Text
A
- ---. Entergx NL-19-019 March 05, 2019 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk 11555 Rockville Pike, OWFN-2 F1 Rockville, MD 20852-2738
Subject:
Submittal of Emergency Plan Document Change Indian Point Unit Numbers 1, 2 and 3 Docket Nos.50-003, 50-247 and"50-286 License Nos. DPR-5, DPR-26 and DPR-64
Dear Sir/ Madam:
Indian Point Energy Center 450 Broadway, GSB P.O. Box249 Buchanan, N.Y. 10511-0249 Tel (914) 254-6700 Anthony J. Vitale Site Vice President The purpose of this letter is to distribute, in accordance with 1 O CFR 50.4(b )(5)(iii), a copy of the Emergency Plan document change "Indian Point Energy Center On-Shift Staffing Analysis" Revision 19-01 as required by 10 CFR 50.54(q)(5) and 10 CFR 50, Appendix E, Section V.
The On-shift Staffing Analysis revision does not result in a change to Table 8-1 of the Indian Point Energy Center (IPEC) Emergency Plan. Two notes are added to the table for information only. These notes do not result in a reduction or increase to the required minimum on-shift staffing, nor lessen any requirements to support emergency response functions or tasks. The revised on-shift staffing analysis does not affect compliance with 10 CFR 50.47. The revision has been evaluated in accordance with 10 CFR 50.54(q) and does not decrease the effectiveness of the Emergency Plan.
The evaluation and the "Indian Point Energy Center On-Shift Staffing Analysis" Revision 19-01 are provided in the enclosure. This letter and the enclosed evaluation constitute the summary of analysis required to be submitted by 10 CFR 50.54(q)(5).
Docket Nos.50-003, 50-247 and 50-286 NL-19-019 Page 2 of 2 Entergy is making no commitments in this letter. Should you have any questions regarding this matter, please contact Mr. Robert Walpole, Manager, Regulatory Assurance, Indian Point Energy Center at (914) 254-6710.
Sincerely, AJV/trj
Enclosures:
"Indian Point Energy Center On-Shift Staffing Analysis" Revision 19 and Evaluation.
cc: Mr. David Lew, Regional Administrator, NRC Region I Mr. Richard V. Guzman, Senior Project Manager, NRC NRR DORL Ms. Kimberly Conway, IPEC NRC Unit 1 Project Manager NRC Resident Inspectors Office, Indian Point Energy Center Ms. Alicia Barton, President and CEO, NYSERDA Ms. Bridget Frymire, New York State Public Service Commission