NRR E-mail Capture - Hatch Units 1 and 2 - NRC Audit of NFPA 805 and 10 CFR 50.69 Amendments - Revision
ML19057A419
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 02/26/2019
From: John Lamb
Plant Licensing Branch II
To: Lowery K
Southern Nuclear Operating Co
References
Download: ML19057A419 (2)


Text

NRR-DMPSPEm Resource From: Lamb, John Sent: Tuesday, February 26, 2019 10:36 AM To: Lowery, Ken G.

Subject:

Hatch Units 1 and 2 - NRC Audit of NFPA 805 and 10 CFR 50.69 Amendments -

Revision Importance: High

Dear Mr. Lowry:

By separate applications dated April 4, 2018 (Agencywide Documents Access and Management System (ADAMS)

Accession No. ML18096A936), and June 7, 2018 (ADAMS Accession No. ML18158A583), Southern Nuclear Operating Company (SNC) submitted two license amendment requests (LARs) for the Edwin I. Hatch Nuclear Plant (HNP), Unit Nos. 1 and 2.

In the first LAR, dated April 4, 2018, SNC proposed to adopt National Fire Protection Association Standard 805 (NFPA 805), Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants, 2001 Edition (ADAMS Accession No. ML010800360), as incorporated into Title 10 of the Code of Federal Regulations, Part 50, Section 50.48(c).

In the second LAR, dated June 7, 2018, SNC proposed to adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors.

To support the review of the proposed LARs, an audit team consisting of U.S. Nuclear Regulatory Commission (NRC) staff from the Office of Nuclear Reactor Regulation, Division of Risk Assessment (ORA), will be conducting a regulatory audit at the HNP site the week of March 18, 2019, as previously discussed with the SNC staff. The NRC staff from the ORA Probabilistic Risk Assessment Licensing Branches A and B, and NRC contractors from the Pacific Northwest National Laboratory will perform the audit. The NRC regional staff may also be present as observers. The audit plan for both reviews was provided in a letter, dated January 23, 2019 (ADAMS Accession No. ML19018A231).

The NRC staff is changing the NRC Audit Team Leader from Leslie Fields to Jay Robinson. The NRC staff plans on conducting the seismic part of the 10 CFR 50.69 audit separately at a time outside of the week of March 18, 2019, since the SNC seismic staff will be participating remotely during the audit week. In addition, the NRC staff plans to conduct webinars and/or teleconferences in preparation for the audit.

Thanks.

John 1

Hearing Identifier: NRR_DMPS Email Number: 826 Mail Envelope Properties (John.Lamb@nrc.gov20190226103500)

Subject:

Hatch Units 1 and 2 - NRC Audit of NFPA 805 and 10 CFR 50.69 Amendments -

Revision Sent Date: 2/26/2019 10:35:55 AM Received Date: 2/26/2019 10:35:00 AM From: Lamb, John Created By: John.Lamb@nrc.gov Recipients:

"Lowery, Ken G." <KGLOWERY@southernco.com>

Tracking Status: None Post Office:

Files Size Date & Time MESSAGE 2037 2/26/2019 10:35:00 AM Options Priority: High Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:

Recipients Received: