ML19052A605
ML19052A605 | |
Person / Time | |
---|---|
Issue date: | 02/19/2019 |
From: | Jessica Chu Acquisition Management Division |
To: | Pence M Oasis Systems |
References | |
GS06F0641Z | |
Download: ML19052A605 (2) | |
Text
1. CONTRACT ID CODE PAGE OF PAGES AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1 2
- 2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)
M0016 02/21/2019
- 6. ISSUED BY CODE NRCHQ 7. ADMINISTERED BY (If other than Item 6) CODE US NRC - HQ ACQUISITION MANAGEMENT DIVISION MAIL STOP 3WFN-05-C64MP WASHINGTON DC 20555-0001
- 8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
(x) 9A. AMENDMENT OF SOLICITATION NO.
OASIS SYSTEMS LLC ATTN MARYLEE PENCE 9B. DATED (SEE ITEM 11) 1803 RESEARCH BOULEVARD SUITE 204 ROCKVILLE MD 20850 x 10A. MODIFICATION OF CONTRACT/ORDER NO.
GS06F0641Z NRC-R4-94-14-T-0001 10B. DATED (SEE ITEM 13)
CODE FACILITY CODE 02/27/2014 062021639
- 11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing Items 8 and 15, and returning ___________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
- 12. ACCOUNTING AND APPROPRIATION DATA (If required)
See Schedule
- 13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
X fAR 52.217-9 Option to extend the term of the contract E. IMPORTANT: Contractor x is not is required to sign this document and return __________________ copies to the issuing office.
- 14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
The purpose of this modification is the following:
- 1) Exercise Option Period 5, 2) Attach WAFs 00001-12B.
See continuation pages for more details.
SUMMARY
OBLIGATION: (unchanged)
EXERCISE CEILING: (unchanged)
OVERALL CEILING: $ (unchanged)
Period of Performance: 02/26/2014 to 02/20/2020 Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
JESSICA CHU 15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16 16C. DATE SIGNED 02/19/2019 (Signature of person authorized to sign)
Previous edition unusable NDARD FORM 30 (REV. 11/2016) scribed by GSA FAR (48 CFR) 53.243
GS06F0641Z NRC-R4-94-14-T-0001 Modification 16 Page 2 of 2 Unilaterally, FAR 52.217-9 -- Option to Extend the Term, this modification shall:
1.) Exercise Option Year 5: 02/21/2019 - 02/20/2020 Per FAR 52.217-9 -- Option to Extend the Term of the Contract, NRC provided a Notice of Intent to the Contractor on November 20, 2018, which was acknowledged by the Contractor on November 20, 2019.
2.) The Task Orders total ceiling shall remain the same at $210,970.00.
3.) Under Option Year 5, this modification authorizes LH and FFP performance under WAF(s) WAF 00001-12B (see attachment(s)). Attachment(s) shall be incorporated as Task Order Attachment(s) as follows:
Attachment 17 - WAF 00001-12B 4.) CLIN 00001 Obligations are added as follows:
WAF 00001-12B: Total This is to extend the period of performance As a result of the ceiling and obligations changes, CLIN 00001 has a ceiling of
, therefore unfunded and available to fund under the ceiling.
5.) The Task Orders Total Obligations have therefore been modified as:
From:
By:
To:
All other terms and conditions remain the same.