@ Westinghouse Director, Office of Nuclear Material Safety and Safeguards U. S. Nuclear Regulatory Commission Document Control Desk 11555 Rockville Pike Rockville, Maryland 20852-2738 Westinghouse Electric Company 5801 BluffRoad Hopkins, South Carolina 29061-9121 USA Direct tel: 803-647-2119 Direct fax: 803-695-3964 e-mail: couturgf@westinghouse.com Our ref: LTR-RAC-19-6 Date: January 23, 2019
SUBJECT:
WESTINGHOUSE 10CFR70.72 FACILITY CHANGE REPORT Westinghouse Electric Company LLC (Westinghouse) hereby submits the report of Columbia Fuel Fabrication Facility (CFFF) changes that did not require Nuclear Regulatory Commission (NRC) pre-approval in accordance with 10CFR70.72. This report addresses those changes completed within calendar year 2018. Westinghouse had no facility changes that required NRC pre-approval during this time period.
Westinghouse uses an integrated safety review approach for all modifications of, or additions to, existing structures, systems and components at the CFFF. This process is described in, and conducted in accordance with the requirements ofCFFF Regulatory Procedure RA-104, "Regulatory Review of Configuration Change Authorization." This integrated review is conducted by the various regulatory disciplines, including Nuclear Criticality Safety, Radiation Safety, Environmental Protection, Safeguards, Fire Safety, Chemical/Industrial Safety and other applicable Health and Safety experts when necessary. A key aspect of this review is a determination that the change is not prohibited by 10CFR70, a SNM-1107license condition, or a governing order. The reviewers also determine whether NRC pre-approval and SNM-1107 license amendment changes are required prior to implementation.
Specific guidance is provided to ensure that NRC pre-approval is obtained for changes that:
create new types of accident sequences that, unless mitigated or prevented, would exceed the performance requirements of 10CFR70.61 and that have not previously been described in the Integrated Safety Analysis (ISA) Summary; use new processes, technologies or control systems for which the licensee has no prior expenence; remove, without at least an equivalent replacement of the safety function, an Item Relied On For Safety that is listed in the ISA Summary and is necessary for compliance with the performance requirements of 10CFR70.61; or alter any Item Relied On Safety, listed in the ISA Summary, that is the sole item preventing or mitigating an accident sequence that exceeds the performance requirements of 10CFR70.6l.
Each of the changes identified in the attachment to this correspondence were evaluated in accordance with this RA-104 procedure, and a determination was made that NRC pre-approval of the respective change was not required. This determination was documented on each change authorization form by the appropriate regulatory engineering review functions. For all of these changes, the regulatory engineering review function checked the "No" box on the form for "NRC pre-approval required?".
Page 2 of2 Our ref: LTR-RAC-19-6 If you have any questions regarding this information, please contact me at (803) 647-2119.
Sincerely, r-/v--
c£~~
Gerard F. Couture, Principal Engineer Licensing Westinghouse Columbia Fuel Fabrication Facility Docket 70-1151 License SNM -1107 : Westinghouse CFFF 2018 Facility Change Report (37 pages)
CC:
U. S. Nuclear Regulatory Commission, Region II 245 Peachtree Center Avenue NE, Suite 1200 Atlanta, GA 30303-1257 Attn: Mr. Tom Vukovinsky U.S. Nuclear Regulatory Commission 11555 Rockville Pike Rockville, Maryland 20852-2738 Attn: Mr. Matthew Bartlett-Mail Stop TWFN-4A60
Name Title Replace Induction 14209 Power Supply Primary Winding on Oxide Ctr 1 15263 P-1165A Suction Wand 2018 CCF Approved by Engineer for Startup Description Justification Replace induction power supply transformer primary winding on oxide coater 1 h f.
1 d Ex1stmg co1 as a1 e and a d1rect
- 1.
Install suction wand on feed to P-1165A to provide the ability to easily process waste liquids in the Waterglass area into T-1160B.
Relocate UN tank valve station from scrap cage to UF6 bay so area behind replacement is not available.
Emptying mop buckets and the like into F-1165 basins is a safety risk (strains/pulls).
Relocate UN Valve 15347 Station in Scrap Cage to control room can be used by a new process.
Existing valve station in the scrap cage is taking up valuable space.
UF6 Bay Connection and Activation of Line 1 connect the combustion airflow transmitter for Line 1 calciner to the SIS PLC To establish the actual range of combustion 15419 Calciner Combustion and add programming to allow evaluation and data collection to determine air flow under normal conditions.
Airflow Transmitter FIT-flow range.
S-109-6.
Line 4 Ribbon Blender 15422 Outlet Plug Cylinder Speed Control Addition Replace Line 1 High 15453 Temperature Pump Contactors for P111A/B and P131A/B/C/D Install Experion Rack to 15480 Support New Scrap Uranium Recovery Equipment Add cylinder bleed control plate to the line 4 ribbon blender outlet plug pneumatic cylinder circuit.
To provide speed control for opening and closing the cylinder.
Replace Line 1 High Temperature Pump Contactors for p111A/B and The auxiliary contact package when Pl31A/B/C/D. Remove process line between V-112 and s-131 and associated disconnected prevents reset of the pump controls.
after a trip and requires maintenance to correct the issue. Similar to CCF 14-599.
Install a new Experion C200 Rack to existing Common Services BPCS system. Additional i/O is required for new process.
Elimination of waste containers that need to ISAID Components ISA-15 URRS Wastewater Treatment System ISA-11 Scrap Uranium Processing ISA-03 ADU Conversion ISA-08 Pelleting ISA-03 ADU Conversion ISA-11 Scrap Uranium Processing 154 Dispensing system for 90 Satellite Oil Station The dispensing station inside the building (lab area adjacent to the pump rebuild shop) will dispense four (4) types of hydraulic fluids from the drum locker located outside the building (Reference CCF 17-063). Full description of the fluids to be dispensed and the operation of the dispensing station are attached to this CCF.
be disposed of in contaminated landfill.
Grounds Conversion Line 1 15651 Decanter Frame Replacement Replace the decanter frame on conversion line 1 with a new frame that has be redesigned and fabricated.
Reduced handling of drums and containers during maintenance operations.
The old frame has corrosion issues and is not rigid enough to operate the decanter at full ISA-03 ADU Conversion RPM.
Page 1 of 37 Location Oxide Coater 1 on the Mechanical side URRS Outside/Waterglass Valves currently located in the scrap cage will be relocated to the UF6 bay Line 1 Calciner ADU Pelleting/Line 4 Ribbon Blender Line 1 by Scrubber pumps Scrap cage Along west wall of plant in the lab area adjacent to the pump rebuild shop on the chemical side of the operation.
Conversion Line 1 Decanter
Name Title 2018 CCF Approved by Engineer for Startup Description The project will remove the existing V-312 vessel and install a tank incorporating a new design. The motors for the P-312A and P-312B pumps Justification II k will also be replaced with C-frame units. New acid resistant pumps and tank Based on mechanical integrity investigations, ISAID lnsta V-312 Surge Tan d
"II I b
- II d "II b.
II d d d 1* b"l" E.
d h
II 1S663.
pa s WI a so e msta e. New p1pmg WI e msta e as nee e to connect Re 1a 1 1ty ngmeenng recommen s t at a ISA-03 ADU Conversion m ConverSIOn to the new tank. An onf1ce will be added m the tank mlet from the bag f1ve surge tanks be replaced.
filters.
The project will remove the existing V-112 vessel and install a tank incorporating a new design. The motors for the P-112A and P-112B pumps II k will also be replaced with C-frame units. New acid resistant pump and tank Based on mechanical integrity investigations, lnsta V-112 Surge Tan 15665.
pads w1ll also be mstalled. New p1pmg w1ll be mstalled as needed to connect Reliability Eng1neenng recommends that all ISA-03 ADU Conversion m Conversion to the new tank. An orifice will be added in the tank inlet from the bag five surge tanks be replaced.
filters.
The project will remove the existing V-512 vessel and install a tank incorporating a new design. The motors for the P-512A and P-512B pumps II k will also be replaced with C-frame units. New acid resistant pumps and tank Based on mechanical integrity investigations, ln~~12~~~n 15666.
pads will also be Installed. New p1pmg will be mstalled as needed to connect Rellab1llty,Engmeenng recommends that all ISA-03 ADU Convers1on m Convers1on to the new tank. An onf1ce w1ll be added 1n the tank mlet from the bag five surge tanks be replaced.
filters.
Line 3 Moisture Sampler The sensor will be removed. The determination that a sample has been 16193 d"f" d
"II I
I h
Mo 1 1cat1on retneve WI re yon yon a not er sensor.
The sensor currently in use is obsolete.
ISA-03 ADU Conversion 16194 Line 4Mo_isture Sampler The sensor ~ill be disabled. The determination that a sample has been Modification retneved will rely only on another sensor.
The sensor currently in use is obsolete.
ISA-03 ADU Conversion Line 4 Moisture Sampler The sensor will be removed. The determination that a sample has been 16195 Modification retrieved will rely only on another sensor.
The sensor currently in use is obsolete.
ISA-03 ADU Conversion Line 5 Moisture Sampler The sensor will be disabled. The determination that a sample has been 16196 d"fi d
"II I
I h
Mo 1 1cat1on retneve w1 re yon yon a not er sensor.
The sensor currently in use is obsolete.
ISA-03 ADU Conversion Page 2 of 37 Location The new tank and pump assemblies will be installed in the location of the existing tank and pump assemblies.
The new tank and pump assemblies will be installed in the location of the existing tank and pump assemblies.
The new tank and pump assemblies will be installed in the location of the existing tank and pump assemblies.
U02 powder sampler U02 powder sampler U02 powder sampler U02 powder sampler
2018 CCF Approved by Engineer for Startup Name Title Description 16197 Line s_Mo_isture Sampler The_sensor ~ill be removed. The determination that a sample has been Mod1f1cat1on retneved w1ll rely only on another sensor.
16306 Demo of Abandoned HF This CCF will demo the remaining abandoned 2" lined piping transfer line.
Transfer Line-URRS Modify Cathode Ground 16392 Shield Remove 0.125 mches from top edge of each long s1de of ground sh1eld.
R53 Press Core Rod 16437 Holder Design Modification 16442 Wash Tanks Electrical Modification 16492 Line 1 Dust Collector Chute Replacement 16609 CL1 - Calciner Safety Upgrades 16663 IFBA COATER SSC Extraction Change the Core Rod Holder Base and Nut hex from 31/64" to 1/2".
This CCF covers the electrical modifications to tanks 1, 2 and 3.
Replace OEM Dust Collector Chute per For Construction drawings.
Install new valving and instrumentation to improve safe operation of C-109 Calciner and adjacent equipment.
Separate the code in the IFBA Area application that deals with Coater SSC's.
Justification The sensor currently in use is obsolete.
Clutter reduction on the pipe rack and in the Waterglass Building and eliminate source of unknown contamination that could be construed as HF.
Increase gap between target retainer and ground shield.
To have a standard size hex and eliminate the need for an uncommon size wrench.
The wash tanks are obsolete and require replacement.
OEM chute is cracked and requires replacement.
This CCF continues capital safety upgrades previously completed on CL2/3/4/5.
Identify and separate programming that deals with SSC's.
and new PLC. Relocation of 480V SCR and other 120V and higher Replacement of the Drum Controller and current PLC with a graphic terminal dd b
To a ress 0 solescence and Safety ADU Sintering Furnace 16664 3C Controls and Power Improvement components to a safer location. Some furnace rebuild components (specifically switches, valves and transmitters) are being included in the scope of this CCF.
Concerns and rebuild upgrade issues Page 3 of 37
!SAID ISA-03 ADU Conversion ISA-06 Chemicals Receipt, Handling and Storage ISA-14 IFBA Processing ISA-08 Pelleting ISA-17 Final Assembly ISA-01 Plant Ventilation System ISA-03 ADU Conversion ISA-14 IFBA Processing ISA-08 Pelleting Location U02 powder sampler South of the main process building (outside) and in the Waterglass Building F291FBA/FA 1 Pelleting-RS3 Press FA Wash Tanks ADU Pelleting-/-Line 1 Dust Collector Conversion Line 1 Calciner IFBA/FA1-for "Zone Area Process" this change will be for all coaters.
Pellet Sintering Furnace 3C
Name Title 16741 Erbia FL-9407 Filter House Modification 16742 Erbia FL-94~4 Filter House Mod1ficat1on Description 2018 CCF Approved by Engineer for Startup Justification This filter house has a bag-in/bag-out design to aid in filter removal. However, the design is for removing the pre-filter and HEPA filter simultaneously, which is currently not Remove the bag-in/bag-out system from each filter bank in the Erbia FL-9407 allowed. Removal of the bag will not affect filter housing and replace any wire mesh pre-filters and HEPA filters with our the form, fit or function of the filter housing standard S/R # 21230 pre-filter and S/R # 21500 HEPA filters.
and filters. Elimination of the wire mesh filters will eliminate the separation of the wire from the burnable material.
This filter house has a bag-in/bag-out design to aid in filter removal. However, the design is for removing the pre-filter and HEPA filter ISAID ISA-01 Plant Ventilation System Remove the bag-in/bag-out system from each filter bank in the Erbia FL-9404 simultaneously, which is currently not ISA-01 Plant Ventilation filter housing and replace any wire mesh pre-filters and HEPA filters with our allowed. Removal of the bag will not affect System standard S/R # 21230 pre-f1lter and S/R # 21500 HEPA filters.
the form, f1t or funct1on of the f1lter housmg and filters. Elimination of the wire mesh filters will eliminate the separation of the wire from the burnable material.
Installation of Sintering Install Electncal W1reway from PLC Furnace Room to Entrance End of Control Power and Controls (both Safety and BPCS) are being fed from the Furnace PLC Wireway 16745 Furnace Infrastructure 1 4 (A
& C)
Furnaces -
, B, 1706s UT2 Tank Heater Thermostat Upgrade This CCF will replace the obsolete mechanical thermostat device with a new temperature controller for the UT2 Tank Heater.
17073 I
1 Replace the two level probes in the elevator with fork level probes using Rep ace Lme 1 E evator d
ft I different manufactures (PELPREP-106 and PELPREP-107). Replace control Pow er Li SSC Contro s wiring assoc1ated w1th the Elevator Shaft Door Closed sse PELPREP-914.
