Official Transcript of Proceedings NUCLEAR REGULATORY COMMISSION

Title:

Meeting on Fiscal Year 2019 Proposed Fee Rule Docket Number: N/A Location: Rockville, Maryland Date: February 13, 2019 Work Order No.: NRC-0135 Pages 1-103 NEAL R. GROSS AND CO., INC.

Court Reporters and Transcribers 1323 Rhode Island Avenue, N.W.

Washington, D.C. 20005 (202) 234-4433

1 1 UNITED STATES OF AMERICA 2 NUCLEAR REGULATORY COMMISSION 3 + + + + +

4 MEETING ON FISCAL YEAR 2019 PROPOSED FEE RULE 5 + + + + +

6 WEDNESDAY, 7 FEBRUARY 13, 2019 8 + + + + +

9 ROCKVILLE, MARYLAND 10 + + + + +

11 The meeting convened in the Commissioners 12 Hearing Room at the Nuclear Regulatory Commission, One 13 White Flint North, 11555 Rockville Pike, at 1:00 p.m.,

14 Richard Rivera-Lugo, Facilitator, presiding.

15 16 NRC STAFF PRESENT:

17 RICHARD RIVERA-LUGO, Facilitator 18 MAUREEN WYLIE, Chief Financial Officer 19 ANNA BRADFORD, Deputy Director, DCSE/NRO 20 STEPHANIE COFFIN, Director of Budget and Planning 21 RUSSELL FELTS, Deputy Director, DRA/NRR 22 MICHELE KAPLAN, License Fee Policy Team Leader 23 MIKE KING, Director, FCSE/NMSS 24 JANE MARSHALL, Deputy Director, DSS/NRR 25 JOHN McKIRGAN, Chief, SFLB/NMSS NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

2 1 BO PHAM, DUWP/NMSS 2 KEVIN WILLIAMS, MSST/NMSS 3

4 ALSO PRESENT:

5 JOHN BUTLER, Nuclear Energy Institute 6 ERIC JEBSEN, Exelon (present via teleconference) 7 ANDREW MAUER, Nuclear Energy Institute 8

9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

3 1 A-G-E-N-D-A 2 Opening Remarks . . . . . . . . . . . . . . . . . 3 3 Key Features of the NRC FY 2019 Budget . . . . . 7 4 2019 Budget for the Operating Reactors Business 5 Line . . . . . . . . . . . . . . . . . . . 25 6 2019 for the New Reactors Business Line . . . . . 32 7 Materials and Waste Programs . . . . . . . . . . 40 8 Corporate Support . . . . . . . . . . . . . . . . 69 9 Question and Answer . . . . . . . . . . . . . . . 72 10 FY '19 Proposed Fee Rule . . . . . . . . . . . . 84 11 Nuclear Energy Innovation and Modernization 12 Act . . . . . . . . . . . . . . . . . . . . 96 13 Question and Answer . . . . . . . . . . . . . . . 98 14 Closing Remarks . . . . . . . . . . . . . . . . 101 15 16 17 18 19 20 21 22 23 24 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

4 1 P R O C E E D I N G S 2 1:00 p.m.

3 FACILITATOR RIVERA-LUGO: All right, 4 welcome, everyone. Good afternoon. Thanks for 5 participating in this public meeting.

6 My name is Richard Rivera-Lugo. I will 7 be facilitating this public meeting to discuss the 8 proposed FY '19 Fee Rule and the related budget 9 items associated to this proposed fee rule.

10 My role is to help you to ensure that 11 this meeting is informative, productive and on time.

12 With that in mind this meeting is scheduled for 13 three hours with two Q&A sessions at a scheduled 14 time during the meeting. So please hold your 15 questions for those Q&A sessions.

16 Before we get started I would like to go 17 over some housekeeping items that are necessary.

18 With regards to getting around the building please 19 remember that unescorted access is available for the 20 first floor of this Two White Flint and One White 21 Flint complex.

22 Any other areas you will require an 23 escort to move around.

24 As I mentioned a little bit earlier 25 please remember to sign your name on the sheets NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

5 1 located at the doors of this commissioner's hearing 2 room.

3 And in the event of an emergency if we 4 are asked to evacuate the building please do so in a 5 calmly manner. Go outside the building. Follow the 6 directions from the security personnel and follow 7 the staff outside. We will gather on the extreme 8 end of the plaza in front of the building and we 9 will need to take a head count so it's extremely 10 important that you sign up on the sheets at the door 11 so we can make sure that everybody is outside 12 safely.

13 Today's meeting is a category 2 meeting 14 with participation from the NRC staff and external 15 stakeholders. And this meeting will be facilitated 16 to ensure that issues and concerns are presented, 17 understood and considered by the NRC staff.

18 The agenda for the meeting will be 19 discussed shortly by Maureen Wylie. And we invite 20 your comments and questions at the designated points 21 during the meeting. We will cue you when it's time 22 for those Q&A sessions.

23 For people in the room we ask that you 24 please turn off or mute all electronic devices. And 25 if you must answer a phone call please do so outside NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

6 1 to avoid any disruptions.

2 We ask that you allow the speakers to 3 present their information and hold any comments or 4 questions until the designated Q&A sessions, and 5 avoid any side conversations that may distract the 6 speakers or the audience listening to the meeting.

7 If you have any questions please use the 8 microphones located in both ends in the front of the 9 room. Speak clearly on the microphone and always 10 state your name and affiliation to make sure that we 11 have the correct record for this meeting.

12 The meeting will be transmitted via 13 webcast and the presentation is posted in the NRC 14 public website.

15 If you're participating remotely we 16 strongly encourage that you mute your phones and 17 computers. During the Q&A sessions if you have a 18 question that you would like to ask any of the 19 presenters please dial *1 and record your name and 20 our operator will facilitate the questions from the 21 phone.

22 Any follow-up questions will be 23 addressed after the meeting and I will provide 24 information on how to submit those questions to the 25 participants so you can get a follow-up from them.

NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

7 1 For the NRC staff in the audience I will 2 like to remind you that obviously our guests from 3 the industry and the public are here to participate 4 in this meeting. They have the priority when it 5 comes to questions and comments to the NRC staff.

6 So unless you find it imperative to have 7 any comments on the public record we ask that you 8 hold your comments or questions until the end of the 9 Q&A sessions.

10 With that I would like to turn it over 11 to Maureen Wylie, our chief financial officer.

12 MS. WYLIE: Thank you very much. It's 13 great to have our annual all fees, all the time 14 meeting. Thanks very much.

15 I'm very excited about presenting our 16 2019 proposed fee rule to our stakeholders. And I 17 hope to enhance our dialogue as we have over time 18 through meetings like this one.

19 I'm very happy to report that we 20 published the 2019 fee rule on the 31st of January, 21 only two days behind our original planned 22 publication date. We were impaired from the Federal 23 Register -- thank you, I wanted to say record, I 24 knew that was not right -- by the government 25 shutdown.

NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

8 1 Unfortunately we were not able to make 2 an emergency justification for publishing the fee 3 rule. I do believe that this is the earliest we 4 have ever published the fee rule in any case so I'm 5 pretty excited about that.

6 The 2019 professional hourly rate will 7 be increasing this year from $275 to $278 due to a 8 decrease in the number of mission-related FTEs 9 primarily due to standardization and centralization 10 of some mission support functions and the transition 11 of Wyoming to a agreement state status for uranium 12 recovery.

13 Michele will talk a little bit about 14 that more later.

15 Further, some of our flat license fees 16 have also increased. Some as usual do decrease 17 mostly as related to the professional hourly rate 18 but also because we do a biennial review of fees as 19 required by the administration.

20 So, you will continue to see that sort 21 of biennial adjustment in materials fees.

22 For annual fees they have increased for 23 some licensees and decreased for others. We're 24 going to go into more depth on that later in the 25 meeting.

NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

9 1 Could we have the agenda slide? All 2 right, well here we are.

3 As we have in some other years we're 4 going to do a comprehensive review of the FY '19 5 congressional budget justification.

6 And so my fellow panelists are Jane 7 Marshall who is the deputy director of the Division 8 of Safety Systems, Office of New Reactor Regulation, 9 Russell Felts, deputy director of the Division of 10 Risk Assessment. They're both from NRR.

11 Anna Bradford, the deputy director of 12 the Division of Licensing, Siting and Environmental 13 Analysis, Office of New Reactors. They'll be 14 talking about the business lines that make up the 15 operating reactor fee class.

16 When their presentation is finished we 17 will do a little bit of re-seating -- excuse me, 18 when Mike's done. Mike King is our new director of 19 the Division of Fuel Cycle Safety, Safeguards and 20 Environmental Review in the Office of Nuclear 21 Materials Safety and Safeguards.

22 When he's done we'll do some shifting of 23 the panelists so we'll all be able to see you and at 24 that point we'll hear from Kevin Williams, the 25 deputy director of the Division of Materials, NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

10 1 Safety, Security, State and Tribal Programs in NMSS.

2 John McKirgan will present on the budget 3 for the spent fuels business line and he's the chief 4 of that branch in NMSS.

5 Bo Pham is the deputy director of the 6 Division of Decommissioning, Uranium Recovery and 7 Waste Programs in NMSS.

8 Stephanie Coffin, the budget director 9 here. She will talk about corporate support 10 primarily.

11 Michele Kaplan who is the lead for our 12 license fee policy team will talk about the process 13 for developing fees and our success in fees 14 transformation.

15 All right, so I'm going to talk in 16 general terms about the budget and fees for '19. So 17 let's go to the next slide, please.

18 And honesty compels me to say though 19 most of you probably don't need the basics on fees, 20 but we're going to give you a quick overview anyway.

21 So, the Omnibus Budget Reconciliation 22 Act of 1990, also called OBRA '90 as adjusted 23 requires that we collect approximately 90 percent of 24 our current year's appropriation in that year.

25 As you're well aware we conduct a major NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

11 1 rulemaking throughout the year including data 2 gathering, preparing calculations, updating the rule 3 itself, and responding to public comments.

4 We have two parts of 10 CFR that cover 5 the collection of our fees. Part 170 which is fees 6 for service at an hourly rate and Part 171 which are 7 annual fees.

8 On January 14 of 2019 the President 9 signed the Nuclear Energy Innovation and 10 Modernization Act, or NEIMA. He signed it into law.

11 The act includes provisions affecting 12 budget formulation, creating a revised framework for 13 fee recovery, and requires the agency to conduct a 14 number of reports associated with advanced reactor 15 activities and some others.

16 The act specifies three objectives to 17 its purpose, to provide a revised framework for fee 18 recovery, to ensure the availability of resources to 19 meet industry needs without burdening existing 20 licensees unfairly for an accurate workload 21 projections or premature reactor closures.

22 Number two is to support the development 23 of expertise in regulatory infrastructure necessary 24 to support the development and commercialization of 25 advanced reactors.

NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

12 1 And third, to foster a more efficient 2 regulation of uranium recovery. Stephanie will have 3 more on that later.

4 It's important to recognize that while 5 we are reacting to this rule it won't actually 6 become a requirement for us until the FY '21 fee 7 rule. But nonetheless we'll talk about it a little 8 bit later in the program.

9 All right, now my favorite part where I 10 talk to you about out of scope comments. Sometimes 11 we receive comments that are out of scope for the 12 fee rule.

13 Over the last few years we notice and 14 appreciate that there's been a large decrease in the 15 number of out of scope comments. I hope that's 16 because of the outreach and dialogue that we conduct 17 with you over the course of a year and over the 18 years that we've worked on this together.

19 However, just to focus this these 20 comments that are typically ruled to be out of scope 21 are those that are not on the methodology for 22 calculating fees, changes to fee regulation, or the 23 schedules themselves.

24 We typically continue to hear about 25 needed efficiencies to achieve our mission goals, NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

13 1 changes in our overall regulatory practices such as 2 common prioritization of rulemaking, cumulative 3 effects of regulation, and risk-informed 4 performance-based licensing.

5 Even though this meeting on fees is not 6 the proper venue for those questions and concerns we 7 really do want to hear them. And we do urge you to 8 seek out the appropriate venue so that we can 9 address those concerns directly.

