ML19037A152
| ML19037A152 | |
| Person / Time | |
|---|---|
| Site: | 07201008 |
| Issue date: | 02/06/2019 |
| From: | Ngwayah R Holtec |
| To: | Bernie White Document Control Desk, Division of Spent Fuel Management |
| Shared Package | |
| ML19037A150 | List: |
| References | |
| 5014864 | |
| Download: ML19037A152 (2) | |
Text
Holtec Technology Campus, 1 Holtec Blvd, Camden, NJ 08104 HOLTEC INTERNATIONAL February 6, 2019 Telephone (856) 797-0900 Fax (856) 797-0909 Mr. Bernard White, Senior Project Manager-Spent Fuel Licensing Branch Division of Spent Fuel Management U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001
Subject:
Reference:
HI-STAR 100 Amendment Request (1008-3), removal of Preferential Fuel Loading requirement from Certificate of Compliance (CoC)
"Holtec International HI-STAR 100 System, USNRC Docket No. 72-1008, Amendment Request (1008-3)", Letter No. 5014795 from Kimberly Manzione (Holtec) to Mark Lombard (NRC) dated September 25, 2015.
Dear Mr. White:
By letter dated September 25, 2015 [Ref.] Holtec International submitted an amendment (Amendment #3) to the Certificate of Compliance (CoC) for the HI-STAR 100 Dry Cask Storage System. This letter and its enclosures provide supplemental information that justifies removal of Preferential Fuel Loading from HI-STAR 100 CoC 1008 Appendix B (Section 1.1.2) in the amendment request. Enclosure 1 to this letter contains the justification for removal of Preferential Fuel Loading from CoC Appendix B. Enclosures 2 and 3 contain related proposed changes to CoC Appendix B and HI-STAR 100 FSAR Chapter 4 (Proposed Rev. 4D) respectively. Proposed changes related to Preferential Fuel Loading in Enclosures 2 and 3 are highlighted.
If you have any questions, please contact me at 856-797-0900, ext 3844.
Sincerely, R~~(.!W 0 tfir Licensing Engineer Holtec International cc:
Mr. Mike Layton (NRC)
Mr. John McKirgan (NRC)
Document 10: 5014864 Page I of2
HOLTEC INTERNATIONAL Enclosures Holtec Technology Campus, 1 Holtec Blvd, Camden, NJ 08104 Telephone (856) 797-0900 Fax (856) 797-0909 : HI-STAR 100 CoC 1008 Preferential Fuel Loading removal justification : Proposed changes to CoC 1008 Appendix B : HI-STAR 100 FSAR Proposed Revision 4D Document ID: 5014864 Page 2 of2