ML19058A009
| ML19058A009 | |
| Person / Time | |
|---|---|
| Issue date: | 07/31/2019 |
| From: | Office of Nuclear Material Safety and Safeguards |
| To: | |
| Doyle, Daniel | |
| Shared Package | |
| ML19058A006 | List: |
| References | |
| 10 CFR Part 50, 10 CFR Part 52, NRC-2011-0189, NRC-2014-0240, PRM-50-97, PRM-50-98, RIN 3150-AJ49, SRM-SECY-16-0142 | |
| Download: ML19058A009 (22) | |
Text
Regulatory Analysis Addendum:
Final Rule to Address Mitigation of Beyond-Design-Basis Events
Regulatory Analysis Addendum:
Final Rule to Address Mitigation of Beyond-Design-Basis Events
Regulatory Analysis Addendum:
Final Rule to Address Mitigation of Beyond-Design-Basis Events
Code of Federal Regulations
Federal Register
Regulatory Analysis Addendum:
Final Rule to Address Mitigation of Beyond-Design-Basis Events
Regulatory Analysis Addendum:
Final Rule to Address Mitigation of Beyond-Design-Basis Events
1.1 Background 1.2 Statement of the Problem and U.S. Nuclear Regulatory Commission Objectives for the Rulemaking
- Regulatory Analysis Addendum:
Final Rule to Address Mitigation of Beyond-Design-Basis Events
- 2.1 Option 1: Take No Action Regulatory Analysis Addendum:
Final Rule to Address Mitigation of Beyond-Design-Basis Events 2.2 Option 2: Undertake Rulemaking to Make Order EA-12-049 and Order EA-12-051 Generically Applicable Regulatory Analysis Addendum:
Final Rule to Address Mitigation of Beyond-Design-Basis Events 3.1 Summary of Costs and Benefi ts of the Regulatory Options Option 1: Take No Action
Option 2: Undertake Rulemaking to Make the Mitigation Strategies and SFPI Orders Generically Applicable
Regulatory Analysis Addendum:
Final Rule to Address Mitigation of Beyond-Design-Basis Events Review Rule Requirements Subtotal ($110,000)
$0 ($7,200,000)
$0 ($7,200,000) ($7,200,000) ($7,200,000) Staffing Capabilities Subtotal Communication Capabilities Subtotal Command and Control Procedures Subtotal Reevaluated Hazard Evaluation Subtotal Reevaluated Hazards Change Management Subtotal Total
($110,000)$0 ($7,200,000)$0 ($7,200,000)($7,200,000)($7,200,000)
Regulatory Analysis Addendum:
Final Rule to Address Mitigation of Beyond-Design-Basis Events
3.2 Costs of the Final Rule ***
Regulatory Analysis Addendum:
Final Rule to Address Mitigation of Beyond-Design-Basis Events
Regulatory Analysis Addendum:
Final Rule to Address Mitigation of Beyond-Design-Basis Events
3.3 Benefits of the Final Rule **Federal Register Regulatory Analysis Addendum:
Final Rule to Address Mitigation of Beyond-Design-Basis Events 3.4 Uncertainty Analysis
Regulatory Analysis Addendum:
Final Rule to Address Mitigation of Beyond-Design-Basis Events
Regulatory Analysis Addendum:
Final Rule to Address Mitigation of Beyond-Design-Basis Events 3.5. Disaggregation Regulatory Analysis Addendum:
Final Rule to Address Mitigation of Beyond-Design-Basis Events Section 50.8, "Information Collection Requirements: OMB Approval"Section 50.34, "Contents of Applications; Technical Information"Section 50.54, "Conditions of Licenses" Section 50.155, "Mitigation of Beyond-Design-Basis Events Paragraph 50.155(a), "Applicability" Paragraph 50.155(b), "Strategies and guidelines" Paragraph 50.155(c), "Equipment" Paragraph 50.155(d), "Training requirements" Paragraph 50.155(e), "Spent fuel pool monitoring" Paragraph 50.155(f), "Documentation of changes" Paragraph 50.155(g), "Implementation" Paragraph 50.155(h), "Withdrawal of orders and removal of license conditions" 10 CFR Part 50, Appendix E, Section IV.F, "Training" (moved EDMG training requirement element to 10 CFR 50.155(d)) 10 CFR Part 50, Appendix E, Section VI, "Emergency Response Data System" (administratively replaced the phrase "onsite modem" and removed the word "unit") Section 52.80, "Contents of Applications; Additional Technical Information" 3.6 Backfitting and Issue Finality Regulatory Analysis Addendum:
Final Rule to Address Mitigation of Beyond-Design-Basis Events 4.1 Make the Order Requirements Generically Applicable
4.2 Addresses a Number of Petitions for Rulemaking Regulatory Analysis Addendum:
Final Rule to Address Mitigation of Beyond-Design-Basis Events 4.3 Summary Regulatory Analysis Addendum:
Final Rule to Address Mitigation of Beyond-Design-Basis Events
Code of Federal RegulationsEnergy Energy Federal Register
Regulatory Analysis Addendum:
Final Rule to Address Mitigation of Beyond-Design-Basis Events