10 In closing, I do want just to emphasize 11 that we are continually evaluating how we approach 12 our fee-setting processes. And we are looking for 13 ways that we can enhance transparency, equitability 14 and timeliness.

15 Michele is going to go over our 16 successes in that area to date after the first 17 break.

18 As always we welcome your questions and 19 your formal comments, and we look forward to a 20 continued dialogue with you, our stakeholders.

21 Again, thank you for participating and 22 let's go to the next slide.

23 Our new appropriation. So for the first 24 time since 1997 we have our appropriation before the 25 beginning of the fiscal year.

NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

14 1 Our proposed rule is based on the Energy 2 and Water, Legislative Branch, and Military 3 Construction and Veterans Affairs Appropriation Act 4 of 2019 enacted on the 21st of September 2018.

5 Because budgets and fees are linked we 6 will be providing to you an overview of the budget 7 related to that appropriation so that you can 8 further understand the appropriate relationship 9 between the fee schedules and that budget.

10 The act appropriated approximately $911 11 million to us which is a decrease of approximately 12 $11 million from 2018.

13 The amount does not include the use of 14 carryover since we don't further charge fees on 15 carryover. Once we've charged you fees we only do 16 it that one time.

17 Let me explain what we mean by 18 carryover. The term "carryover" is used to describe 19 funds that were appropriated but not obligated from 20 a prior fiscal year, or were de-obligated because 21 the funds are no longer needed. Say a contract is 22 closed and the work has all been achieved. If there 23 are resources left on the contract we de-obligate 24 those resources.

25 Sometimes because it takes us usually NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

15 1 about a two-year period to formulate, receive an 2 appropriation for and execute our budget there's 3 often a change in the workload between the time that 4 we do that and the time that we actually bill you 5 for fees.

6 So there are often changes, and if we 7 don't need the money we don't spend it and we carry 8 it over and use it in other years.

9 In Fiscal Year '19 our appropriation was 10 reduced by our congressional appropriations 11 subcommittee to use $20 million in prior year 12 unobligated balances.

13 That follows a pattern that we've seen 14 over the last several years. In 2018 the amount we 15 were directed to use was $15 million.

16 So, on to how we develop the fee 17 schedule. We begin by excluding certain amounts 18 from fee recovery. And those areas are 19 international activities, advanced reactor 20 technologies, regulatory infrastructure, waste 21 incidental to reprocessing activities, the inspector 22 general's services for the Defense Nuclear 23 Frequencies Safety Board and generic homeland 24 security activities.

25 In Fiscal Year '19 the total for that NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

16 1 group is $43.4 million, a slight decrease from last 2 year.

3 For 2019 after deducting these excluded 4 items and making some adjustments for when bills 5 which we have issued in previous years will actually 6 be paid we propose to collect approximately $781.9 7 million in fees, a decrease of $7.4 million from our 8 2018 collection target. Let's go to the next slide.

9 So we're going to talk a little bit next 10 about the professional hourly rate. And these 11 materials are available both on the web and in the 12 room. So this is a little bit hard to read.

13 So we have table 2 on the screen right 14 now from the fee rule which has the information 15 associated with our professional hourly rate 16 calculation.

17 This is germane specifically to our Part 18 170 fees for service billings.

19 In the table the first three line items 20 are those types of resources that are used to 21 critical that rate. Mission direct program salaries 22 and benefits, mission indirect program support and 23 agency support.

24 Just to refresh you, mission direct 25 program salaries and benefits resources fund the NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

17 1 core work activities committed to fulfilling the 2 agency's mission of protecting the public health, 3 safety and promoting the common defense and security 4 as well as protecting the environment.

5 These resources include the primary work 6 activities associated within the major program 7 business lines, operating reactors, new reactors, 8 fuel facilities, nuclear material users, 9 decommissioning and low level waste, and spent fuel 10 storage and transportation.

11 Mission indirect program resources fund 12 activities that support -- not a great leap -- those 13 activities.

14 These resources include supervisory and 15 non-supervisory support including administrative 16 assistance and mission travel and training.

17 Agency support is the combination of the 18 resources for corporate support and the Office of 19 the Inspector General.

20 These are the types of resources 21 associated with offices such as the chief 22 information officer, financial management under the 23 chief financial officer, human capital services, 24 administrative support. Standard across the 25 government, relatively standard with the private NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

18 1 sector as well.

2 Overall the budgeted resources to be 3 included in the professional hourly rate calculation 4 decreased by $9 million, or about 1.2 percent.

5 However, the mission direct program 6 salaries and benefits increased this year by $9 7 million or 2.8. I'll explain why next.

8 The FTE reductions that we took in the 9 2019 congressional budget request in response to the 10 decreased projected workload were not sufficient to 11 overcome the increases in salaries and benefits.

12 As in other federal agencies the NRC's 13 workforce is aging and associate benefit costs have 14 increased accordingly.

15 Primarily those concerns are associated 16 with healthcare costs and pension benefits.

17 This contributes to the rising cost of 18 salaries and benefits that we've experienced in the 19 last several years. Next slide, please.

20 Next I'd like to turn to our Part 171 or 21 annual fee billings generally. Those fees decreased 22 due to decreased budgets based on workload 23 reductions.

24 However, there were increases for some 25 licensees and I'd like to talk about the reasons NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

19 1 associated with those increases.

2 While budgetary resources remained 3 relatively stable from '18 to '19 particularly for 4 operating power reactors the annual fee increased 5 because our estimated Part 170 billings declined 6 from those that we had in 2018. So year over year 7 there was less Part 170 estimated in the proposed 8 fee rule.

9 There are certain obvious drivers 10 associated with that. Specifically the shutdown of 11 the Oyster Creek Nuclear Generating Station at the 12 end of 2018 means that there were no licensing 13 activities included in the budget in '19.

14 Since there is the planned shutdown of 15 both Pilgrim and Three Mile Island we expect that 16 there will be less licensing activity, only the bare 17 minimum for those plants during Fiscal Year '19.

18 Within the new reactors area we have 19 completed the APR-1400 design certification for 20 Korea Hydro and Nuclear Power Company.

21 And then as a part of our fees 22 transformation and as a part of our dialogue with 23 stakeholders we have changed our methodology 24 associated with the overhead associated with program 25 managers and resident inspectors.

NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

20 1 Instead of a 6 percent surcharge 2 effectively we have changed to a new methodology 3 where we're going to collect actual hourly costs.

4 Since we have just begun collecting that 5 there is a large delta between what we collected in 6 '19 and the hourly efforts that we've collected so 7 far.

8 What you see in the proposed rule in 9 this area is the maximum that you would see 10 associated with that. And as we move toward the 11 final rule there will be additional adjustments when 12 we get more actual data collected in those areas.

13 And then as is well known to everyone 14 the fee rule now includes 98 reactors instead of 99.

15 So that reduces the number of reactors across which 16 to spread those budgetary resources.

17 Let me just perhaps restate the obvious, 18 but we are an intellectual capital organization. We 19 provide engineering and scientific services through 20 government employees which are characterized in the 21 budget as full-time equivalents.

22 We do use some contract support but that 23 is perhaps one-third of our budget roughly, rather 24 than two-thirds associated with people.

25 So, some changes associated with NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

21 1 reductions don't always result in those total costs 2 being reduced as well. But we still need to 3 maintain the number of people with the skills that 4 we require in order to get the work done.

5 We've talked about increasing costs.

6 One of the challenges that we have is that we are 7 not assessing new workers. That has been happening 8 across the other federal agency. But over the last 9 almost five years we've been conducting efficiency 10 seeking associated with our Project Aim activities 11 and as a significant portion of that we have really 12 reduced the number of people that we hire from the 13 outside. So that's having a significant adjustment 14 on our costs associated with operating reactors.

15 For materials users some licensees saw 16 increases due to a realignment of resources. So, in 17 previous years we had certain resources that were 18 associated with the oversight of agreement states 19 that we had in fee relief.

20 We conducted a significant review of 21 that program and we determined that some of the 22 resources that we had in fee relief were more 23 accurately budgeted outside of fee relief. So 24 that's one of the reasons you'll see an adjustment.

25 And then for DOE transportation NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

22 1 licensees the increase is mainly due to an 2 additional certificate of compliance from 21 in 2018 3 to 22 in 2019.

4 You'll hear a little more detail about 5 these changes later on in the presentation. Next 6 slide.

7 Not to belabor the point, but although 8 there isn't a 1 to 1 correspondence between our 9 budget structure and fees there is a very strong 10 correlation.

11 And so rather than cover this 12 information in each section we wanted to start off 13 with a description of how our budget is developed in 14 terms of its structure to be -- as a baseline for 15 all of the presentations you'll hear next.

16 So, this is a very high-level schematic 17 of our budget structure. We have eight business 18 lines. Two of those are within the reactor safety 19 program, operating reactors and new reactors. Five 20 are within the materials and waste safety program, 21 and one is corporate support which includes all of 22 those agency-wide administrative activities.

23 You'll also see that the Office of the 24 Inspector General, the budget for that office is 25 distributed proportionally. We don't treat them as NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

23 1 a separate business line.

2 Also, corporate support is also 3 distributed proportionally across the business lines 4 when we transition to fee classes.

5 The Integrated University Program which 6 is a program that we don't request but we've 7 received for many years now, this program is 8 embedded in our fee relief category and so no fee is 9 charged on that. Next slide, please.

10 Within each of the business lines we 11 have product lines. This slide shows an example of 12 the operating reactors business line.

13 Here, things are grouped under mission 14 direct and mission indirect which I've mentioned 15 previously and is part of how we do the calculation 16 for the hourly rate.

17 We also have resources in product lines 18 for which you do not pay fees. In this instance 19 that would be international activities and generic 20 homeland security activities.

21 Generic homeland security activities are 22 just that. These are activities that we have to 23 conduct as a part of our membership in the federal 24 family, but don't apply to any specific reactor.

25 That's why they are not charged to fees.

NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

24 1 The titles are fairly self-explanatory.

2 I don't think that there's anything that's not 3 obvious here.

4 But if you do have questions I'm happy 5 to take them or Stephanie during our first question 6 and answer session. Next slide, please.

7 Okay, so numbers may not add due to 8 rounding which always happens to me when we do these 9 round number percentage charts. But this shows how 10 our business lines contribute to the total budget of 11 the agency. And this excludes the Office of the 12 Inspector General.

13 Operating reactors and corporate support 14 business lines, blue for operating reactors and 15 green for corporate support, are the two largest 16 percentage segments of our budget.

17 You'll be hearing about all of our 18 business lines during our presentation.

19 So let me transition to why we're going 20 through the process of talking about each of the 21 business lines.

22 Our purpose here is twofold. We want to 23 be as transparent as we can in our budget 24 development process so that you'll understand how we 25 go about calculating our budgetary requirements.

NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

25 1 And we would like to share where you 2 could help us through greater input into our 3 workload setting process.

4 As I mentioned earlier it takes us about 5 two years to get through the process so recognizing 6 that any information that we collect has some risk 7 associated with it of not being accurate.

8 But we are working across our business 9 lines and within my office to try to continue to 10 enhance our budget estimating capability.

11 It's obvious to us that we need you to 12 be our partner in this regard. And because you have 13 a much better and more direct understanding of where 14 your organization or your companies will be going in 15 the future.

16 All right, with that plea which you will 17 hear echoes of through our presentation I'd like to 18 turn the discussion over to Jane Marshall and 19 Russell Felts who will be discussing the 2019 budget 20 for the operating reactors business line. Jane?

21 Oh, Russell, okay.

22 MR. FELTS: Thanks, Maureen, and good 23 afternoon everyone. I'm Russ Felts and my colleague 24 Jane Marshall and I will be presenting to you a 25 review of the operating reactors business line.

NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

26 1 We'll provide information on how the 2 budget changed from Fiscal Year '18 to '19 and how 3 that impacted the reactor fee class.

4 We also want to share with you how we 5 developed our budgets in general and in particular 6 how you can help us improve by providing your plans 7 for specific engagements with us. Next slide, 8 please.

9 MR. MARSHALL: The operating reactors 10 business line encompasses the regulation of 11 operating civilian nuclear power reactors, research 12 and test reactors and other non-power production 13 utilization facilities such as medical isotope 14 production facilities.