Ammonia Still Product Re-configure ammonia product piping inside Still1 building (relocated to 1707S p*.
"d b "Jd"
)
h. fl 1pmg outs1 e u1 mg, removmg arc a1c ow meters.
room to allow adequate room for additional ISA-08 Pelleting controls and to eliminate control panels on the factory floor.
The existing thermostat is obsolete. It will be replaced with a current model of digital ISA-10 ADU Rods temperature controller.
The existing two level probes in the elevators II ISA-08 Pe eting are not failsafe.
Ammonia product lines are overly complex ISA-06 Chemicals Receipt, and contain archaic flow meters.
Handling and Storage Page 4 of 37 Location Erbia/FL-9407 Erbia/FL-9404 Chemical Side-Pelleting QC Rods UT2 Pellet Line 1 URRS Outside/Still1 Building
Name Title ADU Line 5 Dust 17087 Collector Fork Level Installation 2018 CCF Approved by Engineer for Startup Description Replace the obsolescent high and high, high level probes on ADU line 5 dust collector. Install a new control panel with individual alarms and controls for each level probe.
Justification ISAID The manufacturer no longer supports certain ISA-01 Plant Ventilation critical parts associated with these probes.
System k Replace the obsolescent high and high, high level probes on SOLX Dust SOLX Torit DC-936 For 17088 Collector DC-936. Install a new control panel w1th md1v1dual alarms and The manufacturer no longer supports certain ISA-01 Plant Ventilation Level Installation URRS DC-993A and DC-17089 993 B Fork Level Installation 17090 SOLX DC-1070 Fork Level Installation 17099 Replace waste storage columns V-1014A-E.
17100 Replace waste storage columns V-1015A-E.
Rod Weigh 17104 Programming Station Installation VFS1 Control Systems 17109 Upgrade 17126 Inspection Equipment (H) replacement.
controls for each level probe.
critical parts associated with these probes.
System Replace the obsolescent high and high, high level probes on URRS Dust Collector DC-993A and DC-993B. Install a new control panel with individual alarms and controls for each level probe.
The manufacturer no longer supports certain ISA-01 Plant Ventilation critical parts associated with these probes.
System Replace the obsolescent high and high, high level probes on SOLX Dust Collector DC-1070. Install a new control panel with individual alarms and controls for each level probes.
The manufacturer no longer supports certain ISA-01 Plant Ventilation This project will replace each existing column with a 8" diameter schedule~ 40 316L, PTFE lined vessel. The section of the frame supporting the V-1014 critical parts associated with these probes.
vessels will also be modified. After all sections have been modified, the The existing tanks have deteriorated and support frame will meet the criteria of FSS-018 Seismic Design Specifications.
h ld b 1
d The stainless steel discharge piping will also be replaced with PTFE lined 316L s au e rep ace
- stainless steel piping. A temporary barrier will be installed to protect the line 5 decanter hydro motor during this project.
This project will replace each existing column with a 8" diameter schedule~ 40 316L, PTFE lined vessel. The section of the frame supporting the V-1015 vessels will also be modified. After all sections have been modified, the The existing tanks have deteriorated and support frame will meet the criteria of FSS-018 Seismic Design Specifications.
h ld b 1
The stainless steel discharge piping will also be replaced with PTFE lined 316L s au e rep aced.
stainless steel piping. A temporary barrier will be installed to protect the line 5 decanter hydro motor during this project.
Installation of Programming Station for Rod Weigh and QC Rod PLCs.
Facilitate maintenance troubleshooting of Rod Weigh and nearby Rod Soft Handling equipment.
The scope of this project is to upgrade the current obsolete electrical control Many components on VFS1 are obsolete and system to the latest manufacturer's standards.
some not available anymore.
In the grid area, replace existing Inspection Machine (H) with a new Inspection Machine (P) that is of similar model and has the same footprint.
This is part of the overall inspection process System ISA-11 Scrap Uranium Processing ISA-11 Scrap Uranium Processing ISA-10 ADU Rods Components The new unit also uses the same utilities.
improvement plan (Quality at the Source) in Components the grid area.
Page 5 of 37 Location ADU line 5 Dust Collector FL-936 SOLX Area South West Decon Area FL-993A and FL-993B SOLX Dust Collector DC-1070 Conversion Scrap Cage Conversion Scrap Cage QC Rod Soft Handling Section "A" near existing Programming Station Zirc Clean and Anneal room.
Grid Inspection area
2018 CCF Approved by Engineer for Startup Name Title Description Justification In the grid area, replace existing VIEW Inspection Machines (K,I,B,J,L,M,N)
VIEW Inspection 17127 Equipment (J,K,L,B,M,I,N) replacement.
with new VIEW Inspection Machines (Q,R,S,T,U,V,X) that are of similar model This is part of the overall inspection process and have the same footprint. The new units also use the same utilities (air and electrical).
improvement plan (Quality at the Source) in the grid area.
17128 Simplex System Control Replace old control zam part number 2190-9163 with new control zam part Control zam 2190-9163 is no longer ZAM Parts Replacement number 4090-9008.
manufactured.
17130 The V-1006A/B Precipitation Tank Frame drawing has been confirmed to meet FSS-018 requirements per CN-PEUS-17-01, "Seismic Seismic Analysis for Physical modifications to the frame for the liquid scrap tanks were made to Qualification of Precipitation Tank V-1006A-B Scrap Cage Liquid Waste the frame under CCF!s 17097, 17098, 17099, and 17100. Since the seismic Support Frame per CFFF FSS-018.
Column and analysis was performed on the fully modified frame only, the documentation A new V-101 Scrap Cage Liquid Waste Precipitation Tank of the analysis is accomplished through~ this CCF.
Column Frame drawing 333F08ST01, Rev. P1 Frames has been created from sketches SKF-95164, sheets 1 and 2, and has been confirmed to meet FSS-018 requirements per CN-PEUS 02, "Analysis and Design Modification of Scrap Cage Tanks Support Frame."
Regular sanitization of the river discharge
!SAID Components Grounds ISA-11 Scrap Uranium Processing Stock and Use Granular 17134 Chlorine for the Lagoon Stock and Use Granular Chlorine for the Lagoon Systems.
vessels with granular chlorine will assure that h
1 ISA-06 C emica s Receipt, there are not pockets of bactenal growth Systems that can short circuit in-line chlorination processes.
17142 Remove BET-3 and In LINES room of main Chemical Lab, remove BET-3 model MS-21. Replace b 1 d
BET-3 is o so ete an past it!s shelf life.
Replace W1th New Unit~ w1th new un1t, BET-6 model MS-22.
Modify Line 9 Rod 17143 Repair Lathe Cutoff to add Counter 17156 Remove BET-4 and replace with new unit~
By adding a counter similar to the repair lathe in ADU, this will allow the area to enable an alarm to alert the operators to change the blade after 7 cuts.
In LINES room of main Chemical lab, remove BET-4 model MS-21. Replace with new unit, BET-7 model MS-22.
f Replace the current vacuum pumps on the laser welders and perform Retro it Grid laser #6 to Ensure better quality on reworks and minimize COPQ.
BET-4 is obsolete and past it!s shelf life.
Original vacuum pump for the Grid laser Handling and Storage ISA-18 Laboratories Components ISA-18 Laboratories 17160 Accommodate New and required mod1ficat1ons on the lasers to accommodate the new pumps.
Existing Vacuum Pump Machines is obsolete and no longer available Components from the manufacturer.
Page 6 of 37 Location Grid View Inspection Fire protection plant-wide ADU Conversion Scrap Cage River Discharge Chern Lab-LINES Room Tube Prep Repair lathe Chern Lab-LINES Room Grid Area, laser W6
2018 CCF Approved by Engineer for Startup Name Title Description Justification ISAID Chilled Water Tie-In for 17183 Relocation of Piping Add Tie-In to allow relocation of chilled water piping above Bulk Room.
Bulk Room is a moderation control area.
ISA-OS ADU Bulk Powder Blending from Above Bulk Room Modify Slide Windows 17194 on the Front of the Blu-M Oven Hood for Pl2 Modify the existing design and install a quantity of 5 smaller slide windows, Allow for easier access to hood without which are similar to PLN5 auto-prep hood.
modifying the face velocity to the hood.
ISA-03 ADU Conversion Currently, operators have to start and stop 17197 P-1362B Start/Stop Add a local start/stop button on P-1362B, Dl Water recirculation pump.
the pump using the breaker, a potentially unsafe action.
Grounds 17202 IFBA Moisture Analyzer Replace old control moisture image series unit with new moisture image line 7 (Dry Box) series unit.
Install a Chlorinator on 17204 the East Lagoon Install a Chlorinator on the East Lagoon Recirculation line.
Recirculation line Temporary installation of Carbon/Sulfur 17209 Relocate Carbon/Sulfur analyzer m chem lab.
analyzer in the Chern Lab Replace Breaker in RP3-17216 4E for S-1030 Drive Replace Breaker in RP3-4E for S-1030 Drive Building AC unit on Roof.
Building AC Unit on Roof Replace Carbon/Sulfur 17222 Analyzers with 2 new Replace Carbon/Sulfur Analyzers with 2 new Carbon/Sulfur Analyzers.
Carbon/Sulfur Analyzers Replace Discharge and Replace Discharge and Recirculation Piping on Conversion Scrap Tank V-1015 17225 Recirculation Piping on with New Piping and change drawing 333F08PI01, sheet 01, note 3 to show Conversion Scrap Tank V* the affected change.
1015 with New Piping Replace Scrubber 2A 17229 and 2B Sump Level Controls 17232 Coater 1 Controller Replacement 17233 Coater 2 Controller Replacement Replace Scrubber 2A and 2B Sump level Controls.
Replace Coater 1 Controller with an up-to-date version controller.
Replace Coater 2 Controller with an up-to-date version controller.
The older moisture image series is no longer ISA-12 IFBA Fuel Rod manufactured and the 2 on-site are nearing Manufacturing their end of life.
The current process does not provide adequate surface area chlorine tablet contact Grounds and does not provide a consistent dosage of Chlorine.
Verification of new Carbon/Sulfur analyzers to replace old obsolete Carbon/Sulfur ISA-18 laboratories analyzers.
Existing Breaker is sized at 30A, the ISA-01 Plant Ventilation manufacturer of the equipment recommends the maximum breaker size be 20A.
Replacing two old obsolete analyzers with two new analyzers.
System ISA-18 laboratories Replacement with new SS exterior piping is a ISA-11 Scrap Uranium significant improvement for lifespan.
Processing The current level controllers are pneumatic, ISA-01 Plant Ventilation obsolete, and not working properly.
System The older controllers are obsolete.
ISA-14 IFBA Processing The older controllers are obsolete.
ISA-14 IFBA Processing Page 7 of 37 Location Chilled water lines above bulk room Blu-M hood on the front end of Pellet line 2 URRS Outside/DI Water Building IFBA line 7 Drybox Outside URRS/ East Lagoon Chern Lab Panel is in S-1030 Drive Building and the breaker is for the AC unit that services the drive building Chern lab V-1015 Conversion Scrap Cage Scrubber 2A and 2B sumps in the conversion area scrap cage Coater 1 Coater 2
Name Title Dew Point Analyzer 17274 Replacement on Thermal Stability Furnace A Install New Testing 17275 System in Position #2 in PE Lab 17279 Implement Rod Pulling Device in PE Lab Individual Disconnect 17282 Installation for Waste Treatment Aerator's 1 and 2 17284 Relocate AC unit compressor 17286 C401A Vaporizer Lid Hold Down Bolts UN Bulk Storage 17301 Containment Modification 17309 V1014 Recirculation Piping Replacement 17310 V.1~17 Recirculation P1p1ng Replacement 17311 V1018 Recirculation Piping Replacement 17314 Power Monitoring Replacement 2018 CCF Approved by Engineer for Startup Description Justification ISAID Replace obsolete dew point analyzer model with newer series 5 on Thermal Existing part is obsolete and at the end of ISA-08 Pelleting Stability Furnace A.
life.
Install New Testing System in Position #2 in PE Lab.
Previous system was outdated and needed to b
b I
d ISA-18 La oratones e rep ace.
Design and fabricate new portable tool for the Product Engineering Test Lab The PE Test Lab currently has no safe method to load and unload beginning-of-life (BOL) fuel assemblies for full scale tests. of loading or unloading BOL assemblies.
ISA-18 Laboratones Install individual disconnects for waste treatment aerators 1 and 2.
Relocate AC unit compressor by doors at UF6 Bay.
Add three hold down bolts and replace the old hold down tabs.
Modify UN bulk storage containment to increase capacity.
Replace recirculation piping and discharge piping on Conversion Scrap Tank Pump P-1014 to Conversion Scrap Tanks V-1014C-E, V-1014A-B.
Replace recirculation piping and discharge piping on Conversion Scrap Tank Pump P-1017 to Conversion Scrap Tanks V-1017C-E, V-1017A-B.
Replace recirculation piping and discharge piping on Conversion Scrap Tank Pump P-1018 to Conversion Scrap Tanks V-1018A-E.
Replace power monitoring equipment (in Equipment Room #1) with a new power monitor.
Creates LOTO point and ability to maintain process while performing maintenance to individual motors.
Grounds This relocation will provide area to land loads from new monorail hoist.
Grounds This modification will bring the total amount of hold down bolts to 9, which is similar to the lines1 & 2 vaporizers, which each have
- 10.
The containment need to be enlarged to contain the majority of the tank's volume to protect the environment from an event.
Existing 304 stainless steel pipe is deteriorating at a rapid rate causing numerous leaks.
JSA-03 ADU Conversion ISA-02 Uranyl Nitrite Bulk Storage Tanks ISA-11 Scrap Uranium Processing Existing 304 stainless steel pipe is deteriorate ISA-11 Scrap Uranium at a rapid rate causing numerous leaks.
Processing Existing 304 stainless steel pipe is deteriorate ISA-11 Scrap Uranium at a rapid rate causing numerous leaks.
Current power monitoring equipment is obsolete.
Processing Grounds 1
bl d
Add track extension to Loader 4 for the gore track in Final Assembly Area.
17332 Fma Assem y La~ er 4 To keep the gore track from sagging into the ball screw once the carriage travels to the forward position.
