MONTHYEARML25055A2132025-02-24024 February 2025 NRR E-mail Capture - Fyi Spring 2025 Steam Generator Inspection Calls (Vogtle Unit 2 Not Selected) ML25052A2562025-02-21021 February 2025 Acceptance Review - Vogtle Units 3 and 4 - LAR to Move SRs from TS 3.3.15 and 3.3.16, ESFAS Actuation Logic - EPID L-2025-LLA-0013 ML25021A2492025-01-21021 January 2025 Email Capture - Acceptance Review - Vogtle, Units 1 and 2-Proposed LAR to Revise TS SR 3.6.6.8 ML25013A2582025-01-13013 January 2025 NRR E-mail Capture - Acceptance Review - Vogtle 3 and 4 - License Amendment Request to Increase Flexibility in Mode Restraints ML25010A0682025-01-0909 January 2025 NRR E-mail Capture - Acceptance Review for Vogtle 2 Alternative Request for 2A and 2B Charging Pumps ML25008A1032025-01-0808 January 2025 Acceptance Review of Amendment Request to Implement TSTF-554 ML25008A0202025-01-0808 January 2025 NRR E-mail Capture - (External_Sender) Question - Southern Nuclear Operating Co., Inc. Fleet Physical Security Exemptions ML24365A1172024-12-28028 December 2024 57483-EN 57483 - Attachment Removed - Part 21 Report. Ametek Solidstate Controls Interim Part 21 Notification ML24346A0342024-12-11011 December 2024 NRC Email Dated December 11, 2024, - Draft Meeting Summaries - Pre-Submittal Meeting - Vogtle 3 and 4 - Proposed Modes 5 and 6 LAR ML24345A2572024-12-0909 December 2024 SNC Email Dated December 9, 2024, - Meeting Summary - Pre-Submittal Meeting - Vogtle 3 and 4 - Proposed Modes 5 and 6 LAR ML24339B8202024-12-0404 December 2024 Vogle Electric Generating Plant, Units 3 and 4 - Email Capture - Acceptance Review - Vogtle 3 and 4 - TS 3.3.8 ESFAS - SR Neutron Flux Doubling ML24311A2242024-11-0606 November 2024 NRR E-mail Capture - Change to Estimated Completion Date for the SNC Fleet Physical Barrier Exemptions (L-2023-LLE-0018 and L-2023-LLE-0021) ML24290A1552024-10-16016 October 2024 NRR E-mail Capture - for Your Action - RAI - Farley, Hatch, and Vogtle 1 and 2 - Proposed Alternative Request for Code Case N-572 ML24290A1572024-10-16016 October 2024 NRR E-mail Capture - for Your Action - RAI - Farley and Vogtle 1 and 2 - Alternative Request for Pressurizer Welds (L-2024-LLR-0047) ML24289A2002024-10-15015 October 2024 NRR E-mail Capture - for Your Action - RAI - Proposed License Amendment Request (LAR) for Vogtle Electric Generating Plant, Units 3 and 4 TS 3.7.6 Action E and SR 3.7.6.5 (L-2024-LLA-0083) ML24261B9282024-09-17017 September 2024 NRR E-mail Capture - for Your Action Discussion Points - Steam Generator Tube Inspection Call with SNC Regarding Vogtle, Unit 3 ML24250A1132024-09-0303 September 2024 Inspection Report 2024004 Radiation Safety Baseline Inspection Information Request ML24247A0092024-09-0303 September 2024 NRR E-mail Capture - Fyi - Revised Estimated Completion Date - Vogtle 3 and 4 - UFSAR Scheduler Exemption Request ML24250A1922024-08-29029 August 2024 Amendment Nos. 223/206 (1) - Email ML24232A0052024-08-16016 August 2024 NRR E-mail Capture - Acceptance Review - LAR and Exemption Request to Remove Tier 1 and Tier 2 Requirements for Vogtle 3 and 4 ML24253A0722024-08-15015 August 2024 Perspectives on Proposed Removal of Tier 1 and Tier 2 Requirements ML24225A0062024-08-0909 August 2024 NRR E-mail Capture - Acceptance Review - Vogtle 3 and 4 - LAR Changes to Technical Specification 3.7.6, Main Control Room Emergency Habitability System (Ves), Action a and SR 3.7.6.6 (L-2024-LLA-0101) ML24206A0252024-07-20020 July 2024 NRR E-mail Capture - for Your Comments - State of Georgia - Vogtle Unit 1 - Emergency License Amendment Request for Technical Specification 3.7.9 ML24199A1592024-07-17017 July 2024 NRR E-mail Capture - Request for Additional Information - Vogtle 3 and 4 - Exemption for the Requirements in 10 CFR 50.71 Pertaining to the Submittal of Updated Final Safety Analysis Report ML24198A1672024-07-16016 July 2024 NRR E-mail Capture - Acceptance Review Vogtle 3 and 4 - License Amendment Request Changes to Technical Specification 3.7.6, Main Control Room Emergency Habitability System (Ves) Surveillance Requirement L-2024-LLA-0083 ML24197A1572024-07-15015 July 2024 NRR E-mail Capture - Acceptance Review - Farley and Vogtle 1 and 2, LAR - TSTF-589, Eliminate Automatic Diesel Generator Start During Shutdown ML24197A0172024-07-12012 July 2024 NRR E-mail Capture - Fyi - Acceptance Review - Farley and Vogtle 1 and 2 - Alternative Request for Pressurizer Welds ML24194A0032024-07-11011 July 2024 NRR E-mail Capture - Fyi - Acceptance Review - Farley, Hatch, and Vogtle 1 and 2 - Alternative Request for Code Case N-572 ML24180A0012024-06-26026 June 2024 NRR E-mail Capture - Acceptance Review Farley 1 and 2 and Vogtle 1 and 2 - Proposed Inservice Inspection Alternative GEN-ISI-ALT-2024-002 for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1) (L-2024-LLR-0041) ML24170A9362024-06-18018 June 2024 NRR E-mail Capture - Fyi - Change to Estimated Completion Date for the SNC Fleet Physical Barrier Exemptions (L-2023-LLE-0018 and L-2023-LLE-0021) ML24178A3422024-05-16016 May 2024 NRR E-mail Capture - Request for Call - Proposed Vogtle 3 & 4 Tier 1 and Tier 2 Exemptions and LAR ML24120A0462024-04-29029 April 2024 COL Docs - Re Fyi - SNC Notification Received of Vogtle Unit 4 - Completion of Power Ascension Tests ML24120A0262024-04-29029 April 2024 COL Docs - FW Vogtle Electric Generating Plant, Unit 4 - Project Manager Reassignment ML24119A0012024-04-28028 April 2024 COL Docs - Fyi - SNC Notification Received of Vogtle Unit 4 - Completion of Power Ascension Tests ML24108A0132024-04-16016 April 2024 NRR E-mail Capture - (External_Sender) Responses from Wednesday 4/10/2024 Call with Southern Nuclear Operating Co. Vogtle 3&4 Licensing Actions ML24107A7292024-04-15015 April 2024 Request for Vogtle Electric Generating Plant Units 1 & 2 - Radiation Protection Inspection - Inspection Report 2024-02 ML24107A9322024-04-15015 April 2024 Document Request for Vogtle Electric Generating Plant Units 1 & 2 - Radiation Protection Inspection Report 2024-02 ML24106A0522024-04-12012 April 2024 NRR E-mail Capture - Acceptance Review - Vogtle 1 and 2 - Emergency Diesel Generator (EDG) Voltage and Frequency License Amendment Request (LAR) (L-2024-LLA-0031) ML24100A7842024-04-0909 April 2024 NRR E-mail Capture - for Your Action - Request for Additional Information (RAI) - Vogtle, Units 3 and 4 - Alternative Request for Explosively Actuated Valves (L-2023-LLR-0016) ML24099A0372024-04-0505 April 2024 NRR E-mail Capture - Acceptance Review - Vogtle Unit 3, License Amendment Request (LAR) Technical Specification (TS) 5.5.13, Ventilation Filter Testing Program (VFTP) - L-2024-LLA-0043 ML24095A2412024-04-0404 April 2024 NRR E-mail Capture - Acceptance Review for the Exemption Request Regarding the Final Safety Analysis Report Update Schedule at Vogtle, Units 3 and 4 ML24072A3982024-03-12012 March 2024 NRR E-mail Capture - for Your Action - Second Round Request for Additional Information (RAI) - Vogtle, Unit 1 - SG Tube Inspection Report - 1R24 (L-2023-LRO-0067) ML24061A2372024-03-0101 March 2024 SNC Email Dated March 1, 2024, Regarding SNC Response to NRC Letter for Vogtle 3 & 4 RES Info ML24057A0872024-02-23023 February 2024 NRR E-mail Capture - Acceptance Review - Alternative Request for Explosively Actuated Valves at Vogtle, Units 3 and 4 ML24046A1352024-02-15015 February 2024 COL Docs - Fyi - SNC Notification Received of Vogtle Unit 4 - Completion of Initial Criticality and Low-Power Testing ML24039A0882024-02-0808 February 2024 COL Docs - Fyi - SNC Notification Received of Vogtle Unit 4 Completion of Pre-Critical Tests ML24039A1922024-02-0808 February 2024 COL Docs - Correction - Re Fyi - SNC Notification Received of Vogtle Unit 4 Completion of Pre-Critical Tests ML24039A1122024-02-0808 February 2024 COL Docs - Re Fyi - SNC Notification Received of Vogtle Unit 4 Completion of Pre-Critical Tests ML24031A0502024-01-31031 January 2024 COL Docs - FW Erroneous Description of Tier 2 Change Process in Construction Lessons-Learned Report ML24017A1122024-01-17017 January 2024 NRR E-mail Capture - Request for Access to Cyber Security Data - Vogtle, Units 3 and 4 2025-02-24
[Table view] |
Text
1 Vogtle PEmails From:
Hoellman, Jordan Sent:
Thursday, January 31, 2019 3:42 PM To:
Roberts, Kelli Anne (KROBERTS@southernco.com)
Cc:
Patel, Chandu; Nist, Lauren; Vogtle PEmails
Subject:
Draft RAI Related to Vogtle Units 3 and 4, Request for Exemption from Operator Written Examination and Operating Test Attachments:
Draft RAI - Exemption from Operator Written Examination and Operating Test.pdf Good Afternoon, Attached is a draft Request for Additional Information (RAI) related to Vogtle Units 3 and 4, Request for Exemption from Operator Written Examination and Operating Test.
If you would like to schedule a clarification conference call to discuss this RAI, please let me know by Friday, February 8, 2019. If no request for a clarification call is received, this RAI will be issued as final.
Please let me know if you have any questions.
Thank you, Jordan Jordan Hoellman Project Manager Licensing Branch 2 Division of Licensing, Siting, and Environmental Analysis Office of New Reactors U.S. Nuclear Regulatory Commission office: OWFN 08-C18 phone: (301) 415-5481 email: Jordan.Hoellman2@nrc.gov
Hearing Identifier:
Vogtle_COL_Docs_Public Email Number:
409 Mail Envelope Properties (SN6PR0901MB236601F33C9CF2D241CEEECDD5910)
Subject:
Draft RAI Related to Vogtle Units 3 and 4, Request for Exemption from Operator Written Examination and Operating Test Sent Date:
1/31/2019 3:42:13 PM Received Date:
1/31/2019 3:42:16 PM From:
Hoellman, Jordan Created By:
Jordan.Hoellman2@nrc.gov Recipients:
"Patel, Chandu" <Chandu.Patel@nrc.gov>
Tracking Status: None "Nist, Lauren" <lauren.nist@nrc.gov>
Tracking Status: None "Vogtle PEmails" <Vogtle.PEmails@nrc.gov>
Tracking Status: None "Roberts, Kelli Anne (KROBERTS@southernco.com)" <KROBERTS@southernco.com>
Tracking Status: None Post Office:
SN6PR0901MB2366.namprd09.prod.outlook.com Files Size Date & Time MESSAGE 826 1/31/2019 3:42:16 PM Draft RAI - Exemption from Operator Written Examination and Operating Test.pdf 99017 Options Priority:
Standard Return Notification:
No Reply Requested:
No Sensitivity:
Normal Expiration Date:
Recipients Received:
Request for Additional Information - DRAFT Request for Exemption from Operator Written Examination and Operating Test Issue Date:
Application
Title:
VEGP, Units 3 and 4 - Exemption Request Operating Company: Southern Nuclear Operating Co.