15 The table on this slide shows the 10 16 product lines within the operating reactors business 17 line which Maureen described in her introduction.

18 The operating reactors business line is 19 composed of mission direct resources, mission 20 indirect resources and some resources which are 21 excluded from the fee base.

22 We've included the percentages of our 23 business line budget for each of these groupings.

24 As we would expect, the majority of the business 25 line resources are mission direct and they fund the NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

27 1 NRC's core activities including event response, 2 licensing, oversight, rulemaking and research.

3 Mission indirect resources support the 4 execution of our core activities and include things 5 such as supervisors, administrative staff and 6 travel.

7 I would like to note that while generic 8 homeland security and international activities are 9 important to the operating reactors business line 10 these resources are excluded from the fee base which 11 means that these items are not part of the 90 12 percent that the NRC recovers in fees.

13 So we aren't planning on speaking to 14 those particular areas. Next slide.

15 The mission direct product lines. The 16 four shown on this slide received the most 17 resources. Some of the specific activities within 18 each product line are shown.

19 We ensure the safety and security of 20 operating nuclear power reactors and research and 21 test reactors by putting regulatory requirements in 22 place mostly through rulemaking.

23 Licensing facilities to operate in 24 accordance with those regulations and then through 25 inspection overseeing facility operation in NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

28 1 accordance with the requirements.

2 We've seen an increase in applications 3 from licensees to implement risk-informed 4 operational programs which entails some front end 5 costs to make these changes to the licenses but 6 provide licensees increased operational flexibility 7 and should facilitate fewer licensing actions in the 8 future.

9 For example, through implementation of a 10 risk-informed completion time program licensees may 11 risk-inform allowed outage times for some plant 12 equipment, possibly obviating the need to come into 13 the NRC with a one-time emergent license amendment 14 request if they experience an equipment outage that 15 extends past the existing outage time limits in 16 their license.

17 Another area of increasing work is in 18 subsequent license renewal which is the extension of 19 a plant's license to operate.

20 Oversight activities comprise the 21 largest portion of our budget. This includes onsite 22 resident inspectors and safety and security 23 inspections conducted from our four regional offices 24 and a few from headquarters. It also includes 25 allegations and event evaluation. Next slide, NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

29 1 please.

2 MR. MARSHALL: Workload forecasting is 3 our first step when developing the operating 4 reactors business line budget. It's primarily 5 influenced by the number and type of licensing 6 action requests we anticipate which affect both 7 licensing and inspection workload.

8 As an example a subsequent license 9 renewal application requires multiple FTE at the 10 headquarters for review but also some operating 11 reactor resources in the regional offices to perform 12 the inspections that follow the review.

13 Most of our information on these 14 activities comes from the letters of intent sent to 15 us by licensees, but we also adjust our budget 16 forecast downward when we receive notifications of 17 planned plant closures.

18 Finally, we have our project managers 19 for each facility talk with their facility to get an 20 idea of what types and number of amendment requests 21 they plan to submit for the budget year that's 22 currently under development.

23 At the moment we are formulating our FY 24 2021 budget so calls will be made soon to ask for 25 plans for 2021.

NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

30 1 The better information we can get during 2 budget development, the closer we can get our budget 3 estimate to actual needs. This keeps our staffing 4 levels on par with the workload and minimizes delays 5 in reviewing license amendment requests.

6 During budget development we also 7 consider the type and complexity of licensing 8 actions we are expecting. For some actions we may 9 need to have an engineering safety review and an 10 environmental review so knowing that action will be 11 requested allows us to ensure that we have adequate 12 resources for both of those activities.

13 The cost of completing our license 14 reviews varies depending on the level of complexity 15 with the licensing action. As an example, a 16 subsequent license renewal application takes 17 considerably more staff effort than a routine 18 license amendment request to make an administrative 19 change to a license.

20 Some other budget drivers that we 21 consider during the budget development include 22 potassium iodide replenishment schedules for 23 emergency preparedness in the states that have 24 requested potassium iodide.

25 New work such as the work in accident-NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

31 1 tolerant fuels. We're currently reviewing technical 2 documents that are needed to support the first 3 planned batch loading and other budget drivers will 4 decrease the budget need such as plant closures and 5 completion of the Fukushima work.

6 We also continuously strive to be more 7 efficient which leads to lower budget needs as well.

8 We do consider historical information 9 when developing our budget and we review the level 10 of resources associated with past similar efforts 11 and past resource utilization. Next slide, please.

12 MR. FELTS: This slide shows how the 13 enacted budget change for the business line for 14 Fiscal Year '18 to '19. This is the starting point 15 for calculating fees.

16 The operating reactors budget decreased 17 by 18 FTE and $6 million in contract support and 18 travel. The $4.9 million total increase you see on 19 the slide is due to a $10.9 million increase in 20 salaries and benefits as Maureen mentioned.

21 A few examples on the slide. Under 22 event response you see an increase which was largely 23 driven by an increase in potassium iodide for nine 24 states, something Jane also touched on.

25 Under licensing you'll see an increase NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

32 1 which is largely driven by a few factors. One was 2 an increase in risk-informed licensing activities 3 and license amendment requests.

4 Another was an increase in budgeting for 5 subsequent license renewal, and also an increase for 6 the development of the ATF licensing process.

7 Also in that line is a pretty 8 substantial decrease for Fukushima work.

9 In oversight there was a pretty 10 substantial increase due to the higher salaries and 11 benefits rate.

12 We also had increases in research 13 largely due to research activities funded through 14 the use of -- for ATF, sorry.

15 Before we talk about how this budget 16 translates into annual fees I'd like to turn the 17 presentation over to Anna Bradford to share similar 18 information for the new reactors business line.

19 Both of these business lines feed into the operating 20 power reactor fee class so it's important to 21 understand how both have changed between Fiscal Year 22 '18 and '19 in order to better understand the change 23 to the annual fee. Next slide, please.

24 MS. BRADFORD: Thanks, Russ. So as 25 Maureen stated my name is Anna Bradford. I'm the NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

33 1 division director of the Division of Licensing, 2 Siting and Environmental Analysis within the Office 3 of New Reactors. We can go to the next slide, 4 please.

5 So within the new reactors business line 6 we budget against these product lines. Obviously 7 this table looks similar to the one that you just 8 saw from NRR with a few changes.

9 Our total budget within the new reactor 10 business line is about $94 million which equates to 11 386 FTE and about $21 million in contract resources.

12 You can see the percentage there for 13 mission direct is 68 percent which is about $64 14 million. Mission indirect is 20 percent and then 15 resources that are excluded from the fee base which 16 is 12 percent for us which is largely comprised of 17 the advanced reactor work that we're doing as well 18 as international activities. So next slide, please.

19 So this slide shows some activities that 20 the business line is working on in FY '19 21 specifically.

22 Under licensing we're working on the 23 NuScale Design Certification Review. We hope to 24 finish phase 2 of that review in April which would 25 mean completion of the -- I'll call it the first NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

34 1 draft of our safety evaluation report.

2 We're also working on the Clinch River 3 Early Site Permit which we hope to complete in FY 4 '19 except for some hearing activities.

5 We're working on the ABWR design 6 certification renewal as well as the APWR design 7 certification which have both been budgeted at a low 8 rate while we worked on those higher priority items.

9 We've also been working on Vogtle 10 license amendments as they are doing construction at 11 their site. They find things that they need to 12 change from the design certification and they submit 13 license amendments and we review and disposition 14 those.

15 In terms of oversight one of our larger 16 activities is construction oversight. Again that's 17 for the Vogtle construction site in Georgia.

18 We have resident inspectors down there 19 as well as some resources in Region 2 that's 20 providing that construction oversight.

21 And then as I mentioned advanced 22 reactors, we're doing a lot of work to prepare and 23 to work with industry specifically for non-light 24 water reactor activities. Next slide, please.

25 So we develop our budget similar to what NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

35 1 you heard from the operating reactor business line.

2 In terms of how we forecast our workload we depend 3 on letters of intent from proposed applicants or 4 potential applicants I should say going out several 5 years. We try to look out five years in advance and 6 we request that applicants let us know what their 7 plans are within that five-year window.

8 We also are in frequent communications 9 with industry and with potential applicants as well 10 as current licensees such as Vogtle to understand 11 what they're planning for the upcoming years that 12 might end up resulting in workload changes for our 13 staff.

14 We also again as the operating reactor 15 business line go back and look at historical data.

16 How long did it typically take us to review a design 17 certification or COL so that we can then use it to 18 plan for future activities?

19 So the previous slide I talked about 20 some specific activities we're doing in FY '19 in 21 the new reactor business line.

22 This shows some generic activities that 23 we look at in general when we're planning our 24 budget. So we plan for design certifications, for 25 combined licenses, early site permits. And this is NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

36 1 for light water reactors, non-light water reactors 2 and small modular reactors.

3 Obviously we looked at the number and 4 the complexity of the licensing actions that the 5 industry tells us they're planning for.

6 We think about whether we need pre-7 application activities which are basically 8 interactions with the applicant before they even 9 submit the application to help prepare them and us 10 for the work.

11 We also have some rulemaking activities.

12 One of the main ones right now is a revision to Part 13 52 which is really kind of the backbone of the whole 14 new reactor licensing process. We're looking to 15 update it and make some changes based on lessons 16 learned.

17 We also have research needs that we work 18 with the Office of Research on. We develop guidance 19 that supports these licensing activities and then as 20 I mentioned we have construction oversight. So next 21 slide, please.

22 This slide shows how the new reactor 23 business line enacted budget changed from FY '18 to 24 FY 2019.

25 Overall there's a decrease of $4.5 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

37 1 million in our enacted budget compared with FY '18.

2 The key drivers for these reductions are the 3 completion as Maureen mentioned of the APR-1400 4 design certification which was a large effort for us 5 but which we did complete in FY '18.

6 We also completed a very large revision 7 of Reg Guide 1.206 which provides guidance to 8 applicants. And we've completed that.

9 The increase in the research product 10 line is to support the infrastructure development 11 for the advanced reactors which are again the non-12 light water reactors.

13 And as I mentioned the primary increases 14 in rulemaking are to support the part 5052 but also 15 we do design certification rulemakings for designs 16 when we've completed the safety review.

17 So right now, for example, we're working 18 on the rulemaking for the APR-1400 design 19 certification.

20 So now Stephanie will discuss how the 21 two business lines translate into fees.

22 MS. COFFIN: Thank you, Anna. So I am 23 jumping in here because there are factors driving 24 the increase in fees that's really beyond the budget 25 and so I wanted to lay those out for you.

NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

38 1 Maureen touched on the vast majority of 2 them. Next slide, please, Aracelis.

3 So, the proposed annual fee is 4 increasing by 8.4 percent. So the total budgeted 5 resources essentially stayed flat from '18 to '19.

6 There was an increase in the overall for the 7 operating reactors business line. There was a 8 decrease, an offsetting decrease in the new reactors 9 business line so overall it's flat.

10 So you might ask yourself well, why 11 isn't my fee staying flat and there's a couple of 12 reasons for that.

13 One is that we have fewer number of 14 reactors paying into the fee class because Oyster 15 Creek moved away from this fee class in Fiscal Year 16 '19.

17 The other detail that plays into this is 18 in '18 the low-level waste surcharge and the fee 19 relief which was a credit in '18 turned into a debit 20 in '19. And so you're paying portions of that as 21 well in '19 which is a change in trajectory from 22 '18.

23 But really the biggest factor that's 24 playing into the increase in the annual fees is the 25 Part 170 decrease that Maureen talked about.

NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

39 1 The removal of the project manager 2 resident inspector 6 percent surcharge. We did that 3 deliberately and based on feedback from our 4 stakeholders that that practice wasn't as 5 transparent as they would like and we agreed. And 6 we made that change and this is one of the impacts 7 of that change.

8 Oyster Creek in shutdown, now their 9 license amendments aren't being processed through 10 the operating reactors business line.

11 The completion of the APR-1400 design 12 certification. That was a big Part 170 billings 13 operation but that's completed and so that's 14 reduced.

15 And then any plant that we see posting 16 into shutdown, they generally as Maureen alluded to, 17 they start being very selective on the license 18 amendments that they need to pursue and just start 19 paying a lot of attention to that. And so we 20 generally expect reduced licensing actions from 21 those sorts of plants.