JSA-17 Final Assembly Gore Track Extension Page 8 of 37 Location Thermal Stability Furnace "A" PE Development Lab PE Development Lab Waste water treatment aerators 1 and 2 Area by back door outside of UF6 Bay C401A Vaporizer URRS outside bulk UN storage containment Conversion Scrap Cage Conversion Scrap Cage Conversion Scrap Cage Equipment Room #1 adjacent to MCC-7702 Loader 4
Name Title New Ramp from 17333 Convers.ion Platform (north s1de) to Roof Level PLN3 Tray Conveyor 17344 Modified Pans Installment PLNS Tray Conveyor 1734S Modified Pans Installment Dl Water System 17348 Modifications 17356 Tube Prep Area Modifications 17357 Removal of electrical components, wiring, mechanical components and piping on ADU Sintering Furnace 1A Removal of electrical 2018 CCF Approved by Engineer for Startup Description Install new access ramp from conversion platform to roof level.
Install modified pans on the pellet line #3 tray conveyor to allow for improved back end ECOs.
Install modified pans on the pellet line #5 tray conveyor to allow for improved back end ECOs.
This CCF will serve as a Pre-Approved Level 2 Modification for any changes in Justification Safety project that will mitigate at-risk behavior and at-risk conditions for ISAID ISA-01 Plant Ventilation employees while transitioning new and spent System S-1030 filters to and from platform.
Eliminate pinch points and Improve effectiveness of line ECOs.
Eliminate pinch points and Improve effectiveness of line ECOs.
ISA-08 Pelleting ISA-08 Pelleting the Dl Water System in Outside URRS, including the Dl Water Building The Dl Water System as bounded by this CCF Operation and the Dl Water Trailer Operation.
contains no uranium, and contains no Safety Grounds Significant Controls.
This CCF is to set the requirements for a Pre-Approved Level 2 Modification that allows future work to be performed in the Tube Prep area with an appropriate graded level of review and approval.
Remove all electrical components and wiring. Additionally, remove process piping and valves, along with brick and heating elements.
The CFFF configuration management process allows for an appropriate graded level of review and approval for certain types of modifications.
The furnace is in need of a complete rebrick and heating element replacement.
Components ISA-08 Pelleting components, wiring, Re~ove all electrical com~onen.ts and wirin~. Additionally, remove process The furnace is in need of a com lete rebrick 17361 mechamcal components p1p1ng and valves, along With bnck and heatmg elements. Remove pellet pan d h 1
1 P
ISA-08 Pelleting and piping on ADU storage shelves on one side.
an eatmg e ement rep acement.
Sintering Furnace 3A ADU Sintering Furnace 1A Controls and Power To address Obsolescence and Safety Replace the drum controller and current PLC with a graphic terminal and new Concerns and upgrade issues.
17362 Improvement and Major PLC to include other additions and upgrades as required.
Furnace Rebuild 17367 Chiller #7 (Equipment Room #3) Demo Disconnect Chiller #7 piping from the chilled water and condenser water headers. Disconnect electrical wiring and conduit from Chiller #7 starter panel. Dismantle the chiller into 3 pieces: evaporator, condenser, and compressor/motor.
Chiller #7 is not economical to repair.
Page 9 of 37 ISA-08 Pelleting Grounds Location Directly adjacent to the weigh scales for the S-1030 spent filters on north side of conversion platform. Roof bay C-D and S-6 Pellet Line #3 at Pellet Tray Conveyor between Grinder and D&V Station Pellet Line #5 at Pellet Tray Conveyor between Grinder and D&V Station Dl Water/Outside URRS Tube Prep area as marked on attached drawing Chemical Side - Pelleting-ADU Sintering Furnaces Chemical Side - ADU Pelleting Pellet Sintering Furnace 1A Equipment Room #3
Name Title 17370 Chiller #6 (Equipment Room #3) Demo 2018 CCF Approved by Engineer for Startup Description Justification ISAID Grounds Remove the refrigerant from Chiller #6. Disconnect Chiller #6 piping from the h f
f.
T e source o numerous a1lures has not ch1lled water and condenser water headers. Disconnect electncal w1nng and b d
d d h een etermme an t e mach1ne IS not conduit from Ch1ller #6 starter panel. Dismantle the ch1ller mto 3 pieces:
reliable.
evaporator, condenser, and compressor/motor.
d d
h Add a sensor to the existing CRMS Computer to allow direct input of rod Automate Ro Lengt 1
h Eliminate numerous manual rod length entries.
17371 Measurement at Rod Inspection 17373 FL-9405A Inlet Duct Elbow Repair 17376 IFBA Oxidation Oven Replacement Ribbon Blender/ECO 17378 Assist Gantry Installation 17380 IFBA Oxidation Oven Replacement 17386 Fire Pump _H_ouse #2 Alarm Add1t1ons Install additional tabs on 17390 C301A like Line 4 CCFs 17278 & 17286 Modify West II to West I 17394 Discharge Line to Accommodate Cleanout engt.
Seal crack on FL-9405A inlet duct elbow(galvanized material) with fiberglass The elbow has a stress crack that can suck 470 vinyl ester resin and cloth.
water in, if not sealed.
Replace IFBA Oxidation Oven.
The existing oven is obsolete.
Install ribbon blender/ECO assist gantry Safety/operator ergonomics improvement.
ISA-10 ADU Rods ISA-01 Plant Ventilation System ISA-19 Hoods and Containment ISA-08 Pelleting Move rack currently across aisle from the oven to the south by 24 inch andre-Rack must be moved to provide space for the ISA-12 IFBA Fuel Rod anchor to floor and rotate Champs station to face south.
oxidation oven control panel.
Manufacturing Tie Fire Pump #2 Common Trouble Alarm and Fire Water Tank T-8208 low level alarm into the CFFF fire alarm system and upgrade the obsolete monitoring devices being useon the Fire Pump #2 system.
This CCF will add an additional three tabs for C301A.
Modify West II to West I Discharge line to accommodate cleanout.
Fire Protection Improvements.
Additional tabs will improve the sealing efficiency of the lid.
Solid buildup causes restrictions that limit pump out capacity from West II to West I.
Page 10 of 37 Grounds ISA-03 ADU Conversion Grounds Location Equipment Room #3 Mechanical Side-Final Rod Inspection FL-9405A Elbow IFBA Oxidation Oven Pellet Line 4, Ribbon Blender Hood IFBA oxidation oven Fire Pump House #2 Line 3 "A" Vaporizer West I and West II Lagoon
2018 CCF Approved by Engineer for Startup Name Title Description Justification Furnace Area Filter 17396 House FL-2276, filter Replace the existing differential pressure gauge/switches with the functional The existing gauges cannot be read in the differential pressure equivalent gauge/switches.
sunlight.
measurements upgrade, Furnace Area Filter 17397 House FL-2278, filter Replace the existing differential pressure gauge/switches with the functional The existing gauges cannot be read in the differential pressure equivalent gauge/switches.
sunlight.
measurements upgrade~
Furnace Area Filter 17398 House FL-2279, filter differential pressure measurements upgrade~
Replace the existing differential pressure gauge/switches with the functional equivalent gauge/switches.
17403 Ladder Replacement FL-Replace ladder with stairs at FL-S922 platform located near the Chemical 5922 Platform Development area.
11
- 1.
Replace the existing failed liner from the cold water basin in Still #1 cooling m St1 #1 Coo mg Tower 17405 Cold Water Basin Liner tower.
Replacement 17412 Scrap Cag~ Oxidation Oven Testmg Test a different filter media to determine if the different filter media will lengthen the service life of the filter.
ADU 1B F C
I.
Replace existing element leg cooling glands with new, improved cooling urnace oo mg 17416 Water Modification glands.
Remove disconnect and electrical panel for abandoned ash reidue dissolver Ash Residue Dissolver in the old chemical Development Lab.
17422 Disconnect and Electrical Panel Removal VIPER Dual Assembly Hexagonal Housing-17425 Partial assembly wall and Simulated Bottom Nozzle Modification Modification of Frame Modify the VIPER dual assembly hexagonal flow housing partial assembly wall.
The existing gauges cannot be read in the sunlight.
Existing ladder does not meet today's standards.
The existing cold water basin liner in Still #1 cooling tower has failed.
Part of the CO program reducing uranium bearing materials going to the S-1030.
New cooling glands will be able to compensate for alignment issues, provide improved sealing and improved cooling.
The panel and disconnect need -to be removed to make way for a stairway.
To accommodate different grid elevations from the fuel that was previously tested, as well as a new simulated bottom nozzle.
The clearance in front of the heating element ISAID ISA-01 Plant Ventilation System ISA-01 Plant Ventilation System ISA-01 Plant Ventilation System ISA-18 Laboratories Grounds ISA-01 Plant Ventilation System ISA-08 Pelleting ISA-18 Laboratories ISA-18 Laboratories 17437 for ADU Sintering Modify ADU Sintering Furnace 1A frame.
Furnace 1A controls cabinets and their supports needs to ISA-08 Pelleting be a minimum of 42 inches.
Page 11 of 37 Location Sintering Furnace Filter House FL-2276 on the Roof Sintering Furnace Filter House FL-227 on the Roof Sintering Furnace Filter House FL-2279 on the Roof Chemical area near Chemical development lab.
Ammonia Still #1 Cooling Tower These two units are located in the scrap cage area in the conversion area ADU Pelleting 1B Sintering Furnace Chemical side, between the Electrical step off pad and the Maintenance step off pad~
VIPER Loop-Product Engineering Development Lab Chemical Side - Pelleting Area (ADU Sintering Furnaces)
2018 CCF Approved by Engineer for Startup Name Title Description HF storage tank T-1174 Increase to the Install an orifice in the air line to diaphragm pump P-1192 to set an upper 17439 I f95%
I".
h 15 Max1mum Leve o o
1m1t on t e a1r pressure at ps1g.
filled Chiller #7 (Equipment 17440
)
1 Install a new 500 ton ch1ller.
Room #3 Rep a cement Chiller #6 (Equipment 17442
)
1 Install a new 500 ton chiller.
Room #3 Rep a cement New TP BAR Vibratory 17443 Feeder and Vacuum Install new Vibratory Feeder and Vacuum Pump in TP BAR.
Pump 17446 Installation of an 02 Monitor in TPBAR Provide power and installation of an 02 monitor and sensor near the area the pellet storage containers will unpacked and refilled.
Remove the refrigerant from Chiller #5. Disconnect Chiller #5 piping from the Justification JSAJD We were not able to completely unload the last delivery truck before the level in the tank h
ISA-06 C emicals Receipt, reached 80%. Our contract with the HF dl d
Han ing an Storage vendor requires that he return with an empty tank.
Current #7 centrifugal chiller utilizing R134a is not economical to repair.
Current #6 centrifugal chiller utilizing R134a is not economical to repair.
To support new campaign requirments.
The addition of an oxygen monitor in the area is somewhat beneficial but not required for improving safety, regulatory compliance and/or operability.
Grounds Grounds Components Components 17447 Chiller #5 Demo (Equipment Room #3) chilled water and condenser water headers. Disconnect electrical wiring and Current #5 centrifugal chiller utilizing Rl34a Grounds conduit from Chiller #5 starter panel. Dismantle the chiller into 3 pieces:
evaporator, condenser, and compressor/motor.
17448 Do~r Chamfer Late~.
Add chamfer on door latch swing bolt slot on 418F10EQ04, Item 184, door Swmg Bolt Slot Add1t1on yoke wear block.
17457 Steam Bypass Valve Replace C-40~B steam bypass valve (XV-401B-1) with ball valve identified in Replacement FSS-003-16 Piping Spec.
Chiller #5 (Equipment 17459
)
1 Install a new 500 ton ch1ller.
Room #3 Rep acement Close system isolation valves in Equipment Room #3 and drain chilled water supply and return hoses for the rental chiller. Remove chilled water supply Removal of Rental f
and return hoses from rental ch1ller to system 1solat1on valves. Remove the 17466 Chiller rom Equipment 400 ton air cooled ch1ller and generator for Equ1pment Room #3 from s1te.
Room #3 BWR Magazine Track 17468 and Cart Guides Remove the BWR track and rod channels for carts.
Removal is not economical to repair.
Door seal leaks.
Steam bypass valve was leaking.
- 5 centrifugal chiller utilizing Rl34a is not economical to repair.
Rental chiller is no longer needed.
To prevent a tripping injury.
Page 12 of 37 Grounds ISA-03 ADU Conversion Grounds Grounds ISA-17 Final Assembly Location Outside in the HF diked area Equipment Room #3 Equipment Room #3 TP BAR TPBAR facility Equipment Room #3 Grid area, laser welders ADU Line 4, C-401B Vaporizer, Valve# XV401B1 under grating Equipment Room #3 Equipment Room #3 Bay E-F & 11-12 BWR Rod Loading
2018 CCF Approved by Engineer for Startup Name Title Description Justification ISAID S2A/2B Bag Filters Blow Install air regulator in the instrument air line that supplies air to the 2A/2B 17470 I
b f"l
. c Air regulator will be used to prevent blowing ISA-01 Plant Ventilation 120 psi air into the bottom of the cyclone Down Air Regu ator ag 1 ters m onvers1on area.
separator.
System Vacuum Mounted 17471 Rotary Turbine Type Pneumatic Vibrator on Bulk Feed Tanks Provide a more robust and reliable vibrator Allow for use of vacuum mounted rotary turbine type pneumatic vibrator on for operations to use for processing the ADU ISA-08 Pelleting bulk feed tanks.
bulk feed tanks.
2A/2B Scrubbers' Access Install access door on duct openings 89 and 90 on the duct from the S-2A/2B h
d"ff" 1
h dl ISA-01 Plant Ventilation 17472 II bb T e temporary covers are 1 1cu t to an e.
Doors I nsta ation scru ers.
System Scrap Cage Tanks V-17473 1017A-E, V-1018A-E, and V-1006B Elbows Installation 17476 Laser Welder #3 Door Latches Modifications 17477 VF5-1 Vacuum Valve Replacement Change in Incinerator 17478 Quench Column refractory brick replacement 17479 Portable Refueling Station Purchase 17480 Strap M~king Stations Installation 17482 1030 Ch.eck Valve Installation Install elbows in weep holes on scrap cage tanks V-1017A-E, V-1018A-E, and V-1006B.
Modify door latches on laser welder #3 to add clearance for swing bold base circle by adding a chamfer to the item 184 door latch wear block.
Replacing current Main Gate Valve on VFS1 with new valve Part Number:
LPWA-10A-ASA-N8-20-V-EP-110-TAP.
