March 5, 2019
Adam C. Heflin, President and
Chief Executive Officer
Wolf Creek Nuclear Operating Corporation
P.O. Box 411
Burlington, KS 66839
SUBJECT:
WOLF CREEK GENERATING STATION - NOTIFICATION OF
CYBER SECURITY INSPECTION (NRC INSPECTION
REPORT 05000482/2019410) AND REQUEST FOR INFORMATION
Dear Mr. Heflin:
On July 15, 2019, the U.S. Nuclear Regulatory Commission (NRC) will begin an inspection in
accordance with Inspection Procedure (IP) 71130.10P, Cyber Security, Revision 0, at the
Wolf Creek Generating Station (WC). This inspection evaluates and verifies your ability to
meet the full implementation requirements of the NRCs Cyber Security Rule, Title 10, Code of
Federal Regulations (CFR), Part 73, Section 54, Protection of Digital Computer and
Communication Systems and Networks. The onsite portion of the inspection will take place
during the weeks of July 15 and July 29, 2019.
Experience has shown that these inspections are extremely resource intensive, both for the
NRC inspectors and the licensee staff. In order to minimize the inspection impact on the site
and to ensure a productive inspection for both parties, we have enclosed a request for
documents needed for the inspection. The document request has been divided into
four groups.
The first group specifies information necessary to assist the team in choosing the focus areas
(i.e., sample set) to be inspected in accordance with the cyber security inspection procedure.
This information should be made available using either a secure document management
service or passive media (i.e. CD, DVD) and delivered to the regional office no later than
April 15, 2019. The inspection team will review this information and by the end of the planned
information gathering visit on May 23, 2019, will request the specific items that should be
provided for review. The second group of requested documents will assist the team in their
evaluation of the critical systems and critical digital assets, defensive architecture, and the
areas of the cyber security plan selected for inspection. This information will be requested for
our review in the regional office prior to the inspection by June 17, 2019.
The third group of requested documents consists of those items that the team will review or
need access to, during the inspection. Please have this information available by the first day
of the onsite inspection, July 15, 2019.
A. Heflin
2
The fourth group of information is necessary to aid the team in tracking issues identified as a
result of the inspection. It is requested that this information be provided to the lead inspector
as the information is generated during the inspection. It is important that all of these
documents are up to date and complete in order to minimize the number of additional
documents requested during the preparation and/or the onsite portions of the inspection.
The lead inspector for this inspection is Greg Pick. We understand that our regulatory contact
for this inspection is Jason Knust. If there are any questions about the inspection or the
material requested, please contact the lead inspector at 817-200-1270 or by e-mail
at greg.pick@nrc.gov.
This letter does not contain new or amended information collection requirements subject to the
Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection
requirements were approved by the Office of Management and Budget under control
number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to
respond to, a request for information or an information collection requirement unless the
requesting document displays a currently valid Office of Management and Budget control
number.
This letter and its enclosure will be made available for public inspection and copying at
http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in
accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely,
/RA Heather Gepford Acting For/
Francis C. Ramirez, Chief
Engineering Branch 1
Division of Reactor Safety
Docket: 50-482
License: NPF-42
Enclosure:
Wolf Creek Generating Station -
Cyber Security Inspection Document Request
cc w/ encl: Electronic Distribution
Enclosure
Wolf Creek Generating Station - Cyber Security Inspection Document Request
Inspection Report: 05000482/2019410
Inspection Dates:
Weeks of July 15, 2019, and July 29, 2019
Inspection Procedure:
IP 71130.10P, Cyber Security, Revision 0
Reference 1:
ML17156A215 - Guidance Document for Development of the
Request for Information (RFI) and Notification Letter for
Full-Implementation of the Cyber Security Inspection,
Revision 1, dated October 26, 2017
NRC Inspectors:
817-200-1270
817-200-1548
greg.pick@nrc.gov
steven.alferink@nrc.gov
NRC Contractors:
703-725-9538
240-483-7938
frederick.priester@nrc.gov cynthia.debisschop@nrc.gov
I. Information Requested for In-Office Preparation
The initial request for information (i.e., first RFI) provides the team with the general
information necessary to select appropriate components and cyber security plan
elements to develop a site-specific inspection plan. The team will use the first set of
information requested to identify the list of critical systems and critical digital assets
plus operational and management security control portions of the cyber security plan
to be chosen as the sample set required to be inspected during this inspection. The
first information request is specified in Table RFI #1. Provide the first set of
information to the team leader in the regional office by April 15, 2019, or sooner, to
facilitate the selection of the specific items that will be reviewed during the onsite
inspection weeks.