22 And then staff efficiencies which 23 generally everybody is very happy about staff 24 efficiencies, but if we get the work done faster, 25 smarter, better that does mean that your 170 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

40 1 billings are decreased and so there's going to be an 2 offset that you're going to see in your annual fees 3 as a result of that.

4 So, I am going to now -- we're going to 5 do a switch and move away from our reactor programs 6 to our materials programs. And I'll give you guys -

7 - you guys want to have a chance. And so we're 8 going to get the whole materials and waste team up 9 here now.

10 And first up is Mike King to my right 11 here.

12 MR. KING: Good afternoon, everyone.

13 I'm Mike King. I'm the new division director, 14 Division of Fuel Cycle Safety, Safeguards and 15 Environmental Review. And I'll be walking you 16 through the Fiscal Year '19 budget and the 17 associated reduction in annual fees and a little bit 18 what's behind all that. Next slide, please.

19 You've seen this table multiple times 20 now so I'll try not to be too repetitive. But this 21 does show the nine product lines within the fuel 22 facilities business line which is composed of 23 mission direct, indirect and resources that are 24 excluded from the fee base.

25 In the '19 budget the majority of the 96 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

41 1 FTE of overall business lines in the fuel facility 2 area fund NRC core activities.

3 The mission indirect resources encompass 4 approximately 22 percent of those activities. And 5 while generic homeland security and international 6 activities are excluded from the fee base. Next 7 slide.

8 The fuel facilities business line is 9 responsible for ensuring the safety and security of 10 fuel cycle facilities and greater than critical mass 11 facilities.

12 The business line leads the licensing 13 and oversight activities for these facilities as 14 well as the NRC's implementation of domestic 15 material control and accounting program and the 16 international safeguards program.

17 The fuel facilities business line also 18 provides licensing and oversight support for a 19 number of additional licensees that possess greater 20 than critical mass quantities of special nuclear 21 material such as universities and research and test 22 facilities.

23 Additional license activities that we 24 conduct includes the review of license amendments, 25 decommissioning funding plans, emergency plans and NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

42 1 security plans.

2 Additional oversight activities that we 3 conduct include inspections, force on force 4 exercises, and readiness reviews and collaborations 5 with headquarters and Region 2 in Atlanta.

6 The fuel facilities business line also 7 conducts rulemaking for fuel facilities. Next 8 slide, please.

9 Workload forecasting is the first thing 10 we do when developing the fuel facilities business 11 line budget. It's primarily influenced by the 12 number and type of facilities we anticipate and 13 their status which affect both licensing and 14 inspection workload.

15 We also factor in any information we 16 have regarding anticipated significant licensing 17 actions. For example, any letters of intent that 18 licensees send us regarding upcoming licensing 19 applications help to improve the quality of our 20 budget forecast.

21 So we maintain communications with our 22 stakeholders and encourage them to keep us informed 23 of any significant future licensing activities as 24 early as possible.

25 In developing our budget we also look at NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

43 1 the type of work that we anticipate will be before 2 us for review. Depending on the type of licensing 3 action we may need to have safety review and an 4 environmental review so we ensure we have the 5 necessary resources to conduct those reviews.

6 The cost of completing our licensing 7 reviews varies depending on the level of complexity 8 and the licensing action that might be before us.

9 For example, a new facility license 10 application or a license renewal are budgeted more 11 resources than a routine license amendment.

12 As far as budgeting for potential 13 hearings associated with licensing actions we budget 14 based on our best estimate of the hearings that we 15 might get based on the nature of the license action 16 we expect.

17 We try to gauge that based on the level 18 of public interest in a particular project.

19 The budgeted resources associated with 20 those hearings are based on a historical review of 21 the level of effort that we've expended supporting 22 similar efforts in the past.

23 The scope and frequency of inspection 24 activity vary by the type of facility. For example, 25 a category 1 facility receives more inspection than NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

44 1 a category 3 facility.

2 Inspection resources are budgeted 3 primarily based on the number and types of operating 4 facilities which we will see during the inspection 5 year. Next slide, please.

6 This slide shows how the enacted budget 7 changed for fuel facilities business line from '18 8 to '19. Overall there's a decrease of $1.9 million 9 which includes a reduction of 18 FTE in the '19 fuel 10 facilities enacted budget compared to '18. An 11 overall reduction of 7.8 percent.

12 There were significant reductions under 13 licensing and oversight product lines primarily due 14 to aligning resources with a smaller projected 15 workload.

16 Resources decreased primarily as a 17 result of an expected decline in work associated 18 with license renewals, a decrease in the number and 19 complexity of anticipated license amendments, and 20 efficiencies gained as a result of changes to the 21 fuel facilities inspection program and workload 22 projections.

23 In addition, there was a reduction under 24 the rulemaking product line due to anticipated 25 decrease in workload associated with the Part 74 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

45 1 rulemaking and the proposed cybersecurity rule for 2 fuel facilities. Next slide, please.

3 In Fiscal Year '19 if you've read the 4 proposed fuel rule you'll see that the annual fee is 5 anticipated to decrease on average approximately 7.4 6 percent across the fuel facilities fee class for the 7 seven operating facilities which combined reflects a 8 10.5 percent reduction, overall reduction in 9 collected annual fees.

10 The decrease in annual fees is a result 11 of total budgeted fee class resources decreasing by 12 $5.2 million or 15 percent in comparison to Fiscal 13 Year '18.

14 A total of 18 FTE were cut from the fuel 15 facilities budget overall which translates to 15 FTE 16 decrease within the fee class.

17 The estimate of Part 170 collections 18 declined $2 million or 21.7 percent as a result of 19 the expected termination of MOX Fuel Fabrication 20 Facility construction authorization and license 21 application and the anticipated completion of 22 Honeywell's license renewal while plant operations 23 are idle.

24 Some of the decrease in Part 170 25 collections is offset by increased work for NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

46 1 Westinghouse associated with emergency preparedness 2 exercise, confirmatory order items and its license 3 renewal.

4 As discussed during last year's fee rule 5 public meeting the staff conducted a number of 6 public meetings over the past couple of years where 7 alternative methods for calculating annual fees were 8 explored.

9 The staff received mixed feedback as to 10 whether the NRC should continue working on changes 11 to the methodology for calculating fees.

12 As reflected in the '19 fee rule the --

13 or the proposed '19 fee rule the NRC made the 14 decision to continue the existing methodology for 15 calculating annual fees for fuel facilities and 16 continue ongoing efforts to identify potential 17 reductions of budgeted resources.

18 Going forward we're focusing efforts to 19 align the agency's program of work in the fuel 20 facilities area to projected workloads and continue 21 to risk-inform the regulatory framework for these 22 activities.

23 In the coming months we will be sharing 24 opportunities for the public and industry to engage 25 us on our efforts in this area with a goal of NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

47 1 identifying and realizing additional efficiencies in 2 the licensing and oversight of fuel facilities while 3 maintaining adequate protection consistent with our 4 principles of good regulation.

5 Okay, so now I'll turn over the 6 discussion to nuclear material users business line.

7 MR. WILLIAMS: Thanks, Mike. Good 8 afternoon. My name is Kevin Williams. I'm the 9 deputy director of the Materials Safety, Security, 10 State and Tribal Programs in the Division of -- I 11 said that already, sorry.

12 I will cover the activities and budget 13 in the NMU business line and how these activities 14 impact the fees for materials users fee class.

15 This slide shows the 11 product lines 16 within the NMU business line and which products are 17 mission direct and mission indirect, both of which 18 contribute to the fees that are collected.

19 It is important to note that the nuclear 20 materials users business line is a small portion of 21 the NRC budget, approximately 7 percent.

22 And materials users pay approximately 3 23 percent of the fees recovered by the NRC.

24 As we would expect, excluding the 25 resources that are part of the fee base a large NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

48 1 portion, specifically 50 percent of the business 2 line resources are mission direct and that 3 represents $30.2 million including 143 FTE and $3.9 4 million in contract support resources.

5 And they fund the NRC's core activities 6 including licensing, oversight, rulemaking, research 7 activities. The largest portion of these mission 8 direct activities are inspection and licensing.

9 I would like to note that while generic 10 homeland security and international activities which 11 comprise approximately 32 percent of our activities 12 are including 29 FTE and $13.9 million in contract 13 support resources which are vitally important to the 14 mission of the business line, these resources are 15 excluded from the fee base which means these items 16 are not part of the 90 percent that the NRC recovers 17 in fees.

18 We complete these activities in 19 collaboration with a broad range of partners which 20 are the four NRC regions, the Office of Nuclear 21 Security and Incident Response, the Office of the 22 General Counsel, the Office of Enforcement and the 23 Office of International Programs.

24 Nuclear material users business line 25 activities include licensing, oversight including NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

49 1 inspection and enforcement, security activities 2 including oversight of source security through 3 inspection and licensing activities such as pre-4 licensing inspections to ensure sources are used for 5 their intended purpose and operation of the 6 integrated source management portfolio which 7 includes the national registry to track radioactive 8 sources of concern.

9 Rulemaking and implementation of state, 10 tribal and federal liaison programs which includes 11 oversight of agreement states and a government 12 communication and coordination and implementation of 13 the tribal policy statement.

14 It is also important to note that 15 agreement state activities are in the fee relief 16 category which means while they are part of our 17 budget the resources associated with oversight of 18 agreement states is not collected through fees.

19 Agreement states are those states which 20 have signed an agreement with the NRC in accordance 21 with Section 274(b) of the Atomic Energy Act of 1954 22 as amended which authorizes the NRC to discontinue 23 and the state to assume regulatory authority over 24 certain materials cited in the Atomic Energy Act.

25 The most recent agreement is with the NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

50 1 state of Wyoming which was signed on September 25, 2 2018 and became effective on September 30, 2018.

3 The state of Vermont has indicated 4 interest in becoming an agreement state and is 5 undergoing the process of submitting an application 6 to become an agreement state.

7 If the Commission approves this 8 agreement the total number of agreement states would 9 be 39 by Fiscal Year 2020.

10 Some of the major activities in the 11 nuclear materials users business line for Fiscal 12 Year '19 and the changes in our budget in this area 13 include the support and completion of approximately 14 2,000 material licensing actions which include new 15 applications, amendments, renewals of applications 16 and license terminations.

17 While the number of licensing actions 18 has declined slightly over the last few years there 19 was a slight increase in the budget of Fiscal Year 20 '19 to support guidance on emerging medical 21 technologies.

22 We also talk about the completion of 23 approximately 900 routine health and safety and 24 security inspections as well as reciprocity and 25 reactor inspections, inspections for certain general NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

51 1 licenses.

2 The number of inspections has remained 3 fairly stable. However, there was a slight decrease 4 in budgeted resources in Fiscal Year '19 to adjust 5 for historical utilization.

6 We also talk about support and 7 coordination for liaison for homeland security 8 regulatory initiatives and the development and 9 implementation of the integrated source management 10 portfolio. And this area remains stable for Fiscal 11 Year '19.

12 We talk about rulemaking activities in 13 Fiscal Year '19 such as Part 34 on radiographic 14 operations, Part 30 to address products that contain 15 radioactive material incident to production, and an 16 integrated source security rule or changes to Part 17 37.

18 Resources in this area increase in 19 Fiscal Year '19 due to an expected increase in 20 workload associated with the integrated source 21 security rule.

22 We also oversee and support the 23 agreement states' regulation of approximately 17,000 24 specific and 150,000 general licensees, and conduct 25 9 integrated materials performance and evaluation NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

52 1 program reviews.

2 We also plan to review an agreement 3 state application for the state of Vermont in Fiscal 4 Year '19.

5 Resources in this area declined in 6 Fiscal Year '19 due to historical utilization and 7 the completion of the Wyoming agreement state 8 application at the year end of Fiscal Year '18.

9 We're also working to implement the 10 agency's tribal policy statement including outreach, 11 guidance development, staff training on tribal 12 issues and resources in this area are expected to 13 decline in Fiscal Year '19.

