Summary Report of Open Generic Communication Projects as of 01-16-2019
ML19017A041
Person / Time
Issue date: 01/16/2019
From: Brian Benney
NRC/NRR/DIRS/IRGB
To:
Curran B
References
Download: ML19017A041 (3)


Text

Summary Report of Open Generic Communication Projects (As Of 01/16/2019)

Division of Inspection and Regional Support (Information in this report is provided for general informational purposes only and is subject to change without notice.)

(For additional information contact Bridget Curran (bridget.curran@nrc.gov)

CAC/EPIDS AGE CAC/EPIDS NUMBER TITLE AND

SUMMARY

(Mon) OPENED L2014-CRS- RIS RIS 2005-29 Rev 1 Anticipated Transients That Could Develop into More Serious Events 58 04/06/2014 0001 This RIS update is intended to clarify the guidance contained in previously issued RIS 2005-29. RIS 2005-29 was initially issued to discuss concerns with demonstrating that certain events would not escalate into more serious events.

L2017-CRS- IN Boiling-Water Reactor Dryout Indications Occurring During Normal Operation 18 07/28/2017 0046 This IN is intended to inform addressees of recent operating experience related to numerous dryout indications which occurred over multiple cycles at the Leibstadt Nuclear Power Plant (NPP), a BWR/6 in Switzerland.

L2017-CRS- RIS Electronic Signature Use for Medical Licensee Internal Documents Required by NRC Regulation 17 08/24/2017 0048 This RIS is intended to supply information to assist medical use licensees in complying with the current NRC requirements related to the use of electronic signatures in internal licensee electronic documents and to clarify what constitutes a signature on electronic documents that medical use licensees are required to sign and maintain.

L2017-CRS- RIS Reporting Requirements for Components Exported Under General License Provisions 16 10/03/2017 0004 This RIS is intended to clarify the reporting requirements for nuclear facilities and equipment as required by 10 CFR 110.54 and the International Atomic Energy Agency for the Application of Safeguards in the United States.

L2018-GEN- IN Evaluations Supporting Changes to Plant Configuration 10 03/29/2018 0000 This information notice is being issued to reiterate the need for comprehensive evaluations of configuration changes to structures, systems and components (SSC).

L2018-GEN- RIS Pre-Application Communication and Scheduling for Accident Tolerant Fuel Licensing Submittals 6 07/30/2018 0005 The staff has generated a list of questions regarding anticipated agency work in the area of accident tolerant fuels (ATF). This RIS will provide the venue for collecting that information.

L2018-GEN- IN Emergency Diesel Generator Excitation System Diode Failures 4 09/10/2018 0007 EDG excitation system diode failures continue to occur. This information notice is intended to inform addressees that these conditions can lead to demand/run failures and can adversely affect the ability of EDGs to perform their safety functions.

L2018-GEN- IN Independent Spent Fuel Storage Installations Inspection Findings 2 10/30/2018 008 This IN is intended to inform addressees of recent NRC inspection findings that have identified non-compliance with NUREGs and applicable codes and standards.

L2018-GEN- RIS Preparation and Scheduling of Operator Licensing Examinations 1 12/19/2018 0010 This RIS is intended to inform addressees of the NRC staffs need for updated information on project site-specific operator licensing examination schedules and on the estimated number of applicants planning to take operator licensing examinations. This information will help the NRC plan its resources more effectively.

Summary Report of Open Generic Communication Projects (As Of 01/16/2019)

Division of Inspection and Regional Support (Information in this report is provided for general informational purposes only and is subject to change without notice.)

(For additional information contact Bridget Curran (bridget.curran@nrc.gov)

CAC/EPIDS AGE CAC/EPIDS NUMBER TITLE AND

SUMMARY

(Mon) OPENED L2018-GEN- IN Operating Experience Regarding Flow-Accelerated Corrosion 1 12/19/2018 0012 Flow-accelerated corrosion (FAC) is an industry issue that was first recognized to be of significant concern at Surry in 1986. There continue to be FAC failures attributed to problems with the FAC monitoring program and its software that have caused reactor trips.

L2019-GEN- IN: Effective Cyber Security Practices for Consideration to Protect Digital Assets of Byproduct Materials 0 01/15/2019 0000 Licensees The purpose of this IN is to inform affected byproduct materials licensees of the results of an evaluation that was previously conducted by NRC staff of the potential need for cyber security requirements and of effective cyber security practices for licensees consideration. The INs enclosure will include the effective practices that provide the addressees information on contemporary cyber security issues related to the protection of digital assets, including those assets used to facilitate compliance with physical security requirements such as Title 10 of the Code of Federal Regulations (10 CFR) Part 37, Physical Protection of Category 1 and Category 2 Quantities of Radioactive Material.

Closed Generic Communication Projects Since Last Report Division of Inspection and Regional Support CAC/EPIDS NUMBER TITLE AND

SUMMARY

Date Opened Date Closed L2017- RIS Clarification of Visual Examination Requirements for Reactor Upper Heads 04/05/2017 12/10/2018 CRS-0040 to Detect Signs of Leakage This was issued as RIS 2018-06 on December 10, 2018.

L2018- RIS Clarification for Reporting Transactions to the National Source Tracking 01/25/2018 12/18/2018 CRS-0003 System Involving Encapsulated Bulk Material CANCELLED This RIS clarifies the National Source Tracking System (NSTS) Reporting requirements involving Category 1 or Category 2 sealed sources that a manufacturer identifies as bulk material.