Repair the refractory brick in the incinerator quench columns.
Increases personnel safety.
Allows a potentially tighter seal of the door to the door gasket.
Control System upgrades.
The refractory brick is eroded and needs to be replaced.
The Portable Refueling Station is a dispensing Purchase Portable Refueling Station that adheres to the applicable codes and method to pump No. 2 Fuel Oil to Facilities standards.
Install Strap Marking Stations in Grid Build Stations #1 and #2.
Install a check valve in the pipe that goes from the 1030 pumps to Q tanks.
equipment such as the fire pumps, generators and air compressors.
Additional need.
The check valve will prevent back flow from the -1005 pumps to the 1030 scrubber system.
ISA-11 Scrap Uranium Processing Components Components ISA-13 Low Level Radioactive Waste Processing Grounds Components ISA-01 Plant Ventilation System 17483 Check Valve in 10~0 Bag Install a check valve in the blowdown pipe that goes from the 1030 filters to The check valve will prevent backflow from ISA-01 Plant Ventilation Filter Blowdown p1pe.
tank V-1030E.
the tank to overflow the filters.
System Laser Welder #5 Modify Door latches on laser welder #5.
Allows a potentially tighter seal of the door 17484 Modification to the door gasket.
Components Laser Welder #6 Modify Door latches on laser welder #6.
Allows a potentially tighter seal of the door 17485 Modification to the door gasket.
Components Page 13 of 37 Location 2A/2B Scrubber Bag Filters Bulk Container Enclosure/Bulk Containers on ADU Pellet Lines 1, 2, 3, 4 and 5 Roof Scrap cage Grid Area Zirc Strap Cleaning & Annealing Incinerator room Portable Refueling trailer will be attached to golf cart, truck, or tractor Grid Braze Station STN4240 and STN4241 within Bays 17-18 and B-C Scrap Tank Area Conversion at filter FL-1030CX area Mechanical Side Grid Area Mechanical side grid area
2018 CCF Approved by Engineer for Startup Name Title Instrumentation holes 17488 Addition to the Hexagonal FACTS Flow Housing 17491 Demo FN962 to allow it to be replaced.
S402S Plating Room 17492 Scrubber Fan Replacement Description Add additional instrumentation holes to the hexagonal FACTS flow housing.
Remove FN962 from roof to allow for installation of a new fan.
Replace the epoxy coated carbon steel fan at S4025 Plating Room Scrubber with the FRP fan as designed.
Justification ISAID Addition of 6 new displacement transducers. ISA-18 Laboratories Existing fan and motor that makes up FN962 ISA-01 Plant Ventilation is oversized.
System Current hood is obsolete.
Components 17493 FN962 Replacement Fan Instal laton currently used.
Install fan and add VFD to control the fan instead of damper system, which is E..
f
. d x1stmg an 1s overs1ze.
ISA-01 Plant Ventilation System Demolition of 17494 Incinerator System 6A Permanently remove ductwork associated with the incinerator 6A system.
Ventilation Incinerator 6A 17495 Ventilation Modifications Reconfigure Incinerator 6A Ventilation.
Elevated Drain Screens Redesign and fabricate the current basket and elevated screens to prevent 17498 E h V f.1 In ac aponzer common cause a1 ure.
17499 Level probe replacement Replace probe with level switch for high level interlock.
This work is in preparation for installation of ISA-01 Plant Ventilation new duct, demisters, duct heater, and filter System houses.
Chloride Stress Corrosion Cracking (CSCC),
inefficient dewatering system, heater failures.
Installing elevated drain screens would eliminate common cause failure of the drains ISA-01 Plant Ventilation System and allow for crediting both drains ISA-03 ADU Conversion independently in the Criticality Safety Evaluation.
The new probe is more reliable.
ISA-08 Pelleting 17503 Dissolver XV-5-748A/B Removable Guard Rail To prevent damage to valves identified in Install a 3' high X 4'5-1/2" wide removable guard rail (powder-coated yellow). ARC 100396442_
ISA-07 Solvent Extraction Pellet (Tray) Casket Cart 17505 d"f" Add two add1t1onal sw1vel casters and repos1t1on the f1xed casters.
Mo 1 1cat1on Scrap Cage Oxidation 17509 Oven Platform and Plenum reorientation Addition of a platform over the scrap cage oxidation oven hood and rotate the two plenums 180 degrees.
17512 Viper Loop lnt:rposing Install a new interposing relay between _the Fire Alarm Zone Addressable Relay Installation Module and the motor starter for the V1per Loop roof exhaust fan.
Additional maneuverability is needed from the carts.
Part of the Confirmatory Orders, uranium carryover mitigation efforts.
Premature failure of the fire alarm zone ISA-08 Pelleting ISA-19 Hoods and Containment addressable module due to current load from Grounds motor starter.
Page 14 of 37 location PE lab, Facts Loop Roof Above Plating Room Roof From the absorbers in the incinerator room to the vent stack on the roof above the penthouse Incinerator room and penthouse Both Vaporizers on Conversion Lines 1-4 Pellet Sintering Furnace 1B XV-S-748A/B valves near main aisle CFFF, Pelleting, Pellet/Tray Transportation Between the scrap cage oxidation ovens and the S1008 platform Viper Loop in PE Lab
Name Title Beryllium Fume Hood 17S14 Replacement in Non-Fuel Area 2018 CCF Approved by Engineer for Startup Description Replace Beryllium Fume Hood in Non-Fuel Area with new Ductless Fume Hood.
This CCF will allow the substitution of non-SSC Control Valves.
Evaluation Criteria the valve must physically fit, perform the intended Justification Hood has been purchased.
This CCF would give the CFFF the ability to substitute control valves which could provide Substitution for non-SSC process function, be constructed of materials which are compatible with the _us many benefits; longer life, better 17S1S Control Valves process, and be compatible the process control function.
performance, increase uptime, and allow for replacement of obsolete (i.e., unavailable) valves with readily available units.
17517 Conversion Decanter Rotating Assembly Pelleting Furnace SA 17S18 Door Slave Pilot Piping and Programming Modifications.
Document a new rotating assembly that has been manufactured from reverse engineered drawings. The new rotating assembly could be used on any of the decanters.
Modify the natural gas piping for Furnace SA load and unload door slave pilots. Install programming updates to SIS and BPCS PLCs.
This is a replacement assembly for the decanters.
To provide fully independent adjustment of the slave pilots and improve their reliability.
Modifications are being implemented to address a customer observation in which a Vibratory Bowl Feeders Modify the bowls on pellet lines 1-6 and Erbia/lme 7's Vibratory bowl feeders 1
II f
d
- k.
17S20 rogue annu ar pe et was oun stuc m one Modification to elimmate hold up pomts where rogue pellets can become stuck.
ADU Hot Oil Dryer Fire 17S22 Detection Systems for Lines 2 through S Grinder line 6 New of the void spaces while the customer contract was running a solid pellet.
Install system on each of lines 2-5 to provide early detection of fire at the hot This installation will improve safety by oil dryers by sensing excessive temperature.
providing automated response to a fire rather than relying on human detection.
17S23 Replacement Ram Bed Install a new ram bed on grinder line 6.
Eliminate obsolescence and operational issues, which were associated with the roll screw type ram bed assembly.
Installation Conversion Lines 2 Through 5 Dryers Fire 17S24 Detection Thermocouples Installation Install thermocouples on hot oil dryers 2, 3, 4 and S. The thermocouples are To add fire detection to the dryer area to to be used for fire detection. Also see CCF 17S22 for the electrical scope.
detect a hot oil fire.
Page 1S of 37 ISAID Clean Side Rod Area Components ISA-03 ADU Conversion ISA-08 Pelleting ISA-08 Pelleting ISA-03 ADU Conversion ISA-08 Pelleting ISA-03 ADU Conversion Location Non Fuel area behind WABA room Columbia Fuel Fabrication Facility (CFFF)
Conversion Decanter Lines Pellet Sintering Furnace SA ADU Pelleting Lines 1-6 Grinder Vibratory Feeder, Erbia Pelleting/Line 7 Grinder Vibratory Feeder ADU Lines 2-S Hot Oil Dryers and Hot Oil Room ADU Pelleting/Grinder Line 6 Conversion Dryers
2018 CCF Approved by Engineer for Startup Name Title 17525 Butler Building Roll up Door Replacement Description Replace and upgrade the Butler Building east side roll up door with 16'W X 12'H commercial grade roll up door.
17526 ADU Line 1 Calciner Install instrumentation and equipment related to the Line 1 Calciner and Safety Upgrades Phase II Scrubber upgrades.
17528 UCVS Skid Demobilization 17530 Demo FN961 Disconnect the UCVS skid electricity and mechanical components and package and ship.
Remove FN961 from roof to allow for installation of a new fan.
17531 FN961 Replacement Fan Install fan and replace VFD to control the fan.
Installation ADU Line 5 Dryer 17532 d
1 Replace dryer condenser on ADU line 5.
Con enser Rep acement Replace dryer 17533 condensers on ADU line Replace dryer condenser on ADU line 2.
2 Replace dryer condenser 17534 C0-126 on ADU line 1 Replace dryer condenser on ADU line 1.
Modification of Air Supply to Vacuum 17535 Mounted Portable Modify the air supply to the vacuum mounted portable vibrators on pellet Vibrators for ADU Bulk lines 1-5.
Feed Tanks (Pellet Lines 1-5)
ADU Sintering Furnace 1B,_1C, 2A, 2B, 2C, 3B, 17536 4A, 4B, 4C and 5B BPCS Mount and terminate power/network connections of BCPS and SIS back and SIS Control Back plates for furnaces.
plate Installation and Connection 17537 Met Lab Autoclave.
Power Feed Relocation Swap power feeds for Met Jab Autoclave Systems 1 and 2.
Justification Current door is not working.
The addition of these controls will provide defense-in-depth in the active engineered control systems for hydrogen deflagration mitigation.
The UCVS Skid was on Joan to CFFF from SRS/PNNL.
Existing fan and motor which makes up FN961 is oversized and has caused issues with the safety basis of the plant.
Existing fan is oversized for the application and can cause safety basis issues for the plant.
ISAID Grounds ISA-03 ADU Conversion ISA-03 ADU Conversion ISA-01 Plant Ventilation System ISA-01 Plant Ventilation System Obsolescence. Existing condenser is leaking. ISA-03 ADU Conversion Obsolescence.
Obsolescence.
To prevent continuous running of the vibrator, which can lead to compaction of the ISA-03 ADU Conversion ISA-03 ADU Conversion powder within the bulk container.
ISA-08 Pelleting Allow for pre-installation of the controls back plates to support future cutover of sintering furnaces.
ISA-08 Pelleting To determine if one of the two 80A breakers ISA-18 Laboratories is defective.
Page 16 of 37 Location Butler Building ADU Line 1 Calciner and Scrubber UF6 PAD Roof Roof ADU line 5 in Conversion ADU line 2 in Conversion ADU line 1 in Conversion ADU Pelleting Bulk Container Enclosures Lines 1-5 Chemical Area - Pelleting Chemical Area - Pelleting
2018 CCF Approved by Engineer for Startup Name Title Description Relocation of Power Feed for Pellet Line 5 17538 Dryer Oven and D&V Relocate power feed from Buss Duct 07C-07D to MCC-2223.
Hood Blowers Relocation of Power 17539 Feed for Pellet Line 6 Grinder and Laminar Relocate power feed from Buss Duct 07C-07D to MCC-2223.
Flow Hood Relocation of Power Feed for ADU Rod Line 1 17540 Girth Welder and Seal Relocate power feed from Buss Duct 07C-07D to MCC-2223.
Welder Move the stairs on the west side of Furnace 1A leading up to the mezzanine 17542 AD~ Furn~ce P_Lc Room to the West a minimum of 3".
Sta1r Mod1ficat1ons Demolition of Duct Work on old Map 17547 Control Room HVAC Demolish old HVAC ventilation in old MAP Control Room and install a blind on remaining old duct as noted on drawing. Install HVAC (split unit) for DCS System and Installation Controls Room (inside Auxiliary Control Room).
of a New HVAC System 17552 Line 3 Strong back Installation Fire Alarm Speaker Install 361FOSEQ18 strong back and 361FOSEQ19 Load Block Adaptor in the Line 3 Bulk Container room to replace the 66560 Strong back.
17554 Additions for 2nd Floor Add speakers to the 2nd Floor main office area.
Main Office Area IFBA Fire Alarm 17555 Speaker/Horns Additions URRS Fire Alarm 17556 Speaker/Horns Additions Add Fire Alarm Speaker/horns to JFBA Coater Power Supply Room and 3rd FL Tech Shop.
lnstall4 new speakers installed in series between two existing speakers.
Justification Obsolete Buss Duct and to address grounding and safety concerns with accessing buss duct cans.
Elimination of Buss Duct and to address grounding and safety concerns with accessing ISAID ISA-08 Pelleting buss duct cans.
ISA-08 Pelleting Elimination of Buss Duct and to address grounding and safety concerns with accessing d
buss duct cans.
ISA-10 ADU Ro s Heating Element Controls Cabinet and other 480V components are being relocated from beneath the furnace to the entrance of 11 ISA-08 Pe eting Furnace 1A directly across from the stair case leading up to the mezzanine in the Pelleting/Furnace Area.
A section of the Old MAP control room is being re-purposed for DCS Equipment operational area.
The 66560 strong back is one of our older ISA-03 ADU Conversion strong backs and does not meet a 5:1 Safety ISA-08 Pelleting Factor.
Fire Improvement Excellence Project.
Grounds Fire Improvement Excellence Project.
Grounds Fire Improvement Excellence Project.
Grounds Page 17 of 37 Location Chemical Side - Pelleting Chemical Side - Pelleting Chemical Side-ADU Rod Lines Chemical Side -
Pelleting/Furnace Area Mezzanine Chemical Side - Old MAP Control Room ADU Pelleting \\ Line 3 Bulk Container Room 2nd Floor Main Office Area Coater Power Supply Room and 3rd FL Tech Shop EPA Building and Outside URRS
2018 CCF Approved by Engineer for Startup Name Title ERBIA Chiller Cooling 17557 Tower Repairs Description Repair the leaking seams in the single cell ERBIA chiller cooling tower cold water basin.
17558 Cooling Tower Chemical Replace the existing cooling tower chemical controller with an advanced Treatment Upgrade model.
Still #1 and Still #2 1
h 1 Replace the existing cooling tower chemical controllers with an advanced 17563 Cooing Tower C emica model.
Treatment Upgrade Justification ISAID The cold water basin seams are leaking in the d
Groun s ERBIA coolmg tower.
To allow for a free chlorine residual to be maintained in the cooling tower to address Grounds the bio-growth.
The advanced controllers will allow for a free ISA-06 Chemicals Receipt, chlorine residual to be maintained in the cooling tower to address the bio-growth.
Handling and Storage Oxidation Oven Door 18001 Wire Rope Clips Substitution This CCF will allow the substitution of non-SSC wire rope clamps for oxidation 1
. h To rep ace parts or equipment w1t ISA-19 Hoods and Containment Equipment Room #1 18003 Chiller Cooling Tower Repairs ovens.
Repair the leaking seams in the Equipment Room #1 chiller cooling tower cold water basins.
Portable Ventilation for Attach portable vent1lat1on umt duct to the vent p1pe above one of the 18008 Incinerator Refractory h
1 quenc co umns.
Repair 18009 CCC-750A, Band C Replacement P-1015 Discharge Piping 18010 Pulsation Dampener Addition Tooling Office Door 18012 Installation Liquid scrap tanks V-18017 1006A/B Level Reduction Replace Dirty Dissolver Channels.
Add pulsation dampener to P-1015 discharge piping.
Add doorway to provide access to the ECG enclosure roof.
Decrease maximum level in liquid scrap tanks V-1006A/B.
components that meet the equivalency criteria for form, fit, and function The cold water basin seams are leaking in the Grounds Equipment Room #1 cooling towers.
To provide ventilation airflow and minimize ISA-01 Plant Ventilation airborne during refractory repair work inside System the incinerator chamber.
Equipment is 20+ years old and has issues with leaks.
Adding a pulsation dampener will reduce vibration and slug flow.
A doorway is a cost effective and safe way to access the roof.
Reduce the risk of tank overflows in V-1006A/B.
15A-04 Safe Geometry Dissolver ISA-11 Scrap Uranium Processing Grounds ISA-11 Scrap Uranium Processing Page 18 of 37 Location ERBIA Chiller Cooling Tower ERBIA Furnace Hot Weii-/-Cold Well Still #1 and Still #2 Cooling Tower For all oxidation oven Door Lifting Mechanisms. Includes Areas in Pelleting, Erbia, Conversion/Scrap Cage, URRS, andiFBA Equipment Room 1 Cooling Towers Incinerator Room URRS Scrap Cage Conversion Tool Room Office Scrap cage -Conversion
2018 CCF Approved by Engineer for Startup Name Title Description Justification
!SAID Conversion Wash 18018 Machine #2 Ventilation Modification Disconnect ventilation duct from Wash #2-and install a 4.. flexible articulating Operation needs another flexible articulating fume arm on to the ventilation duct. C172 fume arm for cream can acid fumes when lid is open.
ISA-11 Scrap Uranium Processing 18019 Modify front panel of ADU Scrap Lathe Change Thimble line 18020 thermal compensator air pressure supply 18021
~~vel transmitter on V-18022 UN bulk storage tank spill deflector Non Fuel Area 18023 Modifications 18025 Fire Pump House #1 Upgrades Modify front panel of ADU Scrap Lathe to make openings large enough to work in and have access for cleaning.
Change Thimble line thermal compensator air pressure supply.
Suggest Level transmitter 3051L3AAOFH2AAAM5 -as an alternate to level transmitter 3051L3AA4FH2AAAM5.
Install UN bulk storage tank spill deflector.
Set the requirements for a Pre-Approved Level 2 Modification that allows future work to be performed in the Non Fuel production area with an appropriate graded level of review and approval.
Upgrade the controller and replace the jockey pump for Fire Pump #1.
18026 Fire Pump #2 Upgrades Replace the existing fire pump controller for fire pump #2.
Replace CPVC piping with Cast Iron piping between header isolation valve 18027 CPVC Replacement on and the sintering furnace isolation valves.
Sintering Furnace 3 Modification of Conduit 18028 Run from Pelleting Area Modify the conduit routing between the Pelleting Area mezzanine main Mezzanine to Line 1 nitrogen header pressures switches.
Control Panels.
Incorporate TDR2851 with the pin stamp unit. This includes the addition of 7 18030 Addition of Hold Down hold down plates above the rails.
Plates to Pin Stamp Listed on Top 5 ADU Safety Hazards.
To eliminate end stop movement during the electrode set up.
The option of either transmitter is necessary due to the long lead time of 3051L3AA4FH2AAAM5. The transmitters are identical, except that one is flush mount and one has a four inch extension.
ISAc10 ADU Rods Clean Side Rod Area ISA-03 ADU Conversion The cover will prevent liquid from spilling ISA-02 Uranyl Nitrite Bulk over the dike wall if a tank or pipe line was to Storage Tanks leak.
The CFFF configuration management process allows for an appropriate graded level of review and approval for certain types of modifications.
The existing fire pump controller cannot be Components upgraded to accept the additional alarm Grounds points.
The existing fire pump controller cannot be upgraded to accept the additional NFPA 20 Grounds required alarm points.
The CPVC piping is not aligning with the cast ISA-08 Pelleting iron piping for Sintering Furnace 3C.
To permit removal of furnace 1A out-of-service control panel.
To prevent issues when tubes are getting loaded onto the rollers.
ISA-08 Pelleting Components Page 19 of 37 Location RE-1010 Conversion Wash Machine Near ADU pass through window and Scrap hood Near Dash pot Robot CL1-CL5, V-19 tank URRS outside UN bulk storage area Non Fuel area as marked on attached drawing Fire Pump House #1 Fire Pump House #2 Chemical Side-Pelleting Sintering Furnaces Pelleting Line 1 control pane l~
Pin Stamp
Name Title 18031 Installation of new pull tester in the Grid Area 18032 Final Assembly Wash Tank Replacement Chem Lab Moisture 18034 Hood Left Red Door Removal 18036 Fuel Rod Lathe Station Power Relocation 2018 CCF Approved by Engineer for Startup Description Update the arrangement drawing for the installation of the new pull tester.
Replace current 3 wash tanks with 2 new wash tanks. Upgrade anchoring and bracing to meet CSE Seismic requirements.
Justification Equipment upgrade for old pull tester.
To meet NPH CSE seismic requirements and mitigate tank reliability issues.
Remove Left Red Door from Moisture Hood Outside Chem Lab in response to CAPAL issue 1004882.
Injury occurred due to door.
!SAID Components ISA-17 Final Assembly ISA-18 Laboratories Relocate Power Feed for Rod Lathe Station from Buss Duct 07C-8D to MCC-2223.
Power Feeds are being relocated to eliminate ISA-lO ADU Rods use of Buss Duct.
18037 Relocation of CP-2280-D load from Buss Duct 07C-Refeed power from Buss Duct to MCC.
For LOTO access and reduced operator exposure to potential voltage excursion.
Grounds 07D to MCC-2223 d
1 Relocate power feed from Buss Duct07C-07D to MCC-2223.
18038 ADU Ro Line 1 Cont_ro Panel Power Relocation Relocation of power 18039 from Panel RP-6D at Buss Duct 07C-7D to MCC-2223 Relocation of Power 18041 Feed for Thermal Stability from Buss Duct 07C-07D to MCC2223.
Conversion HF spiking 18042 station enclosure modification.
Refeed power from Buss Duct to MCC.
Refeed power from Buss Duct to MCC.
Modify HF spiking station enclosure.
For LOTO access and reduced operator exposure to potential voltage excursion.
For LOTO access and reduced operator exposure to potential voltage excursion.
For LOTO access and reduced operator exposure to potential voltage excursion.
New valve beacon will not allow room for protective enclosure to be installed.
ISA-10 ADU Rods Grounds ISA-08 Pelleting ISA-03 ADU Conversion Set the requirements for a Pre-Approved Level 2 Modification that allows The CFFF configuration management process future work to be performed in the Skeleton area with an appropriate graded allows for an appropriate graded level of Clean Side Rod Area 18044 Skel~t~n Area Mod1f1cation level of review and approval.
review and approval for certain types of modifications.
Install a new sample valve on the Still1 bottoms line adjacent to the bottoms Current sample valve used is on the "hot" 18046 Still1 Bottoms Sample pH meter.
Valve Addition Plating Room Scrubber Replace stack on plating room scrubber with a backdraft style head and add 18048 k
I bb f
h Stac Rep acement expansion JOint to scru er an ex aust.
side of a cooling heat exchanger, creating a ISA-06 Chemicals Receipt, potential burn hazard when handling sample Handling and Storage bottles.
The plating room is at a slight negative pressure, and when the fan system is off, the backflow of air can bring fumes into the Components plating room.
Page 20 of 37 Location Next to SU3 spot welder Final Assembly Wash Pit Conversion outside Chem Lab Chemical Side-Pelleting Chemical Side-Pelleting Chemical Side-Pelleting Chemical Side - Pelleting Chemical Side - Pelleting Conversion HF spiking Skeleton assembly area Outside URRS/Still 1 Building Nickel plating room process ventilation stack Mechanical Roof Area
2018 CCF Approved by Engineer for Startup Name Title Description Justification ISAID We are no longer capable of generating Connections Installation 18050 1
Install connections for temporary boiler.
For Temporary Boi er sufficient steam to operate the plant due to Grounds boiler failures.
Fixed Window Door on 18051 QC Lab Hood #1 Replacement 400 HP Rental Boiler 18052 Connection and Operation Replace current lifting door with a fixed-cover for QC Lab hood 1.
The hood is out of service until replacement can be made.
Place into operation the 400 HP rental boiler under the rules and regulations Boiler #1 has failed due to a cracked weld in provided by 5C DHEC.
the feed water patch.
To keep up rod demand in TP BAR a vibratory ISA-18 Laboratories Grounds TP BAR Vibratory Feeder Install new TP BAR vibratory feeder.
18053 1 nsta II feed will expedite the process a loading Clean Side Rod Area 18054 TP BAR Modifications Incinerator 18055 Refractory/brick configuration 18056 Fire Water Tank #1 Replacement Set the requirements for a Pre-Approved Level 2 Modification that allows future work to be performed in the TP BAR production area with an appropriate graded level of review and approval.
Install incinerator refractory and brick to the new configuration.
Replace fire water tank #1 with a new tank of the same dimensions, and constructed in the same location as the current tank.
pellets.
The CFFF configuration management process allows for an appropriate graded level of review and approval for certain types of modifications.
The vendor is recommending an installation of the refractory and brick that will better support our process.
After comparing the cost of refurbishment versus replacement it was determined that replacement is the best option.
Existing ramp railing used for the original side Components ISA-13 Low Level Radioactive Waste Processing Grounds Modification to Packing 18058 k
1 Move the railings to the outer edges of ramp.
Doc 1 Ramp Ra1 mg loader is spaced for one set of side loader ISA-17 Final Assembly 18059 QC Lab Hood 1 Door Replacement wheels.
Replace current temporary fixed window with a 1/2" thick door on the Chern The new counterweight balance door will Lab QC Lab 1 Hood.
allow operators to open and close door to their preference.
Strap Marking Station Install, test, and startup a new strap marking station at the Laser #3 Grid 18063 Installation in Grid Build Build Station.
New strap marking station.
Stations at Laser #3 Fire Alarm Speaker 18069 Additions for 2nd Floor Add speakers to the 2nd Floor main office area.
Fire Improvement Excellence Project.
Main Office Area Page 21 of 37 ISA-18 Laboratories Components Grounds Location Outside near T-1143 QC Lab Hood # 1 Boiler House TP BAR TP BAR Incinerator Fire Water Tank #1 Packing area, Dock 1 -Side Loader Ramp QC Lab Within Bay A-Band 16-17 near Laser #3 2nd Floor Main Office Area
2018 CCF Approved by Engineer for Startup Name Title Descri~tion Justification Thermal Stability Oven Modify existing pyrometer calibration target block or use new target block.
18070 pyrometer calibration Current calibration block is not large enough target block for current setup.
modification 18071 Plant Air to New Feeder Add a plant air feed to TP BAR's new feeder.
To add a new separate branch off existing TP BAR plant air in area.
To provide ventilation air flow and minimize Portable Ventilation for airborne during packing removal and 18072 b
1 b
bb Attach portable ventilation unit duct to the base of Out of Service V-9165A/B 1
f 0 so ete Er ia Scru er
.d
.1
- d.
1 f
bb 1 S 9165 c eanout o the obsolete Erbia Scrubber 5-1 to prov1 e vent1 at1on unng c eanout o scru er vesse S-9165 C eanout 9165.
Loader #1,2, 4, 5, and 6 A fuel assembly loader allowed the Rod Pull 18073 Voltage Monitor Relay Install a voltage monitor relay on loader #1,2, 4, 5, and 6.
to advance on its own due to a voltage Installation excursion.
URRS LR-230 air line A valve was bumped open and an operator 18074 Remove air valve located on LR-230 offload.
was exposed to uranyl nitrate during an LR-valve removal 230 offload.
Equipment Room #1 18076 Chiller Replacement-Chillers #1 and #2 Demolish and replace Chillers #1 and #2.
Chillers #1 and #2 are centrifugal chillers that have refrigerant leaks.
ISAID ISA-08 Pelleting Components ISA-01 Plant Ventilation System ISA-17 Final Assembly ISA-02 Uranyl Nitrite Bulk Storage Tanks Grounds Boiler House #2 (North 18078 American Boiler House) Remove North American Boilers #1 and #2 and assoicated components.
The North American boilers are over 30 years d
old and have exceeded their usable life.
Groun s Demolition Replacement of the Water Vapor Generator Existing water vapor generator and furnace is replaced with model#
18079 and Furnace to the HTP40000A88.
Netzsch Thermal Analyzer Relocation of Power 18084 Feed for Pellet Line 3 Grinder and Dryer Oven Relocate power feed from Buss Duct 07E-07G to MCC-2215.
Relocation of Power Feed for Pellet Line 4 18085 d
d Relocate power feed from Buss Duct 07E-7G to MCC2215.
Grin er, Dryer Oven an Pellet V&V Hood Blower The replacement equipment is used to support the thermal analyzer to perform thermal analysis experiments on enriched uranium dioxide powder relevant to fuel pellet fabrication and performance.