The required Table RFI #1 information shall be provided on a secure document
management service or passive media (i.e. CD or DVD) to the lead inspector
by April 15, 2019. Please provide four copies of each media submitted (i.e., one for
each inspector/contractor). The preferred file format for all lists is a searchable Excel
spreadsheet file on a CD or DVD. These files should be indexed and hyperlinked to
facilitate efficient review. If you have any questions regarding this information, please
contact the inspection team leader as soon as possible.
2
Table RFI #1
Section 3: Initial Documentation Requests (See Reference 1)
Paragraph Number/Title:
Items
1
List all identified critical systems and critical digital assets
All
2
List critical digital asset facility and site ethernet - transmission control
protocol/internet protocol (TCP/IP) based local area networks (LANs)
and identify those LANs that have non-critical digital assets on them
All
3
List critical digital asset facility and site non-ethernet TCP/IP based
LANs including those industrial networks and identify LANs that have
non-critical digital assets on them
All
4
Network topology diagrams (be sure to include all network intrusion
detection systems and security information and event management
(SIEMs) for emergency preparedness (EP) networks and security
level 3 and 4 networks)
All
8
List all network security boundary devices for EP networks and all
network security boundary devices for levels 3 and 4
All
9
List critical digital asset wireless Industrial networks
All
11
Network Intrusion detection system documentation for critical systems
that have critical digital assets associated with them
11.a.1)
11.a.2)
12
SIEM documentation for critical systems that have critical digital assets
associated with them
12.a.1)
12.a.2)
14
List EP and security onsite and offsite digital communication systems
All
25
Cyber security assessment and cyber security incident response teams
All
28
Copy of current cyber security plan and copy of any 50.54(p) analysis
to support changes to that plan
All
29
Copy of any licensee identified violations and associated corrective
action program documentation to resolve issue(s)
All
In addition to the above information please provide the following:
(1) Electronic copy of the updated safety analysis report and technical specifications
(2) Name(s) and phone number(s) for the regulatory and technical contacts
(3) Current management and engineering organizational charts
(4) Cyber security program procedures
Based on this information, the team will identify and select specific systems and
equipment (e.g., critical systems and critical digital assets) from the information
requested by Table RFI #1 and submit a list of specific systems and equipment to your
staff by the end of the information gathering visit on May 23, 2019, for the second
information request (i.e., Table RFI #2).
3
II. Additional Information Requested to be Available Prior to Inspection
As stated in Section I, the team will examine the documents from the initial information
request, and submit the list of specific systems and equipment to your staff by the end of
the information gathering visit on May 23, 2019. This second information request (i.e.,
Table RFI #2) obtains additional documents required to evaluate the critical systems and
critical digital assets, defensive architecture, and the areas of the cyber security program
selected for the cyber security inspection. The additional information requested for the
specific systems and equipment is identified in Table RFI #2. All requested information
shall follow the guidance document Reference 1.
The Table RFI #2 information shall be provided on a secure document management
service or passive media to the lead inspector by June 17, 2019, or sooner. Please
provide four copies of each CD/DVD submitted (i.e., one for each inspector/contractor).
The preferred file format for all lists is a searchable Excel spreadsheet file on a CD/DVD.
These files should be indexed and hyperlinked to facilitate efficient review. If you have
any questions regarding this information, please call the inspection team leader as soon
as possible.
Table RFI #2
Section 3: Initial Documentation Requests (See Reference 1)
Paragraph Number/Title:
Items
5
Plant computer system block diagram (if plant computer system is
selected for inspection)
All
6
Plant security system block diagram (if security computer system is
selected for inspection)
All
7
Block diagrams for distributed systems (for systems selected for
inspection)
All
10
Host-based intrusion detection system documentation for critical
digital assets (for systems selected for inspection)
10.a.1)
10.a.2)
13
List all maintenance and test equipment (M&TE) used on critical digital
assets (for systems selected for inspection)
All
15 Configuration management
All
16 Supply chain management
16.a
16.b
17 Portable media and mobile device control
All
18 Software management
All
20 Vendor access and monitoring
All
21 Work control
All
22 Device access and key control
All
23 Password/authenticator policy
All
4
Table RFI #2
Section 3: Initial Documentation Requests (See Reference 1)
Paragraph Number/Title:
Items
24 User account/credential policy
All
26 Corrective actions since last NRC inspection
All
27 Cyber security assessments for selected systems
All
In addition to the above information please provide the following:
(1) Names and positions of the CSAT and CSIRT members.
(2) Copies of lessons plans and training presented to the CSAT and CSIRT
members, as well as any general awareness training.
(3) List of dates of CSAT meetings that have occurred.
III. Information Requested to be Available on First Day of Inspection
For the specific systems and equipment identified in Section II, provide the following
request for information (i.e., Table 1st Week Onsite) on a secure document management
service or passive media by July 15, 2019, the first day of the inspection. All requested
information shall follow the guidance in Reference 1.
Please provide four copies of each CD submitted (i.e., one for each inspector/contractor).
The preferred file format for all lists is a searchable Excel spreadsheet file on a CD/DVD.
These files should be indexed and hyperlinked to facilitate ease of use. If you have any
questions regarding this information, please call the inspection team leader as soon as
possible.
Table 1st Week Onsite
Section 3: Initial Documentation Requests (See Reference 1)
Paragraph Number/Title:
Items
10 Host-based intrusion detection system documentation for critical
digital assets (for systems selected for inspection)
10.a.3)
thru
10.a.12)
11 Network Intrusion detection system documentation for critical
systems that have critical digital assets associated with them
11.a.3)
thru
11.a.15)
12 SIEM documentation for critical systems that have critical digital
assets associated with them
12.a.3)
thru
12.a.14)
16 Supply chain management
16.c
19 Cyber security event notifications
All
29
Update to licensee identified violations and corrective action
program actions taken since the initial request was made
All
5
In addition to the above information please provide the following:
(1) Copies of the following documents do not need to be solely available to the
inspection team as long as the inspectors have easy and unrestrained access
to them.
a. Quality Assurance Plan;
b. Technical Specifications, if not previously provided;
c. Latest Individual Plant Examination/Probabilistic Risk Assessment Report;
and
(2) Vendor Manuals, Assessments, and Corrective Actions:
a. The most recent cyber security quality assurance audit and/or
self-assessment; and
b. Corrective action documents (e.g., condition reports, including status of
corrective actions) generated as a result of the most recent cyber security
quality assurance audit and/or self-assessment.
IV.
Information Requested To Be Provided Throughout the Inspection
(1) Copies of any corrective action documents generated as a result of the
inspection teams questions or queries during the inspection.
(2) Copies of the list of questions submitted by the inspection team members and
the status/resolution of the information requested (provided daily during the
inspection to each inspection team member).
If you have any questions regarding the information requested, please contact the team leader.
SUNSI Review: ADAMS: Non-Publicly Available Non-Sensitive Keyword: NRC-002
By: GAP Yes No
Publicly Available Sensitive
OFFICE
SRI:EB2
BC:EB2
NAME
G. Pick
F. Ramirez
SIGNATURE
/RA/
/RA HJG for/
DATE
3/4/2019
3/5/2019