Docket No. 52-0025 and 52-0026 By letter dated December 20, 2018, Southern Nuclear Operating Company, Inc. (SNC),
submitted "Request for Exemption from Operator Written Examination and Operating Test" to the U.S. Nuclear Regulatory Commission (NRC) for Vogtle Electric Generating Plant Unit 3 (VEGP 3) (Agencywide Documents Access and Management System Accession No. ML19030A226). Specifically, SNC requested, on behalf of 12 former operator license candidates from Virgil C. Summer Nuclear Station Unit 2 (VCSNS 2) who are identified in of the letter dated December 20, 2018, and who are now employed by SNC at VEGP 3, exemptions from the requirements of title 10 of the Code of Federal Regulations (10 CFR) 55.31(a)(3) and 10 CFR 55.33(a)(2).
In accordance with 10 CFR 55.11, the Commission may, upon application by an interested person, or upon its own initiative, grant such exemptions from the requirements of the regulations in this part as it determines are authorized by law and will not endanger life or property and are otherwise in the public interest. Section 10 CFR 55.31(a)(3) requires each applicant for an operators' license to submit a written request from an authorized representative of the facility licensee by which the applicant will be employed that the written examination and operating test be administered to the applicant. Section 10 CFR 55.33(a)(2) states in part that the Commission will approve an initial application for a license if it finds that the applicant has passed the requisite written examination and operating test in accordance with 10 CFR 55.41 and 55.45 or 55.43 and 55.45. It also states in part that the written examinations and operating tests determine whether the applicant for an operator's license has learned to operate a facility competently and safely, and additionally, in the case of a senior operator, whether the applicant has learned to direct the licensed activities of licensed operators competently and safely. of the letter dated December 20, 2018, states that the 12 former VCSNS 2 operator license candidates previously passed a written examination and operating test for VCSNS
- 2. Enclosure 1 also summarizes the results of a gap analysis SNC conducted to identify potential differences in the written examinations and operating tests given at VCSNS 2 and VEGP 3. The results of the gap analysis showed that there were differences in the emergency plan implementing procedures and conduct of operations procedures for each site.
The knowledge and abilities that are necessary to safely and competently implement the emergency plan and conduct of operations procedures at a site are tested on the written examination and on the operating test (i.e., by administrative job performance measures). Because the emergency plan implementing procedures and conduct of operations procedures at VCSNS 2 were different than those at VEPG 3, it is possible that the exams given to the 12 individuals at VCSNS 2 tested information about these two topics that is not applicable to VEGP 3. Therefore, the NRC staff cannot rely on those portions of the written exams and
operating tests that tested knowledge and abilities associated with implementing the VCSNS 2 emergency plan and conduct of operations procedures to determine whether the 12 individuals have learned to implement the emergency plan and conduct of operations procedures competently and safely at VEGP 3. states that SNC trained the 12 individuals on the VEGP 3 emergency plan implementing procedures and conduct of operations procedures. It also states that each of the 12 individuals passed exams that were developed by SNC on the VEGP 3 emergency plan implementing procedures and conduct of operations procedures.
QUESTIONS
- 1. The staff requests the following additional information to determine whether the exams that SNC administered to the 12 former VCSNS 2 operator license candidates adequately demonstrate that they have learned to implement the VEGP 3 emergency plan and conduct of operations procedures:
- a. The minimum score needed to pass the exam,
- b. Whether and how these exams tested knowledge and abilities necessary to implement the VEGP 3 emergency plan and conduct of operations procedures that otherwise would be tested on an NRC written exam and operating test,
- c. Whether and how exam security measures were established for these exams.
- 2. Additionally, Enclosure 1 states that SNC conducted the gap analysis by comparing "VEGP and VCSNS tasks lists."
Please clarify whether task lists for both reactor operators and senior reactor operators were reviewed during the gap analysis.