Elimination of obsolete Buss Duct and to address grounding and safety concerns with ISA-18 Laboratories accessing buss duct cans.
ISA-08 Pelleting Elimination of obsolete Buss Duct and to address grounding and safety concerns with accessing buss duct cans.
ISA-08 Pelleting Page 22 of 37 Location Thermal Stability oven TP BAR Erbia/ Erbia Roof Final Assembly Rod Loader #1, 2, 4, 5, and 6 URRS outside at the LR-230 offload platform" Equipment Room 1 Boiler House #2 (North American Boiler House)
ERBIA Analytical Lab Contaminated Area-Pelleting Contaminated Area-Pelleting
2018 CCF Approved by Engineer for Startup Name 18088 18089 18090 Title Description Relocation of power feeds for AC13 fan and Relocate power feed from Buss Duct 07E-7G to MCC-2215.
pump Relocation of power feed for AC14 fan Relocate power feed from Buss Duct 07E-7G to MCC-2215.
Relocation and Addition Relocate 1087 Pump-Out and Safe Dissolver Pump Out PLC networks and of Network Connections
, add new network connection for both PLC's to Experion DCS system.
to SOLX Pump Out PLC s TP BAR Pressure Gage 18091 Addition to Vacuum Add pressure gage to vacuum pump suction TP BAR.
pump suction Replacement backfill station with a new manufacturer's dry scroll pump.
Oxide Coater #1 Helium Replace the existing 60HD vacuum pump at the Ox1de Coater #1 Helium 18092 Station Vacuum Pump Remove the upper handrail on the west and part of the north side of the Justification Elimination of obsolete Buss Duct and to address grounding and safety concerns with accessing buss duct cans.
Elimination of obsolete Buss Duct and to address grounding and safety concerns with accessing buss duct cans.
Current connection places the PLC's on the business LAN which is vulnerable to Jess attention (for outages) and also makes the system more vulnerable than other systems (that are located in the PCN).
Added pressure gage will help with understanding process.
The pump is obsolete.
The Line 1 pellet press structural platform framework has been analyzed by an outside Line 1 Pellet Press 1809S Structural Framework Modifications -Second Level Truss second level platform and replace it with a truss and replace some of the C-vendor and has been determined to be channel supporting the south and center of the platform floor with tube steel.
Thimble Tube Inspection Replace truss (12.. latter, item 5) located in the middle of lighting truss 18097 Lighting Truss Assembly assembly, with truss (6" latter) aluminum tube.
Modification structurally inadequate for current loading configuration.
The 6" truss is custom made to lower the height of the tray for shorter workers to access the gage safely.
The condensate sump pump for the A/C unit ISAID ISA-08 Pelleting ISA-08 Pelleting ISA-07 Solvent Extraction Components Components ISA-08 Pelleting Components Condensate Pump Replacement for A/C 18098 Unit Inside the Instrument Room Replace the condensate pump for A/C unit inside the Instrument Room.
inside the gamma monitor instrument room ISA-03 ADU Conversion has failed and it needs to be replaced.
Page 23 of 37 Location Contaminated Area-Pelleting Contaminated Area - Pelleting Contaminated Side-URRS SOLX TP BAR Oxide Coater #1 Pellet Press Line 1 Thimble Tube Inspection Gamma Monitor Instrument Room in UF6 Bay
2018 CCF Approved by Engineer for Startup Name Title Description 18099 Push Rail Removal from Remove the push rail on the automatic bulge carriages. Update drawing Skeleton Fixture 443F02EQ02.
Preheat Dl water supply 18102 for UCON wash station Add an in-line preheater to the Dl water feed line to the UCON washer.
Additional Guarding 18103 added around Grinder Line 6 and Line 7 /Erbia Changing 0-Ring Material and 18107 Dimensions for better utilization of the Laser Welder Door Chambers Add guard panels around the Pellet Transfer.
Change the current 0-Ring to a softer material for Laser 3-6 both A and B Chambers.
18108 Tube Cart Modification Provide for an alternate arrangement of the casters for supporting the cart.
New Lid Covers 18112 Installation on Dryer Install new covers on all five dryers.
Filters Justification ISAID This is needed to add a tray for instrumentation tubes per 443F02EQ12-TDR* Clean Side Rod Area 2912.
During winter months the temperature of the cold water is below the min allowable ISA-17 Final Assembly temperature.
To prevent pinch points.
There is leaking around the door chamber when the chambers are over-pressurized causing leakage.
The carts ;~re difficult to maneuver and put the operators at higher risks for strain injuries.
The existing lids have a high potential to fail and are not easily repairable.
ISA-20 ERBIA Components Components ISA-03 ADU Conversion 18113 Boiler Upgrade Install required piping connections that will be necessary to upgrade the CFFF The boilers are over 30 years old and have Grounds Connection Installation 18115 PE Lab Area Egress Lighting lnstallaton 18116 Computer Stand Replacement Final Assembly Area 18122 Trolley Contactors Replacement boilers.
Install Egress lighting in the PE Lab Area.
Replace Painted Computer Stand with New Ergotron Style Computer Pole and Arm.
Replace Obsolete Contactors with Smart-Move MSM-R in Trolleys in Final Assembly Area.
exceeded their usable life.
There is currently no egress lighting.
ISA-17 Final Assembly The current computer stand at the Tube Prep lathe has a potential concern for paint to get Components on tubes when moving them.
These contactors can no longer be obtained because they are obsolete.
ISA-17 Final Assembly Conversion Line 4 S-431 18124 bb 1
Replace S-431 scrubber on Conversion Line 4 with universal scrubber.
scru er Rep acement Installation of new scrubber.
ISA-03 ADU Conversion Page 24 of 37 Location Skeleton assembly area Final assembly area Grinder Line 6 and the Line 7 /Erbia grinder Laser Welders in Grids CFFF, Mechanical Side, Tube Handling Equipment Conversion lines 1, 2, 3, 4, and 5 Outside Pipe Bridge at URRS Still #1 PE Lab between Chem. Lab and IFBA Tube Prep Final Assembly Line 4 Conversion
2018 CCF Approved by Engineer for Startup Name Title Description Replace booster pump on furnace with equivalent manufacturer supplied 18125 Furnace Booster Pump booster pump.
Replacement Justification The recently installed boater pump was found to be mechanically bound.
11 Remove automatic damper and install VFD on Fan-993 in URRS Decon Cutting The existing Damper is worn out and is 18127 Fan-993 VFD lnsta aton Room.
obsolete.
18129 Riser Flow Switch Replacement for FS-11 Oxide Coater 1 18130 Computer Guard Rail Installation Emergency Lighting 18133 Replacement at Line 8 Tube Prep.
Replace a defective flow switch FS-11 in the Respirator Cleaning Facility.
Install a stainless steel guard rail at the backside of the HMI computer at Oxide Coater 1.
Replace the Emergency Lighting at Line 8 Tube Prep.
VSR-F is obsolete.
The guard rail will add protection to the computer from cart movement in the area.
Existing lighting is obsolete and has a risk of falling debris (FM E & Safety).
ISAID Components ISA-01 Plant Ventilation System Grounds Components Components 18134 Temporary Drain Install Hot Tap temp drains into pipe to assist in draining.
Assistance needed for draining chilled water. ISA-03 ADU Conversion Vibration Isolation for 18145 FN948A/B Incinerator Exhaust Fan ADU Conversion Line 4 18148 Calciner Seal Purge Modifications Fire Sprinklers 18153 Installation in Project Storage Building Add vibration isolation to the incinerator exhaust fans.
Relocate existing BPCS flow transmitters FT -409E and FT-409, install new BPCS flow transmitters on the secondary seal purge lines, replace existing gauges PI-409K and PI-409J, install four new BPCS transmitters to measure pressure on both primary and secondary seals, change purge pressure setpoints, and change purge pressure setpoints.
Install fire sprinklers in Project Storage Building.
18159 Roll up Door, UF6 Bay to Replace existing fabric rollup door (near the hot oil room) with a new steel Erbia rollup door.
Adding vibration isolation will prevent vibrations from the fan being transferred to other equipment.
To Improve operation of the calciner seals.
Meet site and NFPA requirements.
The existing roll up door does not function.
Booster Pump on VFS #
Replacing failed obsolete 2 HP motor with a new 3 HP motor that matches up The current motor on VFS # 2 has failed and 18160 2 Replacement w1th booster pump.
needs to be replaced.
Timing Belt Pulley and 18161 Actuators Cover Guard Installation Install cover guard over timing belt pulley and actuators on the pin-stamper unit in Tube Prep.
Safety Page 25 of 37 ISA-01 Plant Ventilation System ISA-03 ADU Conversion Grounds ISA-03 ADU Conversion Components Components Location GRID-FURN-IPSN Southwest Decon Cutting Room Respirator Cleaning Facility Tube Prep - Oxide Coater 1 Lighting around Tube Prep. Line 8
Chilled water in Conversion, nearTORIT Penthouse ADU Conversion Line 4 Calciner Project Storage Building Passage from UF6 bay into the Erbia area, adjacent to the hot oil room~
VFS # 2 vacuum booster pump Between Oxide Coater 1 and Line 9
2018 CCF Approved by Engineer for Startup Name Title Description Justification ISAID Location Plastic sheeting spill The plastic sheeting will prevent material f
d Install temporary plastic sheeting between wet drums and cylinder wash 18162 protection or wet rum d
k ptpmg an tan s.
from cylinder wash area from entering into a ISA-09 UF6 Cylinder Wash URRS cylinder wash trash~
18163 Grinder Relocation Discharge housing of Relocate the grinder equipment adjacent to its existing location within the tool room area.
18164 FN4025, Plating Room Install 3/8" diameter test port into discharge housing of FN4025, Plating Scrubber Fan Test Port Room Scrubber Fan.
Installation Conversion Scrap Cage 18165 Fume Capture Hood Install fume capture hood in Conversion Scrap Cage.
lnstallaton Conversion Scrap Cage 18166 Manual Wringer and Install manual wringer and stand in Conversion Scrap Cage.
Stand Installation Comfort Air Bag Filter Replace multi-pocket bag filters with 24x24x30, 6-Pocket, UL Classified, 90-18169 I
% tt*.
h" h ffi.
f"l Rep acement 95°o e tctent tg e tctency 1 ters.
Whole body monitor in 18170 Install the first whole body monitor in a temporary location.
PPE issue station Chem. Lab Mass Spec.
18171 #2 Power Monitor Removal Remove the power monitor from Mass Spec. #2 and connect power to directly to PP-3HB ckt. 7, 9, & 11.
18175 AC32 Filter Substitution Substitute pleated high capacity filter with 20x25x2, UL 900 Classified, consisting of polypropylene media.
New IFBA Roll Around 18176 Construct tool cart per attached drawmgs.
Carts Addition of Manual Pull 18178 Station, 3 ~make Detectors m Old Map (Auxiliary} Control Room Delay Timer Addition to Add manual pull station, 3 smoke detectors, -and remove abandoned Fire Map Alarm Panel.
18179 ADUCAL-913 for Lines 2-Add delay timer to ADUCAL-913 for Lines 2-5.
- 5.
55 gallon wet trash drums.
Existing grinder has reached its end of life and safety issue was raised due to the location of the existing grinder.
Existing fan has no discharge port to test the static pressure or flow conditions.
Operator exposure to fumes.
Wringer will reduce likelihood of operator exposures to acid.
Components Components ISA-11 Scrap Uranium Processing ISA-03 ADU Conversion Current vendor is not able to supply filters as Clean Side Rod Area needed.
The new whole body monitor will provide a more thorough scan of the individual's body. ISA-18 Laboratories
-The power monitor does not have settings that will prevent trips.
ISA-18 Laboratories Current vendor is not able to supply filters as needed.
Components New design for a coater tool cart, to support ISA-14 IFBA Processing coater operations.
To meet EHS requirements for allowing occupancy of room plus monitoring of electronic equipment in room for fire detection The current implementation results in false failure indication for seals (conservative}.
The change will improve the intended function of the control.
Grounds ISA-03 ADU Conversion Page 26 of 37 Tool Room Plating Room Scrubber system, mezzanine above plating room Scrap Cage by Washing process In Scrap Cage in Conversion~
AC Units in Non-Fuel, Final Assembly, Tool Shop, ADU Rod Area PPE issue station outside of men's main changing room Chem. Lab AC 32 Grid Area IFBA Coaters Chemical Side-Auxiliary Control Room (between SOLX and Bulk Blending Areas}
ADU Conversion Lines 2,3,4, and s
2018 CCF Approved by Engineer for Startup Name Title Description Justification ISAID Coater Insulator Design 18181 Create a new alternate msulator assembly des1gn.
Improvements To protect ground shields from direct line of ISA-14 IFBA Processing sight exposure.
Ultra-Sonic Generators 18184 and Transducers Replace ultra-sonic generators and transducers.
Replacement The system is down and we are not able to find enough working transducers.
Components 18185 Oxidation -Oven Filter Substitute filter with -high capacity pleated filter 24x24x2, UL 900 Classified.
Current vendor is not able to supply filters as ISA-19 Hoods and needed.
Containment 18193 CL1-ADUCAL-902 Flow verification ADUCAL-901 Install flow verification of N2 purge to satisfy ADUCAL-902 and install safety to ADUSCR-904 upgrade upgrades to migrate ADUCAL-901 to ADUSCR-904.
Obsolete Lockout Valve Upgrade required to satisfy NRC minor violation and self-reported violation.
ISA-03 ADU Conversion 18194 Replacement at Dock 1 Replace obsolete lockout valve at dock 1 fall protection platform.
Fall Protection Platform The lockout valve is no longer available from manufacturer.
Grounds Pellet Line 1 Sintering 18195 Furnace Hydrogen Supply Header Piping Section Replacement 18196 Valve Replacement on 2C Furnace IFBA Chiller Condenser Installation of the new section will provide a Replace a section of piping to provide a new connection point for Furnace 1A. new connection point for the furnace including an appropriate LOTO valve.
Replace valve on 2C Furnace with the current model.
manufacturer.
Valve series has been discontinued by the ISA-08 Pelleting ISA-08 Pelleting Water Pump Mechanical Replace the existing component mechanical seals on the IFBA chiller 18198 Seal and Check Valve condenser water pumps with a split mechanical seal.
The existing condenser pump check valves have failed in service, and do not shutoff to ISA-14 IFBA Processing Replacement reverse flow.
