Supplement to Submittal of Relief Request Associated with the Third Inservice Inspection (ISI) Interval
ML19053A615
Person / Time
Site: Hope Creek PSEG icon.png
Issue date: 02/22/2019
From: Duke P
Public Service Enterprise Group
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
LR-N19-0013
Download: ML19053A615 (2)


Text

PSEG Nuclear LLC P.O. Box 236, Hancocks Bridge, NJ 08038-0236 LR-N19-0013 February 22, 2019 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555-0001 Hope Creek Generating Station Renewed Facility Operating License No. NPF-57 NRC Docket No. 50-354 0PSEG Nuclear LLC 10 CFR 50.55a(g)(5)(iii)

Subject:

Supplement to Submittal of Relief Request Associated with the Third lnservice Inspection (lSI) Interval Reference 1:

LR-N18-0087, "Submittal of Relief Request Associated with the Third lnservice Inspection (lSI) Interval," dated September 24, 2018 On September 24, 2018, PSEG Nuclear LLC (PSEG) submitted a relief request associated with the third lnservice Inspection (lSI) interval to Renewed Facility Operating License No. NPF-57 for Hope Creek Generating Station (Reference 1 ). This letter corrects a typographical error in of the referenced letter.

On page 49 of Enclosure 1 in Relief Request No. HC-13R-08, PSEG discusses the basis for the alternate EVT-1 visual examinations that were performed on three of the recirculation inlet nozzles, one of the low pressure coolant injection (LPCI) nozzles, and one of the core spray nozzles. ASME Code N-648-1 was used as the basis for those examinations. Page 49 states that PSEG performed the surface area coverages for the visual examinations in accordance with surface area coverages defined in Figure IWC-2500-7(b) of the 2001 Edition of ASME Section XI. The figure referenced should be IWB-2500-7(b) instead of IWC-2500-7(b). This is aligned with the code case referenced, N-648-1.

The typographical error does not affect the statements made in the Reference 1 submittal concerning the proposed alternative and basis for use.

There are no regulatory commitments contained in this letter.

If you have any questions or require additional information, please contact Mr. Lee Marabella at (856) 339-1208.

February 22, 2019 Page 2 LR-N 19-0013 Respectfully, Gc /_r!J__J Paul R. Duke Jr.

\\

Manager - Licensing PSEG Nuclear LLC cc:

Administrator, Region I, NRC Project Manager, NRC NRC Senior Resident Inspector, Hope Greek Chief, NJBNE Corporate Commitment Tracking Coordinator Hope Creek Commitment Tracking Coordinator 10 CFR 50.55a(g)(5)(iii)