ML19063B412
ML19063B412 | |
Person / Time | |
---|---|
Site: | Vallecitos Nuclear Center, 07000754, 07001113, 07200001, Vallecitos |
Issue date: | 03/26/2019 |
From: | Andrew Pretzello Division of Fuel Cycle Safety, Safeguards, and Environmental Review |
To: | John Miller General Electric Co |
Naquin T | |
Shared Package | |
ML19063B411 | List: |
References | |
Download: ML19063B412 (3) | |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 March 26, 2019 Ms. Jamie Miller, Senior Vice President and Chief Financial Officer General Electric Company 41 Farnsworth Street Boston, MA 02210
SUBJECT:
CANCELLATION AND RETURN OF FINANCIAL ASSURANCE FOR GENERAL ELECTRIC COMPANYS LICENSE NUMBERS: SNM-1097, SNM-960, SNM-2500, SNM-1826, TR-1, DR-10, DPR-1, AND R-33
Dear Ms. Miller:
This letter is to inform the General Electric Company (GE) that the U.S. Nuclear Regulatory Commission (NRC) is returning the superseded financial assurance GE provided to the NRC with respect to GEs NRC License Numbers: SNM-1097 (Global Nuclear Fuels - Americas, LLC), SNM-960 (GE-Hitachi Nuclear Energy Americas, LLC, Vallecitos Nuclear Center),
SNM-2500 (GE-Hitachi Nuclear Energy, LLC, Morris Operation), SNM-1826 (Reuter Stokes Facility), TR-1 (GE-Hitachi Nuclear Energy, LLC, GETR Reactor), DR-10 (GE-Hitachi Nuclear Energy, LLC, EVESR Reactor), DPR-1 (GE-Hitachi Nuclear Energy, LLC, VBWR Reactor), and R-33 (GE-Hitachi Nuclear Energy, LLC, NTR Reactor).
By letter dated January 7, 2019 (Agencywide Documents Access and Management System
[ADAMS] Accession Number ML19014A161), you provided a Notice of Cancellation of Parent Company Guarantee Funds for Decommissioning. The financial assurance previously provided in connection with these licenses was a Parent Company Guarantee (PCG) issued by GE.
By letter dated March 27, 2018, GE submitted surety bonds to replace its PCG as financial assurance for its GE Electric Facilities licenses (ADAMS Accession Number ML18087A172).
The GE replacement surety bonds were reviewed and approved by NRC staff on August 9, 2018 (ADAMS Accession Number ML18218A097).
GE is no longer required to maintain the PCG with respect to these NRC licenses. Therefore, NRC is now cancelling and returning the superseded PCG that was provided to NRC for these facilities.
In accordance with Title 10 of the Code of Federal Regulations, Section 2.390 of the NRCs Agency Rules of Practice and Procedure, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records component of NRCs ADAMS. ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html.
J. Miller 2
If you have any questions concerning this letter, please contact Mr. Tyrone Naquin, Project Manager for the site by telephone at 301-415-7352, or via e-mail to: Tyrone.Naquin@nrc.gov.
Sincerely,
/RA/
Andrew Pretzello, Deputy Director Division of Fuel Cycle Safety, Safeguards, and Environmental Review Office of Nuclear Material Safety and Safeguards Docket Nos.:
07001113, 07000754, 07200001,
- 07002872, 05000070, 05000183, 05000018 License Nos.:
SNM-1097, SNM960, SNM-2500, SNM-1826, TR-1, DR-10, DPR-1, R-33
Enclosures:
Cancelled Parent Company Guarantee cc:
Mr. Scott Murray Global Nuclear Fuels - Americas 3901 Castle Hayne Rd.
P.O. Box 780 - M/C K-84 Wilmington, NC 28401 Ms. Michelle Catts Global Nuclear Fuels - Americas 3901 Castle Hayne Rd.
Wilmington, NC 28401
J. Miller 3
SUBJECT:
CANCELLATION AND RETURN OF FINANCIAL ASSURANCE FOR GENERAL ELECTRIC COMPANY LICENSE NUMBERS: SNM-1097, SNM-960, SNM-2500, SNM-1826, TR-1, DR-10, DPR-1, R-33 DATE: March 26, 2019 DISTRIBUTION: FCSE r/f OLopez, RII CMcKenney/NMSS JParrot, NMSS RAugustus/NMSS PLongmire, NMSS DHardesty, NRR SHarwell, NRR OSiurano-Perez, NMSS ADAMS Package Accession Number: ML19063B411
- via email OFFICIAL RECORD COPY OFFICE FCSE/FFLB FCSE/ERB DUWP/RTAB FCSE/FFLB FCSE/FFLB NAME
- TNaquin AWalker-Smith CMcKenney JZimmerman DPretzello DATE 3/ 4/2019 3/21/2019 3/07/2019 3/25/2019 3/26/2019