14 We talk about how the budget is 15 developed and we look at our workload forecasting.

16 And when we do this in development with the business 17 line itself it is based on the number of materials 18 licensees expected -- we look at the expected number 19 of licensing actions and inspections, taking into 20 account the number of agreement states and any new 21 regulations that may require licensees or 22 inspection.

23 And we communicate with our stakeholders 24 and we look at an analysis of historical data based 25 on utilization and expenditures such as reviewing NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

53 1 the level of resources associated with past efforts 2 and reviewing historical resource utilization.

3 We also evaluate the complexity and type 4 of work we expect to be working on and any trends we 5 anticipate that will increase or decrease the 6 workload and accomplishing our safety, security and 7 outreach goals.

8 While the number of licensees has 9 remained fairly stable with a slight measured 10 decrease over time the area where we need additional 11 information from our stakeholders is in the area of 12 new technologies, specifically medical or industrial 13 type technologies.

14 So this slide shows how the enacted 15 budget changed for nuclear materials from Fiscal 16 Year 2018 to 2019.

17 Overall in Fiscal Year 2019 there is a 18 decrease of approximately $1.3 million including a 19 reduction of eight FTE in our enacted budget 20 compared with Fiscal Year 2018.

21 Resources decrease within international 22 activities, state and tribal and federal programs 23 product lines to align with historical resource 24 utilization.

25 Resources in the rulemaking product line NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

54 1 increased as a result of increase support for the 2 integrated source security rulemaking. Resources 3 decreased within the oversight and mission support 4 product lines largely as a result as Maureen talked, 5 re-basing the line of agency resources to align with 6 utilization.

7 Resources associated with licensing 8 increased slightly based on a realignment of 9 resources and to support guidance development for 10 emerging medical technologies.

11 In the proposed Fiscal Year 2019 fee 12 rule you will see that compared to Fiscal Year 2018 13 the Fiscal Year 2019 annual fees has decreased for 14 some and increased for others.

15 Annual fees are assessed from all 16 licensees. The cost which comprise of budget not 17 collected through hourly or the flat fees is divided 18 by all of the fee categories. A matrix is used to 19 assign portions of annual fees fairly and equitably 20 through the vastly different fee categories based on 21 the level of effort needed for licensing and 22 oversight of a particular category.

23 The NRC proposed to both increase and 24 decrease annual fees for licensees in this fee class 25 in Fiscal Year 2019 due to the results of the NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

55 1 biennial review of fees and a reallocation of budget 2 resources from the fee relief category to the fee 3 class.

4 The majority of this reallocation was 5 from agreement states which is a fee relief category 6 to licensing which is a product for which we do 7 collect fees.

8 In taking this action we are ensuring 9 that fees are fair and equitable amongst all of our 10 stakeholders.

11 There are a number of increases and 12 decreases in this area, most notably in the fee 13 class as we talked about, as well as the 14 introduction of two new subcategories and a new 15 category.

16 These changes are a result of the 17 reallocation of budgetary resources and a biennial 18 review of the level of effort required to oversee 19 different fee categories.

20 The Part 170 fees are the standard 21 applications fee paid by new material licensee's 22 application review and flat fees.

23 The fees are based on the average time 24 spent on new application reviews for material 25 licensees.

NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

56 1 I'll now turn it over to John McKirgan.

2 MR. MCKIRGAN: Great. Thank you, Kevin.

3 Good afternoon, everyone. I'm John McKirgan. I'm 4 chief of the Spent Fuel Licensing Branch in the 5 Division of Spent Fuel Management in the Office of 6 Nuclear Materials Safety and Safeguards. Good to 7 see you all.

8 The table on this slide shows the 9 product lines within the business line which is 10 composed of mission direct resources and mission 11 indirect resources and some resources which are 12 excluded from the fee base.

13 The majority of the business line 14 resources are mission direct which are approximately 15 82 percent of the spent fuel storage and 16 transportation business line budget including 83 FTE 17 and $2.7 million in contract support dollars.

18 These resources fund the NRC's core 19 activities including licensing, oversight, 20 rulemaking and research.

21 Mission indirect resources make up about 22 15 percent of the business line budget including 15 23 FTE and approximately $600,000 in contract support 24 and travel costs.

25 These resources support the execution of NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

57 1 activities such as supervisory, non-supervisory 2 staff and travel. They include such staff as 3 supervisors and administrative assistants.

4 I would like to note that while 5 international activities are important to the spent 6 fuel storage and transportation business line these 7 resources make up only 3 percent of the business 8 line budget and are excluded from the fee base which 9 means they are not items that we collected under the 10 90 percent fees that NRC is required to collect.

11 Next slide.

12 The spent fuel storage and 13 transportation business line is responsible for 14 ensuring the safe and secure storage of spent 15 nuclear fuel and the safe transport of radioactive 16 materials.

17 This slide lists some of the key 18 activities in the business line. Processing 19 licensing applications is a significant part of the 20 work carried out.

21 Licensing activities include conducting 22 safety, security and environmental reviews of spent 23 nuclear fuel storage casks and independent spent 24 fuel storage installation license applications as 25 well as performing safety and security reviews of NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

58 1 radioactive material transportation packages.

2 This licensing work also includes 3 reviewing renewal applications for storage and 4 transportation certificates and facility license 5 renewal applications.

6 A significant effort is underway in the 7 business line is to review two consolidated interim 8 storage facility license applications. They're 9 listed separately there in the bullet.

10 In FY '19 both of these applications 11 reviews are proceeding full bore.

12 The business line also leads oversight 13 activities with safety and security inspection 14 efforts conducted by regional and headquarters 15 staff.

16 Rulemaking is another important part of 17 the business line. The storage cask certificates 18 are completed through a rulemaking process so this 19 is a critical step in that process. And then there 20 are also rulemaking efforts in transportation 21 including revisions to the regulations under 10 CFR 22 Part 71 to harmonize with the standards of the 23 International Atomic Energy Agency.

24 And finally we have a few research 25 activities underway as well. Next slide, please.

NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

59 1 So our first step in developing the 2 spent fuel storage and transportation business line 3 budget is to forecast the workload. This is based 4 on the number of facilities and certificates we have 5 under our purview, also letters of intent that we 6 might receive from upcoming license applications, 7 and we do this through continuous communication with 8 our licensees and our vendors.

9 In developing our budget we look at the 10 type of work that would be before us to review.

11 Referring back to the previous slide where I spoke 12 about licensing where we have a safety review and an 13 environmental review for many of the licensing 14 actions. So we ensure that we have adequate 15 resources to support these activities.

16 Some of the applications also have a 17 security component that we factor into our 18 forecasting.

19 The cost of completing our licensing 20 reviews varies depending on the level of complexity 21 that might be before us, whether it is for a new 22 facility or for a license renewal which require 23 different levels of effort and different resources.

24 In addition, we consider the potential 25 need for hearing related resources based on our best NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

60 1 estimate of the hearing requests that we may get 2 based on the licensing actions before us.

3 We try to gauge that based on the level 4 of public interest of a particular project. The 5 resources associated with those hearings are 6 budgeted based on historical figures and what it has 7 cost to support hearings in the past.

8 And the way we estimate our resources is 9 also based on historical information such as 10 reviewing the level of resources associated with 11 past efforts and reviewing historical resource 12 utilization.

13 The resulting information functions as a 14 benchmark from which resources would change. Next 15 slide, please.

16 So this slide shows how the enacted 17 budget changed for the spent fuel storage and 18 transportation business line from Fiscal Year 2018 19 to Fiscal Year 2019.

20 Overall there was a decrease of $1.8 21 million including a reduction of three FTE in our 22 enacted budget as compared to 2018. Next slide, 23 please.

24 The spent fuel storage and 25 transportation business line budget feeds into two NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

61 1 fee classes, the spent fuel storage reactor 2 decommissioning fee class which the decommissioning 3 and low-level waste business line also shares, and 4 you'll hear more about that in a moment, and then 5 the transportation fee class.

6 So the question is where are the vectors 7 for our budget and why are the annual fees changing.

8 Compared to FY 2018 the FY 2019 budgeted 9 resources for spent fuel storage and reactor 10 decommissioning increased due to an increase in the 11 number of licensing actions associated with 12 operating reactors undergoing decommissioning, the 13 ongoing licensing reviews for the two consolidated 14 interim storage facility license applications 15 including the development of environmental impact 16 statements, and the independent spent fuel storage 17 installation license renewals for Three Mile Island 18 2, Trojan and Rancho Seco, and the associated 19 environmental assessments.

20 In the Fiscal Year 2019 if you've read 21 the proposed fee rule you'll see that the annual 22 fees are anticipated to decrease approximately 17.7 23 percent across the spent fuel storage reactor 24 decommissioning fee class for the 122 licensees.

25 The required annual fee recovery amount NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

62 1 is divided equally among the 122 licensees we have.

2 The 10 CFR Part 170 estimated billings 3 for FY 2019 are increasing due to increased 4 requested licensing actions and reactor 5 decommissioning, a resumption of the licensing work 6 on the Interim Storage Partners consolidated interim 7 storage facility, increasing work on Holtec 8 International's consolidated interim storage 9 facility, and the continued activities on the 10 storage license renewals. Next slide, please.

11 So next I'll discuss the change to the 12 transportation fees. In FY 2019 the total budgeted 13 resources for generic transportation activities 14 increased slightly.

15 Now in this case the Department of 16 Energy is the only transportation licensee that's 17 subject to an annual fee.

18 Consistent with the policy established 19 in the NRC's FY 2006 final fee rule the NRC recovers 20 generic transportation costs unrelated to DOE by 21 including those costs in the annual fees for 22 licensees in the fee classes which use those 23 transportation packages.

24 The NRC continues to assess a separate 25 annual fee under 171.16 the fee category 18(a) for NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

63 1 DOE transportation activities.

2 The NRC assesses an annual fee to DOE 3 based on the 10 CFR Part 71 certificates of 4 compliance it holds.

5 As Maureen mentioned, at the time of the 6 proposed fee rule that number was projected to go 7 up. Since that time one of those certificates of 8 compliance has expired. DOE chose not to renew it 9 and we'll make those reflection on those changes as 10 we go to the final fee rule.

11 So with respect to the 10 CFR Part 170 12 estimated billings we're anticipated an increase to 13 the expected -- I'm sorry. We are anticipating an 14 increase due to the expected increase in case work 15 on transportation packages including the review of 16 new applications.

17 So next I'll turn it over to Bo Pham and 18 he'll be discussing the decommissioning and low-19 level waste business line.

20 MR. PHAM: Thank you. Bear with me.

21 We're almost there.

22 So good afternoon. My name is Bo Pham 23 and I'm the deputy director for the Division of 24 Decommissioning, Uranium Recovery and Waste Programs 25 in the Office of Nuclear Materials, Safety and NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

64 1 Safeguards. Next slide, please.

2 The table in this slide shows the 3 product lines within decommissioning and low-level 4 waste business line which is composed of mission 5 direct resources, mission indirect resources and 6 some resources which are excluded from the fee base.

7 As you would expect most of the business 8 line resources are mission direct and they fund the 9 NRC's core activities including licensing, 10 oversight, training, rulemaking and research.

11 Mission indirect resources support the 12 execution of activities such as supervisory and non-13 supervisory staff and travel.

14 I note that while international 15 activities are important to the business line these 16 resources are excluded from the fee base which means 17 that these are not part of the 90 percent that the 18 NRC recovers in fees.

19 In addition, waste incidental to 20 reprocessing is a DOE funded activity and is also 21 excluded from the fee base. Next slide, please.

22 The business line provides licensing and 23 oversight for the decommissioning of complex 24 materials facilities, fuel cycle facilities, uranium 25 recovery facilities, decommissioning power reactors NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

65 1 and research and test reactors with the ultimate 2 goal of license termination for each of these.

3 In addition, the business line provides 4 licensing and oversight for uranium recovery 5 facilities that are licensed to operate, the 6 national low-level waste program and the military 7 and non-military radium programs.

8 These programmatic areas drive the 9 budgetary resources necessary to implement the NRC's 10 strategic goals, objectives and strategies.