Replacement 18202 Rota meters for Nitrogen fl h
b.
1 Replace the rota meters for nitrogen flow on the thermo-stability furnaces.
ow on T ermo-sta 1 1ty Current nitrogen rota meters on System A and System B thermo-stability furnaces are obsolete.
ISA-08 Pelleting furnaces Replacement Rota meters for 18203 Hydrogen flow on Thermo-stability furnaces Current hydrogen rota meters on System A Replace the rota meters for hydrogen flow on the thermo-stability furnaces.
and System B thermo-stability furnaces are ISA-08 Pelleting obsolete.
Page 27 of 37 Location All Coaters RAM CO Grid Strap Cleaner on the Clean Side Grid Area Oxidation Ovens 1 and 2 Calciner Line 1 Dock 1 Location, Column 14F Pellet Sintering Furnace 1A Unload End ADU Sintering Furnace 2C IFBA Equipment (Chiller) Room Thermo-stability Furnaces near Team Managers offices Thermo-stability Furnaces near Team Managers offices
2018 CCF Approved by Engineer for Startup Name Title 220v power source for 18211 roof T1T2 reroofing project 18212 IFBA Pass Through Wall Hole Cover Installation Main Process Cooling 18215 Water Lines Plug/Cap Branches Description Providing service from MCC9400 with step-down transformer that can feed distribution panel outside the Erbia Platform.
Install cover over pass through hole in wall in IFBA.
Plug/Cap branches from Main Process Cooling Water Lines.
. bl Relocate the VFDs for the Sanitary Sumps from the Still 2 Control Room to 18216 Vana e Frequency h
11 b 'ld' t e St1 1 Ul 1ng.
Drives (VFDs) Relocation Modification of Grid 18217 Laser Gripper for Grid Tooling Compatibility Mody Grid Laser Gripper.
18219 Final Assembly Wash Pit Align tank blow off assemblies, cut ladder access plate in half and install air Punch List Items filter guard.
Obsolete URRS Dry 18221 Trash Scale Replacement Modification of Gripper Replace obsolete URRS Dry Trash Scale #1 WIC-1314A.
18223 Plungers to Reduce Modifiy gripper plungers.
Sticking 18224 Tumble Blender Replacement Replace the tumble blender in the bulk blending room.
ADU Line #2 Condenser Revise ADU Line #2 Condenser C0-226 Centrate Line from existing 1" to 2" 18228 C0-226 Centrate Line Revision pipe, to match other line configuration.
Justification Re-Roofing project vendor equipment requires 60amp 220V single phase.
Reduce amount of untreated air entering JFBA.
The potential for excessive water leaks will be prevented.
Safety arc fault concern swith the VFDs located in a high traffic area.
As part of the production implementation of the new 15x grid, the gripper jaws on grid ISAID Grounds ISA-12 IFBA Fuel Rod Manufacturing JSA-03 ADU Conversion Grounds laser -need to be modified so that they are Components compatible with the Top/Mid grid weld tooling.
To provide additional clearance between fuel assemblies from blow off assemblies, -reduce lift weight of the ladder access plate which is 1
bl ISA-17 Fina Assem y removed for inspections, calibrations, and pit cleaning and to protect the air filters from damage.
ISA-13 Low Level The existing scale has failed and is obsolete.
Radioactive Waste Processing It has been observed that the spring loaded plungers on the gripper jaws occasionally get Components stuck.
The existing tumble blender fails often and needs to be replaced with a unit that has been improved structurally.
Existing ADU Line #2 Condenser C0-226 ISA-05 ADU Bulk Powder Blending Centrate Line is 1" and has the potential for ISA-03 ADU Conversion causing carryover to the blower (FN-227).
Page 28 of 37 Location Erbia Platform on the Roof Dock 9 Chemical Side-Auxiliary Control Room Ceiling Still 2 Control Room and Still 1 building outside in URRS Grid Laser Welder Final Assembly Wash Pit Dry Trash Scales in UF6 Bay Laser X Chemical Side Bulk Blending Room Located on the main ground level between lines 1 and 3
2018 CCF Approved by Engineer for Startup Name 18229 Title Test Ports-Conversion Line #4 Calciner Scrubber (Confirmatory Order No. EA-16-173)
Chemical Side Description Install test ports upstream and downstream of the line #4 calciner scrubber.
18230 Instrument Lab Speaker Add speaker(s) to the Chemical Side Instrument Lab.
Additions Addition ofporta ble Eye 18231 h b Add a portable eye wash stat1on on the wall by hne 8 1n tube prep.
Was y Lme 8 Fiberglass Wrap 18232 Installation on T-46 in URRS 18233 Vent Fume Tank T-46 Replacement Replacement of FT-1030D in S-1030 Install fiberglass wrap on T-46 in URRS.
Replace vent fume tank T-46.
1823S Recirculation Flow Path Replace the UT strap-on instrument with a new instrument.
and renumbered toFT-S-1030-2 Wet Drum cover and 18238 wall to prevent unwanted SNM from entering drums~
18241 S-1008 Branch Installation MET Lab Scanning 18242 Electron Microscope Replacement Oxidation Oven 18243 Platform Temp Conduit Mod Install cover and wall at the wet drum scales to prevent any unwanted SNM from getting into the drums at that location.
Install branch in S-1008 for new washing process fume pick-up at new scrap cage washing machine.
Install a new SEM in the MET Lab SEM Room.
Temporarily add a section of flex conduit to permit installation of the oxidation oven platform.
Justification This modification supports completion of a commitment in Confirmatory Order No. EA-16-173.
Fire Improvement Excellence Project.
There is a hazardous waste drum with potential for splash in employee's eye.
Tank failed visual inspection.
Existing tank failed visual inspection.
ISAID ISA-03 ADU Conversion Grounds Components ISA-06 Chemicals Receipt, Handling and Storage ISA-06 Chemicals Receipt, Handling and Storage This instrument is being installed for ISA-01 Plant Ventilation evaluation to determine suitability for future System use in a Safety Significant Control.
The Cover and wall will prevent inadvertent ISA-13 Low Level leaking from the cylinder wash process into a Radioactive Waste wet trash collection drum.
Ammonia fume will need ventilation when ammonia laden filters are loaded into new washing process.
Old SEM is over 35 years old(outdated) and has passed its useful life.
Part of the CO project.
Processing ISA-01 Plant Ventilation System ISA-18 Laboratories ISA-19 Hoods and Containment Pellet Tray Casket Door The phenolic bearing have become difficult Replace the phenolic type bearing and slide assemblies with ball type beanng to operate over time and can cause the doors ISA-08 Pelleting 18246 Modification units.
to stick and jam.
Page 29 of 37 Location Calciner Line 4 Chemical Side Instrument Lab Tube Prep Line 8 Outside in URRS tank farm Outside in URRS tank farm Scrap Recovery/Conversion URRS bay next to cylinder wash In scrap cage by new washing process SEM Room Scrap cage oxidation oven CCF, Chemical Side, Pellet Tray transfer carts
Name Title Concrete Pad for 18249 Compressed Air Receiver 18251 Conversion Ramp Platform Modification Relocation of Pressure 18252 Differential Gauges and Associated Conduits 18253 Flange Guards FACTS Loop Installation V-1014A and V-1017A to 18254 V-1014C and V-1017C Level Transmitters Re-Tubing Pre-Approved Level 2 18256 Mod - Metallurgical Laboratory Description Excavate and pour a concrete pad.
Modify conversion ramp platform.
2018 CCF Approved by Engineer for Startup Justification For a new compressed air receiver tank and mist eliminator/filter.
To accommodate future roof membrane changes.
Rotate the gauges associated with the scrap cage oxidation ovens 180 deg to Part of the CO ro*ect.
permit reading from the platform.
p 1 Install Flange Guards FACTS Loop.
Safety Issue Identified for ISR8.
Re-tube level transmitters on V-1014A and V-1017A to V-1014C and V-1017C, Level indication will still be needed on V-V-1014A/B and V-1017A/B.
1014 and V-1017 tank banks.
The CFFF configuration management process Perform review, demolit ion, construction, and startup of plant modifications allows for an appropriate graded level of within the Metallurgical Laboratory (Met Lab).
review and approval for certain types of modifications.
Current design has the roller bearing support ISAID Grounds ISA-03 ADU Conversion ISA-19 Hoods and Containment ISA-18 Laboratories ISA-11 Scrap Uranium Processing ISA-18 Laboratories 18257 IFBA Coater 4 ~~lie ~
Modify the upper roller supports will move the rollers away from the Supports Mod1f1cat1on cathodes to the center space between cathode and top of t he coater.
arms (items 26 & 27} too close to cathodes ISA-14 IFBA Processing Conversion Line 1 S-131 182S8 bb 1
Replace S-131 scrubber on Conversion Line 1 with universal scrubber.
Scru er Rep acement 18259 UF6 Cylinder Scale Replacement Replace the UF6 Cylinder scale.
Bulk Container Feeders 18260 Allow for use of coated type vibrator for bulk container feeders.
Coated Vibrators Optical Pellet Measuring 18261 Install a pellet measuring system based on 2-D optical micrometers.
System 4/6.
Mechanical Integrity Engineering found two locations on S-131 below the Crit. allowable minimum of 0.114" during PM81506, 26 ISA-03 ADU Conversion Week Scrubber Tank Wall Thickness Measurement and External Inspection.
The vendor has recommend replacement.
ISA-03 ADU Conversion The new vibrator has improved force output ISA-05 ADU Bulk Powder compared to the previously used.
To reduce or eliminate observed operator variability for sintered density and grinder shape log measurements.
Blending ISA-08 Pelleting Page 30 of 37 Location Outside of Atlas Copco Compressor Room Conversion Roof Platform Scrap Cage oxidation ovens FACTS Loop Scrap Cage Metallurgical Laboratory IFBA Coater #4 ADU Conversion UF6 Cylinder Scale in UF6 Bay Bulk Blending Conversion Feeders which are used on ADU Bulk Containers Pellet Inspection Line 2 Pellet ing
2018 CCF Approved by Engineer for Startup Name Title Modify Tube Sensor 18262 Bracket Height at Tube Prep Repair Lathe Criticality Alarm Horn 18264 and Two Fire System Alarm Horns on Roof Relocation Description Addition of a permanent shim will be necessary to get the necessary height for the sensor bracket.
Relocate Criticality Alarm Horn L2B-8 which is locate on S-1030 scrubber platform.
18265 Ro~ Line 9 Blowout Remo.ve switch/gauge, solenoid valves (SV40 AND SV41), and tubing on the Switch/Gauge Removal Rod Lme 9 Blowout system.
Justification The height of the sensor bracket at the Tube Prep repair lathe needs to be adjusted to allow the sensor to be the proper height to see the tube.
The three horns will be moved so they are no longer attached to the beam that will be replaced. This will allow the beam to be easily replaced.
Switch/gauge and components are not used and will not be used in the future.
ISA ID Location Components Tube Prep Grounds On S-1030 platform east side.
Components Rod Line 9 P-3B Ammonia Transfer 18267 1
Replace existing P-3B with new pump & motor.
pump Rep acement JSA-06 Chemicals Receipt, Pump IS obsolete and condition is degrading.
- 1.
d URRS/Tank Farm Hand mg an Storage Power source for 18268 Roofing Project T2 Section Install a transformer and circuit breaker panel for distribution of power at the Roofing project vendor requires single phase Main Penthouse.
50A service.
Grounds S-4025 Plating Room 18269 Scrubber AHU Condensate Pump Replacement Nitric Acid Supply 18270 Header Blind Flange Replacement Replace S-4025 Plating Room Scrubber AHU Condensate Pump with a higher The existing condensate pump is undersized capacity unit.
and has had leakage issues.
Remove valve and replace blind on Nitric Acid Supply header at Conversion ADU Line 3 with blind flange.
Valve has been locked out for over a year, and is a potential leak path for Nitric Acid.
18271 Fume Capture Hood Modify the glove type that is currently being used for the Fume Capture Glove Type Modification hood.
The operators have a difficulat time re-inserting their hands into the current glove type.
18273 Manual Electr~de Gnnder Electncal 18275 line 3 Press Hopper &
Vibra-Fiuid Feeder Vibratory System Modifications~
Respirator Cleaning 18276 Facility Sump Pump Replacement Mechanical Side 18280 Bathrooms Speaker Additions Sintering Furnace 18281 Hydrogen Flow Meter Replacement Correct wiring to manual electrode grinder Modify Line 3 press hopper & feeder vibratory system.
Replace the submersible pump with new style submersible pump.
Add speakers to the Mechanical Side Bathrooms near Maintenance.
Install a 0-200 SCFH flow meter for hydrogen on the ADU pellet sintering furnace 4A.
The WABA/non-fuel manual electrode grinder is currently wired incorrectly for desired function.
To allow separate control of the hopper vibrator and feeder vibrator and alleviate vibratory issues with the remaining system.
Current sump pump is obsolete.
Fire Improvement Excellence Project.
Sintering of Erbia pellets requires 175 SCFH hydrogen flow through the saturator.
Page 31 of 37 Components JSA-03 ADU Conversion ISA-11 Scrap Uranium Processing Components ISA-08 Pelleting Grounds Grounds ISA-08 Pelleting Main Penthouse on the roof~
Above Plating room on Mezzanine Chemical Side, Conversion, front end of ADU Line 3 ADU Conversion Temporary Fume Capture Hood WABA-/-Non-fuel, Tool Room and Tube Prep Line 8 ADU Pelleting Line 3 R53 Press Floor Sump of the Respirator Cleaning Facility Bathrooms near Mechanical Maintenance area ADU Pelleting Line 4, Sintering Furnace 4A, Hydrogen process gas to saturator tank flow meter
2018 CCF Approved by Engineer for Startup Name Title Sintering Furnace 18282 Hydrogen Flow Meter Replacement Description Install a 0-200 SCFH flow meter for hydrogen on the ADU pellet sintering furnace 3C.
Operator Interface for h
b 1
d 1 rf f
- 11 b.d.
Replace t eo so ete mo e operator mte ace or St1 1 tur 1 1ty mon1tor 18286 Still 1 Turbidity Monitor with a newer model unit.
Replacement Oxide Coater #2 Argon 18289 Station Vacuum Pump Replacement Oxide Coater #1 Argon 18290 Station Vacuum Pump Replacement Replace the existing vacuum pump at the Oxide Coater #1 helium backfill station with a dry scroll pump.
