2 of 2

  • The revisions to the various documents (PSP, TQP, etc.) discussed in the Draft RAf
  • responses have not been completed yet and therefore we are not providing updates to the PSP, TQP and SCP with this letter.

. is marked as Safeguards Information and must be withheld from unauthorized disclosure pursuant to 10 CFR 73.22.

ISP requests that a copy of all correspondence regarding this matter be directly mailed to Mr. Jack Boshoven, Chief Engineer CISF Licensing and Engineering, at 7135 Minstrel Way, Suite 300, Columbia, MD 21045.

Should you have any questions regarding this submittal, please contact Mr. Jack Boshoven by telephone at (410) 910-6955, or by email at jack.boshoven@orano.group.

Sincerely,

~-Ju-:6 Elicia 8. Sanchez, Chief Financial Officer Interim Storage Partners LLC cc:

John (Chau) Nguyen (NRC SFM) - Letter Only Jeff Isakson, ISP/TN Americas - Letter Only Jack Boshoven, ISP/TN Americas - Letter Only

Enclosures:

1. Draft RAI Responses (SGI) and Topics for Discussion.

Safeguards Information When separated from Safeguards Information enclosure(s), this document is decontrolled provided the transmittal document does not otherwise warrant protection from the unauthorized disclosure.

- -*"'------------------------------------~