11 Some of the major activities that the 12 business conducts includes the following -

13 decommissioning of 3 research reactors, licensing 14 reviews and decommissioning activities for 21 power 15 reactors with Humboldt Bay, Zion 1 and 2, and La 16 Crosse nearing license termination, oversight of the 17 military and non-military radium program, licensing 18 and oversight of 12 complex materials sites 19 undergoing decommissioning and depleted uranium 20 sites, licensing and oversight of 5 private uranium 21 mill sites undergoing decommissioning and 36 22 decommissioned uranium mill disposal and processing 23 facilities under long-term care with DOE, supporting 24 the national low-level waste program including 25 developing guidance and providing support for the NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

66 1 integrated materials performance evaluation program 2 evaluations in the low-level waste area.

3 We also support the rulemaking center of 4 expertise to coordinate rulemaking activities 5 related to the business line including rule 6 development and associated guidance development.

7 And we also conduct research activities 8 to support the application of new technologies at 9 complex sites and analytical tools used in 10 decommissioning reviews. Next slide, please.

11 Workload forecasting is the first thing 12 we do when developing the business line budget. It 13 is based on continuous communications with our 14 licensees and potential applicants, and based on 15 letters of intent for the upcoming license 16 applications.

17 In developing our budget we estimate the 18 necessary resources needed to complete licensing 19 activities such as safety and environmental reviews 20 as well as oversight through inspection activities 21 based on where in the licensing or decommissioning 22 process each facility currently stands.

23 The cost of completing our licensing 24 reviews and oversight activities varies depending on 25 the level of complexity that might be before us.

NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

67 1 Whether it is for a power reactor in active 2 decommissioning or safe storage each one requires a 3 different level of effort and resources.

4 We also exemption our resources based on 5 historical information by reviewing the level of 6 resource budgeted and utilized for similar past 7 efforts.

8 The resulting information functions as a 9 benchmark during budget development. And in 10 addition we also budget for hearings associated with 11 licensing actions that we expect. Next slide, 12 please.

13 This slide shows how the enacted budget 14 changed for the business line from Fiscal Year 2018 15 to 2019.

16 In 2019 overall resources decreased by 17 $2.7 million including a reduction of 12 FTE 18 compared to 2018.

19 The decreases were primarily in the 20 licensing product line to reflect the expected 21 decline in workload stemming from Wyoming's 22 anticipated transition to an agreement state status 23 during the late Fiscal Year 2018 time frame as well 24 as decreases in non-military radium program.

25 The agreement with the state of Wyoming NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

68 1 was signed on September 25, 2018 and became 2 effective September 30. I note that approximately 3 70 percent of NRC licensed uranium recovery 4 facilities are located in the state of Wyoming.

5 These decreases are partially offset by 6 increases in international activities and support 7 for various rulemaking activities including the 8 greater-than-Class-C and transuranic waste 9 rulemaking. Next slide, please.

10 This slide summarizes the changes to the 11 uranium recovery fee annual class fees. As a result 12 of Wyoming becoming an agreement state there remain 13 only one NRC licensee in the uranium recovery fee 14 class.

15 In order to stabilize the annual fees 16 that would impact this sole licensee the Commission 17 approved expanding the fee relief category to 18 include this fee class.

19 And in addition for Part 170 there's an 20 estimated increase in billings due to the UMTRCA 21 sites for DOE. And with that I'll turn it over to 22 Stephanie.

23 MS. COFFIN: Thank you, Bo. So I just 24 want to take a moment to pause so you heard from all 25 of our programmatic business lines and you heard NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

69 1 maybe a repetitive theme about how we do our 2 workload forecasting and how critical it is to 3 realistic budget formulation. They all do it, 4 approach it in the same manner.

5 Your input particularly in the product 6 lines of licensing and oversight are critical to us.

7 And that dialogue should be continuous. It's not 8 one and done, but continuous throughout the two 9 years we're in the formulation cycle. Please, 10 please talk to us when you have especially major 11 changes that have resource implications. That 12 really helps us do our job better.

13 All right, so I want to talk about the 14 corporate support. We treat this as a business 15 line. It is a little bit different in that it's 16 driven by federal law and executive orders and that 17 sort of thing and it's kind of secondary to being 18 driven by what we just heard from the program 19 business lines.

20 So up there are the product lines and 21 they of course are very different too. So corporate 22 support just to get us all on the same page, these 23 are centrally managed activities that support the 24 programs.

25 Maureen mentioned them briefly. I'll NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

70 1 run through them.

2 Acquisitions. This is our contract 3 operations. Administrative services. So this is 4 where our rent, our utilities, our building 5 maintenance is captured.

6 Financial management. Obviously we have 7 financial systems and expertise to maintain them and 8 use them.

9 Human resource management. Those are 10 our people who hire people and work out benefits.

11 Personnel changes.

12 Information technology and information 13 management. So this is our folks that have our 14 ADAMS and our websites and do our cybersecurity and 15 provide our computers and our phones and all the 16 wonderful infrastructure that you see in today's 17 meeting.

18 We have outreach, policy support and 19 training product lines too. This is where you're 20 going to find our Commission operations, our Office 21 of Congressional Affairs, our Office of Public 22 Affairs are embedded in those product lines.

23 On average since 1995 corporate support 24 has made up about 32 percent of our budget. Next 25 slide, please.

NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

71 1 So similar to what you heard from the 2 previous business lines this is our table showing 3 you the changes from '19 from '18. And the other 4 thing I want to point out on this table is you can 5 see the vast majority of our resources are in 6 administrative services. That's our rent and 7 utilities and building maintenance and information 8 technology and information management. That's 9 probably pretty intuitive to many of you to see it 10 that way.

11 We did have an overall decrease from '18 12 to '19 of $3.4 million. That is mostly driven by 13 the reductions that we've been working on in terms 14 of reducing our real estate footprint. But it also 15 reflects a lot of investment in more efficient 16 building maintenance technologies to make us run a 17 little bit -- have our bills a little bit smaller.

18 Next slide, please.

19 So the impact on fees. So corporate 20 support is embedded in all of your fees, both in 21 Part 170 and 171 and it's done through fully costing 22 out the FTE rates.

23 We're very mindful of our overhead costs 24 and so we're always pressing for efficiencies in 25 this area.

NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

72 1 Our near term focus does continue to be 2 on our real estate footprint and making smart 3 investments in IT and IM that we hope will pay off 4 in efficiencies in the future.

5 And so I'm going to close there and 6 we're going to move to Q&A which is going to be 7 facilitated by Richard, right?

8 FACILITATOR RIVERA-LUGO: Yes, that is 9 correct. So thank you to all the panelists for 10 covering the first topics and the bulk of the 11 meeting.

12 With this we're going to initiate our 13 Q&A session. We have allotted 15 minutes for the 14 Q&As.

15 We're going to start with the folks in 16 the room. Any questions in here. In the meantime 17 if the participants on the phone have any questions 18 please dial *1 and record your name and Sandy will 19 take care of the queue from those questions on the 20 line.

21 While that is happening in the 22 background are there any questions in the room?

23 Please approach the microphones on either side of 24 the conference room and remember to state your name 25 and affiliation clearly so we can capture that on NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

73 1 the record.

2 MR. BUTLER: My name is John Butler with 3 NEI and I'd like to start off first by thanking 4 Maureen once again for conducting this meeting.

5 This is always very informative to me and I think 6 very welcomed by everyone.

7 MS. WYLIE: Thanks very much.

8 MR. BUTLER: I am going to start off 9 with like a personal request if I could. And if I 10 could get you to go to slide -- I apologize. Slide 11 15.

12 I have been looking at budgets and 13 looking at the proposed fee rules and the work 14 papers for a number of years and I am slowly getting 15 to understand it a little bit more, but I still am 16 challenged. This is the one, yes.

17 So I'm challenged in getting out the 18 information that I need from the work papers. One 19 of the things that I think that would help me is if 20 we could add -- not change what's there now, but add 21 something that provided a little bit more detail for 22 the different business lines on what the budget is 23 going to cover and specifically what has changed 24 from the prior year along the business line 25 activities shown on this slide.

NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

74 1 So that it would identify similar to 2 what is done in the CBJ to identify what specific 3 activities the budget is intended to cover. And 4 these may be specific license applications, or 5 whatever the activity is. But give a little bit 6 more detail than the current breakdown that's in the 7 work papers.

8 MS. WYLIE: So I think you will see in 9 the FY '20 congressional budget justification when 10 it rolls out that we are trying to give some 11 additional information.

12 And we'll make every effort to make that 13 change narrative also available in the work papers.

14 MR. BUTLER: That would be excellent.

15 MS. WYLIE: I can't guarantee we'll make 16 you happy, but we hear your message and we'll try to 17 include that.

18 MR. BUTLER: Well, transparency is like 19 perfection, you always try to achieve it but you 20 never quite reach it.

21 MS. WYLIE: Or you can go too far and 22 what looks like transparency is just a large data 23 dump that's meaningless. So it's all in the point 24 of view.

25 MR. BUTLER: May I continue?

NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

75 1 MS. WYLIE: Sure, please.

2 MR. BUTLER: I ask you to go to slide 3 23.

4 MS. WYLIE: Oh, this is my favorite one.

5 MR. BUTLER: My favorite too. Probably 6 not too surprising there's some interest in the 7 increase in the annual fee for operating plants.

8 So we want to make sure that we 9 understand that as well as we can.

10 The reasons for the increase here I 11 think kind of -- I think it was mentioned in the 12 discussion. I'm not sure if it was Russell or Jane 13 that the main reason here appears to be that there's 14 been a significant drop in the Part 170 collections.

15 So I want to understand a little bit 16 better the budget formulation process. I mean, 17 there obviously have to be some projections of the 18 Part 170 collections going forward.

19 There's been a decrease in Part 170 20 collections for the last several years. This year 21 we saw a 10 percent decrease. Last previous year 22 was like a 6 percent decrease and prior to that like 23 an 11 percent decrease. So that is a continuing 24 trend.

25 We already know that there's like a NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

76 1 dozen plants that have already stated their 2 intentions to close down in the next seven years.

3 So we can anticipate there's going to be a 4 continuing reduction in the Part 170 collections.

5 I'd like to understand better how that 6 is factored into the overall budget formulation 7 process.

8 MS. WYLIE: So, we recognize very 9 significantly that the number of reactors that are 10 going to be closing in the future needs to have a 11 significant material impact on our budget.

12 So we have been working very hard to 13 understand what the difference would be not just for 14 the direct resources, say the four and a half FTE 15 associated with inspection for each plant, but what 16 the larger impact to both the mission direct and 17 mission indirect components of operating reactors in 18 that business line.

19 When the FY '20 budget rolls out you'll 20 see in that that we've taken our first steps in that 21 area. And we continue to affect budget formulation 22 going forward to continually refine that 23 information.

24 So, one of the things that we struggle 25 with is the cost associated with FTE. And so we are NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

77 1 effectively trying to be more risk-informed in how 2 we actually do the budget projection.

3 If you look solely at historical 4 information some activity might take you 10 FTE.

5 Well, can we assume there will be additional 6 efficiencies and perhaps budget nine FTE for that.

7 So there's that effort. There's do we 8 need to have a construct that says whenever we 9 eliminate a plant there's some -- at least at a 10 starting point a consistent projection of what the 11 mission indirect reduction would be. We're getting 12 to some of that.

13 And then as we go through the final 14 stages of planning for the NRR-NRO merger we're also 15 going to take some efficiencies during that.

16 So you should continue to see not just a 17 decline in Part 170 but a significant effort on our 18 part to reduce our programmatic overhead. So also a 19 reduction in mission indirect.

20 And that should help with -- it doesn't 21 just flow from Part 170 to Part 171, but that the 22 entire budget shrinks. And we continue to work on 23 that.

24 MR. BUTLER: Thank you.

25 FACILITATOR RIVERA-LUGO: With that let NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

78 1 me proceed to see if there are any questions from 2 the phone lines.

3 OPERATOR: Yes, we have a question from 4 Eric Jebsen. Your line is open.

5 MR. JEBSEN: Thank you for taking my 6 question. Related to the question just asked about 7 the estimated decreases or the reasons for the 8 increases in the Part 170 decreases -- or in 171 9 decreases and 170, could you explain a little bit 10 more, try to tie the 6 percent PMRI, the surcharge 11 for lack of a better term. What fraction that might 12 have been in 170? Is that 1 to 1 to 171? Just 13 address how that 6 percent factors in. Thank you.