Replace the existing vacuum pump at the Oxide Coater #1 Helium backfill station with a dry scroll pump.
18291 IFBA Coa~er #8 Install a solenoid valve on the vacuum roughing pump for actuation by the Automat1c Ballast Valve PLC as part of the vacuum cycle.
Justification Sintering of Erbia pellets requires 175 SCFH hydrogen flow through the saturator.
Existing unit is obsolete and unavailable.
The current pump is obsolete.
The current pump is obsolete.
Automation of manual relief function to facilitate vacuum cycle.
18292 Tube Prep Pinch Roller Clutch Improvement Specify similar type slip clutch that is improved from the current slip clutch to Current slip clutch allows pinch rollers to be used on the pinch rollers in Tube Prep.
continue to roll when it should be stopped creating football skid marks on tubes.
ISAID ISA-08 Pelleting ISA-06 Chemicals Receipt, Handling and Storage Components Components ISA-14 IFBA Processing Components 18293 Fire Pump House #1 Repairs Repair and bring fire pump house #1 up to code on items that we removed or Fire water pump house was damaged during damaged with removing the old Fire water tank.
removal of the old tank.
Grounds Upgrade Chemical 18294 Development Lab Hood Replace the existing CDL door with new security door.
and Door Restore to an operational condition as dictated by operations to include Security and a hood is required for ATF.
18296 Calc~ner Line 4 System Test1ng complete removal of all modifications to removing just valves and installing Testing is necessary for the CO.
blinds.
18299 S-1030 Ventilation Duct Cut approximately 4" hole on S-~030 vent duct on roof and install the 4" Sample Port Installation flange saddle sample ports over Jt.
Sample ports will be use to capture samples from the air that S-1030 pulls from the process areas.
Leak was identified near the Super Torit and D&V Station in the Pellet Area. Plastic will be ISA-18 Laboratories ISA-01 Plant Ventilation System ISA-01 Plant Ventilation System 18302 Pell~t Area Ceiling Leak Dramage Tarp Install temporary tarp/plastic sheeting to capture leaks from ceiling above SNM Area/Pellet Area in Bay Areas SOOF03AR11, SOOF03AR12, and SOOFOAR16; liquid will be drained from tarp/plastic sheet and routed to approved container.
used to capture water from roof leak to ISA-08 Pelleting prevent water from dripping in unwanted places in Pellet area and/or on SNM.
Page 32 of 37 Location ADU Pelleting Line 3, Sintering Furnace 3C, Hydrogen process gas to saturator tank flow meter Sti111 Building Oxide Coater 2 Oxide Coater 1 2nd floor IFBA vacuum pump area Tube Prep Pinch Rollers Fire Water Pump House #1 Chen Development Lab Conversion Calciner Line 4 S-1030 Vent Duct on the roof Pellet Area
Name Title 18303 Guarding for pellet transfer 18304 ECG Machine Fitting Replacment Test Ports for Conversion Line #2 2018 CCF Approved by Engineer for Startup Description Justification The modification will insure the nip points Modify current guarding on pellet transfer on Line 6 and Line 7 pellet transfer are guarded but give some space for robot.
operators to adjust the trays for the prox Either modify or change the pneumatic fittings on the ECG machine to stainless steel/plastic or leave the current fitting material on.
sensor to detect.
Some of the fittings are corroding.
18308 Calciner Scrubber Install test ports upstream and downstream of the line #2 calciner scrubber.
This modification supports completion of a commitment in Confirmatory Order No. EA-16-173.
(Confirmatory Order No.
EA-16-173}
Rupture Disk Replace existing obsolete over pressure rupture disk and holder with new 18312 Replacement and Argon d" k d h ld Backfill Interlock rupture IS an o er.
18314 Kitchen Water Heaters Installation Hydrogen Tank T-1408 18321 d"f" Piping Mo I 1cat10n Install new instantaneous water heaters and 208 vac circuits for heaters in kitchen.
Modify the piping associated with Pl1408 A on Hydrogen Tank T-1408.
Current model of rupture disk and holder are obsolete.
Existing water heater system is not functioning.
This modification is necessary in order to provide a vent path for future purging activities needed to remove T-1408 from service.
To provide area personnel with a visual ISAID ISA-08 Pelleting Components ISA-03 ADU Conversion Components Grounds ISA-01 Plant Ventilation System 18323 Televisions Installations Install Televisions for "Tableau/App-Space" throughout plant.
display of the status, of the area Key Process Grounds Indicators (KPis).
Equipment Room 3 Cooling Water Chemical 18324 p*.
Replace cooling water chemical treatment piping in equipment room 3.
Treatment 1pmg Replacement Oxidation Ovens 18326 Damper Relocation &
Inspection Access 18327 Stairwell Handrail Replacement 18332 Lab Testing related to CO Projects Relocate the two damper for the scrap cage oxidation ovens.
Replace handrail on stairways to the second floor office area in the old expansion.
Perform testing of samples materials taken from the off-gas systems at the Calciner slab tank efficiency samples (taken at the entrance and exit of the slab tanks) and S-1030 efficiency samples (taken at the entrance and exit of the S-1030).
The existing supply connection is improperly located and does not supply enough Grounds pressure.
Part of the CO project.
ISA-01 Plant Ventilation System Existing handrails are not per code and could
.b 1*
d f 11.
.d Grounds contn ute to a s 1p an a mc1 ent.
Part of the CO work.
ISA-01 Plant Ventilation System Page 33 of 37 location Line 6 and Line 7 pellet transfer ECG machine Conversion calciner line #2 Grid area age hardening furnaces Kitchen ADU Pelleting Hydrogen Moisturizer Tank on the thermal stability platform/mezzanine Plant Wide Equipment Room 3 Scrap Cage oxidation ovens Old expansion Erbia Lab and Chern Lab
2018 CCF Approved by Engineer for Startup Name Title Description Justification ISAID DI-Water tanks manway Add new gaskets as a substitution to the current selection for 01-Water tanks 18333 gaskets substitution T1361A & B, T1362A & B, T1363A & B.
Current neoprene gasket have been leaking.
Grounds Conversion Line 4 Off-18334 Gas Piping Heater Installation Install heater on conversion line 4 off-gas piping.
Substitutions for Non-1 Allow subst1tut1on of non-SSC valves and non-RMP covered system related 18336 SCC Va ves Non-RMP valves.
Covered System Valves The off-gas piping is having to be rodded out more frequently than before the heater was ISA-03 ADU Conversion removed.
It is common for the valve manufacturer to change part numbers so the identical part Grounds number is no longer available.
The addition of a whole body monitor is an Whole body monitor at Install the second whole body monitor in a temporary location to familiarize initial step in the process of aligning CFFF Grounds 18337 the Maintenance Step-the staff and the operators with the new technology.
with industry safety standards.
Off Pad Substitution for Non-SSC Substitute non-SSC electrical components using approved substitution 18340 I
. I C R p d
E ectnca omponents.
cntena on non-M covere systems.
Coater Wonderware PC 18342 d
Upgrade coater software platform.
Upgra e Oxide Coater 1 breaker 18343 1
Replace the current 6A breaker with 2 lOA breakers.
rep acement Oxide Coater 2 breaker 18344 1
Replace the current 6A breaker with 2 lOA breakers.
rep acement 18346 S~7159(1FBA Scrubber)
R~~lace current sight glass with new robust sight glass between pump and S1ght Glass Replacement p1p1ng of the bottom of S-7159(1FBA Scrubber).
Electrical components are subject to obsolescence as technology advances.
Obsolescence The 6A breaker is not the adequate size to allow for the pumps to function properly.
The 6A breaker is not the adequate size to allow for the pumps to function properly.
Current sight glass flange is broken and Area Components ISA-14 IFBA Processing Components Components Engineer would like to replace it with a more ISA-14 IFBA Processing robust design.
Page 34 of 37 Location URRS outside Dl-water conversion Calciner line 4 Plant wide Maintenance Step-Off Pad Plant wide Coater 1-8 Tube Prep Tube Prep Pipe between pump and bottom of S-7159
2018 CCF Approved by Engineer for Startup Name Title Description Satellite Oil Station Replacing existing three-phase electronic overloads with thermal overload 18347 electrical repair relays suitable for single-phase applications.
Disconnect and 18349 permanently remove Disconne~ and permanently remove the hydrogen saturator vessel T-1408 hydrogen saturator from service.
vessel T-1408 Removal 9 Temporary Monitoring 18352 II Install 9 temporary momtonng wells.
Wells lnsta ation Fire Pump House #1 183S3 Backflow Preventer Replacement Allow field alignment of the sintering furnace 18369 sight port with the corresponding hole in the pinwall brick Laser 4 Exhaust Ports 18370 Modification Remove and replace existing city water to fire system backflow preventer in Fire Pump House #1.
Modify drawing 361F02EQ27 sight port, Item 01, pipe to be mounted offset and/or at an angle to the Item 02 flange centerline.
Remove Laser Welder exhaust manifold that connects to the three ports from the chamber and cap off two of the ports and connect the exhaust directly to one of the ports on the chamber.
18371 PE Development Lab 3D Install the new 3D printer in the Product Engineering Development Lab.
Printer Installation Justification The existing electronic overloads are not suitable for single-phase applications.
Eliminate potential safety hazard by removing the hydrogen vessel from the manufacturing area.
To obtain groundwater samples.
Replacement parts are unavailable.
To allow flexibility for aligning the sight port with the field drilled brick port and/or brick ports that have shifted over time during sintering furnace heating/cooling cycles.
The manifold is collecting zirc material inside of it, that becomes a potential safety hazard concern.
New Printer.
Reduce the possibility of damage to HF feed ISAID Grounds JSA-08 Pelleting Grounds Grounds ISA-08 Pelleting Components ISA-18 Laboratories 18372 HF feed line to spiking stations #1 and #2.
Demo the lines to both spiking stations from the wall to the skids. Isolation valves will be installed at the wall.
line and exposure to employees during the ISA-03 ADU Conversion Pre-Approved Level 2 Modification Seeping CCF for Office, Set the requirements for future Pre-Approved Level 2 Modifications for demolition, construction, and startup of modifications performed in the demo of spiking station #2 containment pad.
The CFFF configuration management process allows for an appropriate graded level of 18374 Kitchen/Cafeteria, Non-Office areas, Kitchen/Cafeteria, non-production areas outside the main review and approval for certain types of Production Area manufacturing building, and overall electncal distnbution system (inside and modifications.
Locations, and Electrical outside).
Distribution System Page 35 of 37 Grounds location Satellite Oil Station in Chemical Maintenance Shop ADU Pellet Area Thermal Stability Platform West side of facility Fire Pump House #1 ADU Pelleting Sintering Furnaces Laser 4 Exhaust Ports PE Dev Lab In vaporization bay of conversion Office areas and Plant grounds
2018 CCF Approved by Engineer for Startup Name Title Description Replace Obsolete Trolley 18376 1
Replace the current obsolete trolley contactors.
Contactors Rep acement Kitchen Boiler 18378 Recirculating Pump Removal Level 0 CCF to remove Remove kitchen boiler recirculating pump in Equipment Room 1 and replace it with spool piece piping per FSS-003.
18380 unused shipping Remove shipping container C68.
container C68 Substitution of 18381 Storeroom Part 21079; Substitue new filter.
Plant Air Filter IFBA Coater 3 and 5 18386 Unused Brackets Removal Remove Unused Brackets from IFBA Coater 3 and 5.
FL-1363B Dl Water Tank 18389 1
Replace FL-1363B Dl water tank.
Rep a cement 18392 Obsolet~ Table Saw from Gnd Area Remove obsolete table saw from Grid Area.
Justification The contactors can no longer be obtained because they are obsolete.
The pump is obsolete and is not needed due
!SAID ISA-17 Final Assembly to the new installed in line water heaters in Miscellaneous the kitchen.
Shipping container C68 was originally placed for the use of the mechanical side high bay lighting project. The project is not active and as a result C68 is longer used.
Existing filter is obsolete and no longer available.
These brackets are unused and extend out into the transportation path of cart traffic creating a pinch hazard.
Existing Dl water carbon purifier FL-1363B has been taken out of service due to failed inspection.
Components 15A-14 IFBA Processing Grounds By removing this table saw, usable space will Components be added to the grid area.
Conversion Portable Create bracket to hold ventilation duct close to the opening of the crossover The bracket duct holder allow more space for ISA-01 Plant Ventilation 18398 Ventilation Duct Holder piping flapper while redding it out.
an operator to rod crossover pipe safely.
System Page 36 of 37 Location Final Assembly Equipment Room 1 Across the road from the Pavilion, outside the CAA Some air lines in the plant Coater 5 and Coater 3 Dl water Building Grid Manufacturing Conversion Scrubber Line 1-5
2018 CCF Approved by Engineer for Startup Name Title 2A Sintering Furnace's Saturator Bypass 18406 Solenoid Valve and Superpurge Rotameter Replacement IFBA Contaminated Description Replace 2A sintering furnace's saturator bypass solenoid valve and superpurge rotameter.
Waste Water line 18407 Add IFBA contammated waste water !me mpect1on port.
Inspection Port Additions Substitution; Pre-approved Substitution 18414 for flow Control valve in Substitute Storeroom Valve 63370 for the failed umt.
Conversion (lCV-105}
IFBA Coater #6 Door 18418 Seal 0-ring Duro meter Change the door o-ring hardness from 90D and 7SD.
substitution Subsequent Pre-Approved Control Valve 18421 for Conversion lines OS Substitute Storeroom Valve 63370 for the failed unit(s}.
Column level Control (LCV-xOS-x) 18430 Heat Trace Cable Substitution Change part number for heat trace cable.
Justification Solenoid valve replacement.
Existing contaminated waste water piping needs to be inspected. _EWO 821904.
The actuator for the existing valve is obsolete.
ISAID ISA-08 Pelleting ISA-14 IFBA Processing Components IFBA coater #6 has been unable to achieve an effective door seal.
ISA-14 IFBA Processing The actuator for the existing valve is Components obsolete.
Original Part number is no longer available.
Grounds Page 37 of 37 location ADU Pelleting line 2 Sintering Furnace Outside of IFBA on West side of building, next to the Dehumidification Train line 1 Conversion OS Column IFBA Coater #6 OS Columns on the Conversion lines Heat Tracing Plant wide