14 MS. WYLIE: All right. While Stephanie 15 is looking up the exact number because I know we 16 have that in the folder -- the exact estimate.

17 So, let me talk for a minute about how -

18 - so the total amount reduced is $9 million. Why is 19 that important? Because it also reflects how over 20 the last couple of cycles we've changed how we do 21 our estimating for the proposed fee rule.

22 Until two years ago we were on a very 23 different cycle in timing for the proposed fee rule.

24 We were waiting not just for an appropriation, but 25 in order to have a larger number of quarters of NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

79 1 actual data from our workforce that charges to Part 2 170 CACs and so that was delaying when we could get 3 the proposed fee rule out.

4 So when we determined that in order to 5 meet industry's desires we would need to come out 6 more quickly that meant that the estimations in the 7 proposed fee rule would be less precise.

8 So we use one quarter of actual data, 9 the very first quarter, and three quarters of 10 estimated data.

11 So the very first quarter of 2019 shows 12 a very radical change from just a straight 6 percent 13 which we could calculate to just those hours that 14 project managers and resident inspectors charged to 15 overhead in the first quarter.

16 So the $9 million that we've estimated 17 as the change is actually the absolute high water 18 mark.

19 We believe that as we progress toward 20 the final fee rule we will get more quarters of 21 actual data. So how many overhead hours those 22 people actually charge.

23 So $9 million is the largest amount that 24 could be foregone. We think that the total will be 25 less than that.

NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

80 1 So it's a challenge for us. In order to 2 come out more quickly we have to do -- we have to 3 take more risk in estimating.

4 We think that you would rather know the 5 largest amount you could be charged and so we've 6 skewed our estimating in that direction.

7 We would be happy to take feedback on 8 that during public comment. But that is a 9 consequence of moving our proposed fee rule so early 10 in the fiscal year.

11 For us we think it's worthwhile because 12 again we give you a worst case scenario, your annual 13 fee will be no greater than this, but we believe 14 that by the time we get the final fee rule out the 15 annual fee will go down slightly because we'll have 16 better data on the PM resident inspector overhead 17 specifically.

18 So it will be less than $9 million 19 reduction. We just don't know what the number will 20 be.

21 FACILITATOR RIVERA-LUGO: Are there any 22 other questions from the phone lines?

23 OPERATOR: Not at this time, sir.

24 FACILITATOR RIVERA-LUGO: Any other 25 questions from the participants in the room?

NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

81 1 MR. MAUER: Hi, Andrew Mauer with NEI.

2 Again I wanted to appreciate the meeting and the 3 good discussion here.

4 To follow up on John Butler's remarks 5 around transparency there were -- as we go through 6 the work papers it would be nice if we had a key for 7 some of the things in here as far as what they 8 meant.

9 But maybe a couple of specific questions 10 if we have the right folks here today, and if we 11 don't that's fine.

12 Within the products for the new reactors 13 we see something called Part 50 which it says was 14 not there in '18. It's there in '19 both in 15 licensing and oversight. And I was wondering if 16 someone can share what that is.

17 MS. WYLIE: I think we're going to need 18 to provide that to you in the meeting summary 19 afterward. I don't think we have somebody here that 20 can answer that.

21 MR. MAUER: Okay.

22 MS. WYLIE: Do I? I don't think so.

23 No. So we commit to putting that out to you as a 24 part of the meeting summary.

25 MR. MAUER: Okay. In the context of the NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

82 1 different presentations that were up, the event 2 response, can someone elaborate on event response 3 and sort of how that relates. What's included in 4 event response is the broader question?

5 MS. COFFIN: So that's largely like our 6 operations center here. So we run a 24/7 operations 7 center here to monitor activities across the world 8 and be ready to respond to an event. And all of the 9 regions have smaller event response capabilities too 10 so that the agency is prepared to respond to any 11 kind of event.

12 MR. MAUER: So all of the event response 13 in the budget is associated with that?

14 MS. COFFIN: There's probably other 15 aspects to it, but I would think that's the largest 16 portion of it. As we follow up the meeting summary 17 if there's more to put in there we can add it.

18 Actually, we have -- other people have 19 worked in that area.

20 MR. MARSHALL: Sorry, Jane Marshall, 21 NRC. There is more in the event response than just 22 the headquarters operations officers and operation 23 centers. I don't know what it is offhand. There is 24 a piece of materials as well, there's operating 25 reactors in there.

NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

83 1 MS. COFFIN: But that's in event 2 response.

3 MR. MARSHALL: Yes, it's event response.

4 MS. WYLIE: So, but there is a very 5 specific bifurcation -- I'll let you in just a 6 minute -- between what we do that's funded by 7 generic homeland security and what is funded by fee 8 dollars, fee-based resources.

9 And so better to give you an answer that 10 sort of charts that out by business line. Kevin, 11 did you want to add something?

12 MR. WILLIAMS: So the piece I wanted to 13 add is that we also have on the materials side if 14 there was something in regards to a source, if there 15 was something that was related to fuel facility type 16 response effort we do provide that for our regions 17 in order to be able to respond to those type of 18 activities.

19 MS. WYLIE: But it includes things like 20 time spent planning on site-specific events. So let 21 us get you a specific definition.

22 MR. MAUER: All right, that would be 23 good. Thanks.

24 FACILITATOR RIVERA-LUGO: Any other 25 questions from participants in the phone line?

NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

84 1 OPERATOR: No, sir.

2 FACILITATOR RIVERA-LUGO: Are there any 3 other questions from the participants in the room at 4 this point? With no questions at this point we're 5 going to take a quick 10-minute break.

6 So it's now 2:30 -- let's round it up to 7 2:35. Let's please be back in the room at 2:45.

8 (Whereupon, the above-entitled matter 9 went off the record at 2:37 p.m. and resumed at 2:46 10 p.m.)

11 MS. WYLIE: All right, if everybody on 12 the phone is ready to go we're going to get started 13 with the second half of our program.

14 Michele Kaplan who will be -- who is for 15 the next month or so our head, the team lead of our 16 license fee policy team. We want to thank Michele 17 for all of her work on fees. All of this progress 18 we contribute to you and your team. It's been a 19 great experience.

20 Michele is going to transition to be our 21 funds control team leader by mid-March. So this is 22 your last chance to be a star.

23 MS. KAPLAN: Thank you, Maureen.

24 MS. WYLIE: In this area. Absolutely.

25 MS. KAPLAN: All right. Well, good NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

85 1 afternoon, everyone. I'm Michele Kaplan, license 2 fee policy team leader.

3 And I wanted to start out -- next slide 4 -- with our statutory and regulatory framework.

5 Maureen pretty much covered this during her 6 presentation so I don't think I'm going to go over 7 this particular slide.

8 The next slide though is kind of our 9 timeline for producing the fee rule. And so as 10 Maureen said we are appropriation early this year.

11 We got it before the actual year started.

12 So at the top where you see the Capitol 13 we have our -- it says congressional budget 14 justification or appropriations. So this year we 15 did get it in September.

16 And then if you move right we do our 17 budgetary analysis and the allocation of the budget 18 to the fee classes between August and November.

19 And then December and January if you 20 move down we prepare the Federal Register notice.

21 And then this year thankfully we were 22 able to publish by the end of January with only two 23 days later than our actual schedule. So we were 24 very happy about that because we want to be as 25 timely as we can in producing the fee rule for NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

86 1 everyone, for our licensees and stakeholders so that 2 they can use the information to plan their year.

3 And then we have our 90-day comment 4 period. We have our public meeting today.

5 And then we start on the Federal 6 Register notice for our final fee rule. And we hope 7 to publish at the end of May.

8 And then 60 days later it becomes 9 effective in July and it gives us enough time to be 10 able to collect all the fees that we need to by the 11 end of the year. All right, next slide.

12 So this is just kind of an overarching 13 view of our calculation to get down to Part 171 fees 14 and Part 170 fees to be collected.

15 So at the top in the top circle you can 16 see that we have our total budget authority as 17 Maureen stated of $911 million. And then we exclude 18 certain amounts for advanced reactors, the 19 international activities, generic homeland security, 20 and then the IG services for the Defense Nuclear 21 Facilities Safety Board.

22 And that totaled $43.4 million. So we 23 deduct that from the total. And that's our fee 24 recovery rate -- our balance, I'm sorry, that's the 25 balance.

NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

87 1 And then we apply the fee recovery rate 2 of 90 percent. And that's the total amount to be 3 recovered for 2019 is $780.8 million.

4 And then from there we have little 5 timing adjustments for our billing. And this year 6 we added in $1.1 million to get our adjusted 7 recovery amount of $781.9 million.

8 And then we calculate how much we 9 estimate to collect in Part 170 billings and that 10 was $246.7 million. So we arrive at our total 11 collections for Part 171 of the $535.2 million. So 12 next slide.

13 All right, so this pie chart shows in 14 total the amount to be -- the light green amount is 15 the amount to be recovered, 90 percent before 16 adjustments. That's the $780.8 million.

17 And then we have our fee relief of 10 18 percent. That's the $86.8 million. And then we 19 have that little beige pie piece is our non-fee 20 recoverable items which was the $43.4. Next slide.

21 So, fee relief. So what is fee relief?

22 That is 10 percent of the fee recoverable budget.

23 So it's two types of activities.

24 One would be activities not attributable 25 to an existing NRC license or class of licensee. So NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

88 1 things like agreement state oversight, scholarships 2 and fellowships, medical isotope production 3 infrastructure.

4 And then the other category is 5 activities not assessed under Part 170 licensing and 6 inspection fees, or Part 171 annual fees. And 7 that's based on existing law or Commission policy.

8 So that would be things like fee 9 exemption for non-profit educational institutions, 10 small entity costs not recovered, agreement state 11 regulatory support, generic decommissioning 12 reclamation, uranium recovery program and 13 unregistered general licenses, and then the 14 Department of Defense remediation program.

15 So at the bottom you see a little 16 calculation for total fee relief activities. From 17 the '19 proposed fee rule it was $86.6 million.

18 And then 10 percent of total NRC budget 19 less non fee items is $86.8. So we arrive at a fee 20 relief adjustment. So this year it was a credit of 21 $0.2 million. And that gets allocated to all of the 22 licensees' annual fees proportionally. Next slide.

23 So here you can kind of see our license 24 fee classes and their percentage, the overall 25 percentage of budget resources. Of course operating NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

89 1 power reactors is our largest fee class and that one 2 is $86.6 million.

3 And then we have our smaller ones. I'm 4 sorry, percent. Sorry, 86.6 percent.

5 And then we have spent fuel storage of 6 4.7 percent, test and research reactors 0.2, fuel 7 facilities, that one is 4 percent. I'm sorry, 4.7.

8 Materials, 3.8, transportation is 0.6 and uranium 9 recovery.

10 Now, the uranium recovery slice is very 11 small and it's actually just a line and that's why 12 it looks like there's two lines going to that one 13 little piece for transportation but there's actually 14 another one right next to it and that's uranium 15 recovery. And it's very small, it's 0.1 percent.

16 Sorry if I couldn't separate them out a little bit.

17 Okay, next slide.

18 So as Maureen presented before our 19 professional hourly rate methodology, we had three 20 different buckets of resources that we add together 21 to get the total amount for our numerator. And I'll 22 show you that calculation in just a second in the 23 next slide.

24 You have mission direct program salaries 25 and benefits, mission indirect and then agency NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

90 1 support.

2 And then we deduct offsetting receipts 3 and -- offsetting receipts, our indemnity fees and 4 FOIA fees that we collect which shouldn't be 5 included in this calculation.

6 And another bucket of resources that's 7 not included in this calculation are direct 8 contracts that we bill to our licensees separately.

9 And then that would be our numerator, 10 that $759.8 million.

11 And then we have in our denominator 12 mission direct FTEs, that's the 1,810 times the 13 mission direct FTE productive hours which is the 14 15.10. And then we get our professional hourly rate 15 of 278.

16 So if you go to the next slide you can 17 see the actual calculation. So the budget resources 18 which is the $759.8 and then mission direct FTE 19 converted to hours which is our 1,851 direct FTE 20 times each FTE's productive hours which is 15.10.

21 And so then you get the $278 hourly rate. It's a $3 22 increase from the previous year. Next slide.

23 So, for our Part 170 fees the 24 professional hourly rate for full cost services, 25 that's reactors and other major licensees are billed NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

91 1 for staff hours and specific contract costs incurred 2 for licensing and oversight services.

3 And then we have a flat rate for 4 licensing fees. So material users pay new license 5 application fees based on the average time to 6 process each type of license application times the 7 effective professional hourly rate.

8 And we look at the flat application fees 9 every other year. So we do a biennial review. We 10 did one in the odd years. So in 2019. We'll do 11 another one in 2021.

12 And we look at the amount of time it 13 takes to perform these services and then we times it 14 by the new hourly rate to get to a new flat rate.

15 Okay, so developing our Part 1 fee 16 estimate. So, as Maureen said before she said that 17 we use one quarter of actual data and three quarters 18 of projected data.

19 And what I have here in the slide is 20 that we use the billing data for four quarters. So 21 that's billed Part 170 fees and contract work. And 22 then we adjust for changes in the workload 23 projections and we adjust for changes in the 24 professional hourly rate.

25 And so in the slide it says we have the NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

92 1 proposed rule estimates four quarters of fees 2 collected and then the invoice data four quarters of 3 the prior year.

4 And what happens is we ask for this 5 information in estimate of our partners in the 6 offices and then we validate it as the actual 7 information comes in. During this process of 8 developing the estimate we validate it with the 9 actual data.

10 And so for the final rule we're going to 11 estimate two quarters and we have two quarters of 12 actual data. So next slide.

13 So for our annual fees we first 14 determine the budget resources by fee class and then 15 we deduct our Part 170 receipts. And then we add 16 allocated generic transportation costs.

17 And then as Stephanie was talking about 18 this net fee relief credit or surcharge and low-19 level waste surcharge.

20 And so then we allocate our billing 21 adjustments, very small billing adjustments, and 22 then the balance is the required Part 171 fee. Next 23 slide.

24 So this table is just a representation 25 over the past eight years of the operating power NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

93 1 reactors calculation for annual fees.

2 And as you can see starting in 2012 we 3 had 104 reactors and now this year we're down to 98.

4 And so there was a slight uptick in the fee this 5 year as Maureen mentioned before and the reasons for 6 it.

7 So the budgeted resources were $670.2 8 million and then we had Part 170 estimated billings 9 that we deducted of the $213.8. And then our 10 adjustments that I just mentioned, $3.9 million to 11 arrive at Part 171 annual fees of the $460.3 12 million.

13 And then we divide that by the number of 14 reactors in the fleet and that came out to be the 15 4,697. So next slide.

16 So we have some policy changes this 17 year. So this will affect our Part 170 fees and 18 then our Part 171.

19 So we added subcategories to materials 20 user fees for locations of use for medical licenses.

21 So that's fee category 7C. So we added some 22 subcategories under that based on how many locations 23 that that particular category had.

24 And then we eliminated a fee category 2-25 A-5 and those were licenses that authorized the NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

94 1 possession of source material related to the removal 2 of contaminants from drinking water. And that 3 related to the petition for rulemaking that was also 4 included.

5 And then our fees transformation 6 initiative. So this was actually started under 7 Project Aim and the goal was to increase 8 transparency, timeliness and equitability to the 9 fee-setting process.

10 And originally we developed over 40 11 process and policy improvement options approved by 12 the Commission to be completed between 2017 and 13 2020.

14 And for 2017, 2018 and 2019 100 percent 15 of the improvements were completed.

16 So for 2020 we have six that remain.

17 And two of them have been completed.

18 So the first one was institute two 19 different hourly rates for flat application fees for 20 applicants to provide funds for infrastructure work.

21 That one was closed with no additional change but we 22 will revisit this if new applications surge.

23 And then the NRC has developed guidance 24 on the disclosure of information related to 25 contractor charges associated Part 170 invoices.

NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

95 1 So, the notification was sent out to 2 licensees in January of 2019. So we are closing 3 this one.

4 And then we have the remaining four that 5 are on track to complete for 2020. So the first 6 one, flat fees pilot for uranium recovery 7 activities, that one is on track to be completed by 8 the summer. And that one Stephanie will go over 9 when she talks about NEIMA and that we have a 10 reporting responsibility to Congress by the end of 11 the year to let the Congress know how that one was 12 completed.

13 And then electronic invoicing, that's e-14 billing. That one is also on track to be completed.

15 The third one, the analysis of a 16 proposal to issue one license for each uranium 17 recovery site instead of one license for multiple 18 sites, the analysis has been completed and it's 19 highly likely that that one will be closed with no 20 further action. But we need approval for that one 21 and then that one will be closed.

22 And then small entity size standard 23 rulemaking. So we are on track with that one.

24 And I think that's it. And so this 25 slide just has information resources, the regs for NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

96 1 Part 170 and 171 and then the fee rule.

2 And then also if you want to take a look 3 at our fee transformation accomplishments there's a 4 link there that you can go straight to that table.

5 So with that I'm going to turn things 6 over to Stephanie and she can go over NEIMA.

7 MS. COFFIN: So, I wanted -- this seemed 8 like the proper forum to preview the budget related 9 provisions that are in NEIMA. I want to reemphasize 10 that they're not in effect until Fiscal Year '21 but 11 we have work to do now in order to prepare and 12 implement the requirements that are in this act.

13 The big one of course is the first 14 bullet on there where we eliminate -- we essentially 15 go to 100 percent fee recovery. It's either 16 excluded, off the fee base, or it's on and we're 17 going to do some sort of recovery.

18 The law lists a number of excluded 19 activities and these are your usual suspects.

20 Nuclear waste fund, WIR, generic homeland security, 21 the integrated university program, advanced 22 reactors.

23 The act also gives us the latitude to 24 propose additional activities to be placed in this 25 category.

NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

97 1 The third bullet on there caps the 2 annual fee per operating reactor licensee to the 3 Fiscal Year 2015 fee rule. We are allowed to adjust 4 that for inflation.

5 The fourth bullet talks about capping 6 corporate support at 30 percent beginning in Fiscal 7 Year '21 and stepping down to 28 in Fiscal Years '25 8 and beyond.

9 And you might recall from my 10 presentation we're hovering around 31-32 percent.

11 So this is going to be an area of focus for us in 12 the upcoming years to do our best to meet the 13 requirements in that law.

14 Bullets five and six on there are 15 related to invoicing. And this is work actually 16 that's been underway for a number of years already, 17 got codified in this act but we're progressing 18 nicely in this area and don't really see any --

19 don't see any impediments to achieving the 20 requirements of the act.

21 The second to last bullet, Michele 22 mentioned this about our voluntary pilot about a 23 flat fee structure for our remaining licensee in 24 uranium recovery fee class. And we're progressing 25 nicely on that. And don't see any impediment to NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

98 1 achieving the request and the requirements in the 2 act.

3 And then the last one does give us an 4 opportunity to report back to Congress at the end of 5 the fiscal year on how all of this worked out in '21 6 and give them feedback on how this progressed and 7 what were some of the lessons learned and challenges 8 at the end of the implementation of the first year.

9 And next slide. So now I am again going 10 to turn it over to Richard to facilitate a second 11 Q&A session.

12 FACILITATOR RIVERA-LUGO: So with that 13 last portion of the presentation we would like to 14 open the floor for questions and comments from the 15 public or participants.

16 Again for those participating on the 17 phone lines dial *1 and record your name. And while 18 the operator takes a queue for any questions on the 19 lines we're going to start with the folks in the 20 room. Please approach the microphones and remember 21 to state your name and affiliation clearly.

22 MR. BUTLER: John Butler, NEI.

23 Stephanie, I wanted to kind of follow up with NEIMA.

24 I'm sure you've looked at it in a lot more detail 25 than I have.

NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

99 1 In what you've seen of NEIMA so far and 2 your evaluation what's your expectation of what the 3 impact will be say on the exclusions versus 90 4 percent under OBRA '90? Would the exclusions in 5 NEIMA approach 10 percent of the budget?

6 MS. COFFIN: I don't know that we've --

7 I've done the actual calculation, but all of those 8 categories are what we've been doing for the past, 9 you know, 10 years so none of that was a particular 10 surprise to us.

11 So some of the items that are currently 12 in our fee relief Congress captured them as an 13 excluded activity. And again we need to make a 14 proposal to the Commission about what may be 15 additional activities to propose to Congress to our 16 appropriators.

17 One example might be international 18 activities. So our appropriators over the last two 19 years have asked us to treat international 20 activities off the fee base. That particular item 21 wasn't included in this act. So it might be 22 something the staff would propose to the Commission 23 to continue that practice and make that proposal to 24 Congress to continue to include international 25 activities. Does that make sense?

NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

100 1 MR. BUTLER: It does. Thanks.

2 FACILITATOR RIVERA-LUGO: Let's go on to 3 the phone lines. Are there any questions from 4 participants on the phone?

5 OPERATOR: The first question comes from 6 Eric Jebsen. You may go ahead.

7 MR. JEBSEN: Thanks for taking my 8 question. And I apologize if I just missed this in 9 the presentation. It goes back to some extent to 10 what was presented before and I missed whether or 11 not the university support program was or was not 12 included in the fee recovery portion, especially for 13 operating reactors. Thank you.

14 MS. WYLIE: So the integrated university 15 program is not included. It is a part of -- it is 16 in the fee relief category.

17 So those who pay the operating reactor 18 annual fee do not pay for the integrated university 19 program.

20 FACILITATOR RIVERA-LUGO: Next question 21 from the phone lines if there are any?

22 OPERATOR: There are no further 23 questions at this time.

24 FACILITATOR RIVERA-LUGO: Any other 25 questions from the participants in the room? With NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

101 1 no questions in the room so far I leave it to 2 Maureen to proceed with the meeting.

3 MS. WYLIE: So I think this might be our 4 shortest question and answer session. I see that as 5 a sign that the work paper transparency is improving 6 so that's a good thing.

7 We take to heart the feedback that you 8 gave us earlier about increasing that transparency 9 and will continue to work on that.

10 One of the things that we need to 11 consider is perhaps taking the workload tables that 12 are in the CBJ of the appropriate year and including 13 them in the work papers so that people can see them 14 close to one another.

15 So that would give people an opportunity 16 to see an increase in a certain type of licensing 17 activity like subsequent license renewal, or a 18 decrease in some sort of consolidated interim 19 storage as an example.

20 Well, in summary we look forward to your 21 comments. Your comments are due for this rulemaking 22 on March 4 which is just around the corner.

23 And this is laid out fairly directly, 24 but we are particularly interested in your feedback 25 so please, please subject to the out of scope NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

102 1 comment from earlier in the presentation 2 notwithstanding we really do want to hear from you 3 about how we can make the fee rule more transparent 4 and our fee process greater, more fair.

5 Let's go to the last slide. Okay. As I 6 said, Michele Kaplan is ending her tenure with us in 7 this area. So her name is in the fee rule. You can 8 send requests for further information to her, or you 9 can send them to Stephanie Coffin who's the director 10 of budget.

11 So in summary I'd just like to say we do 12 understand that this is a collaborative effort. So 13 in particular if there are things that can make this 14 simpler and easier including around invoices I'm 15 very open to suggestions.

16 I would like to take this opportunity to 17 thank NEI and the nine licensees who are 18 participating in our e-billing project. This has 19 been a different process for us, but e-billing is 20 really for them.

21 So we want to make sure that their 22 requirements are heard throughout our process. And 23 we are on schedule to complete that and roll out our 24 first phase by October 1.

25 So, would anybody like to add anything?

NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

103 1 Then I think we're adjourned. Thank you all very 2 much.

3 FACILITATOR RIVERA-LUGO: Thank you very 4 much for everyone participating on the phone lines.

5 As a reminder please refer to the presentation for 6 information on submitting comments to the proposed 7 fee rule. They are due on March 4, 2019.

8 And the contact information for the 9 people responsible for this proposed fee rule are 10 also included in that slide. With that, thank you 11 very much for participating and have a good day.

12 (Whereupon, the above-entitled matter 13 went off the record at 3:12 p.m.)