Memorandum, Risk-Informed Decision-Making Phase 2 Report of the Office of Nuclear Reactor Regulation Risk-Informed Decision-Making Action Plan (CAC No. A11008)
ML19010A004
Person / Time
Issue date: 01/30/2019
From: Michael Orenak
Plant Licensing Branch II
To: Brian Mcdermott
Division of Engineering
Orenak M, 415-3229
Shared Package
ML19007A339 List:
References
CAC A11008
Download: ML19010A004 (3)


Text

January 30, 2019 MEMORANDUM TO: Brian J. McDermott, Deputy Director for Engineering Office of Nuclear Reactor Regulation THRU: Kathryn M. Brock, Deputy Director /RA/

Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Russell N. Felts, Deputy Director /RA/

Division of Risk Assessment Office of Nuclear Reactor Regulation Brian W. Smith, Deputy Director /RA/

Division of Engineering Office of Nuclear Reactor Regulation Jane E. Marshall, Deputy Director /RA/

Division of Safety Systems Office of Nuclear Reactor Regulation FROM: Michael D. Orenak, Project Manager /RA/

Plant Licensing Branch II-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation

SUBJECT:

REPORT REGARDING PHASE 2 OF THE OFFICE OF NUCLEAR REACTOR REGULATION RISK-INFORMED DECISION-MAKING ACTION PLAN (CAC NO. A11008)

This memorandum documents the completion of Phase 2 of the Office of Nuclear Reactor Regulation (NRR) Risk-Informed Decision-Making (RIDM) Action Plan (Action Plan). NRR staff developed the Action Plan in 2017, to continue advancing, for the operating reactor program, the NRR leadership vision to enhance the integration of risk information into the organizations decisionmaking practices and processes. While the enclosed report documents the closure of the 2017 Action Plan, efforts to achieve this vision continue as the U.S. Nuclear Regulatory Commission (NRC) progresses in its use or risk insights to evaluate and inform its regulatory applications and processes.

The Action Plan described a systematic, two-phased approach for implementing the NRR leadership vision for RIDM. Phase 1 of the RIDM Action Plan consisted of the analyses, evaluations, findings, and recommendations for enhancing the integration of risk information into NRRs decisionmaking activities. Phase 1 concluded with the issuance of a report in June 2018

B. McDermott that had recommendations for fostering a lasting cultural impact. During Phase 2, the staff obtained feedback on the Phase 1 recommendations through trial period activities, interviews, and surveys to determine how to implement the recommendations.

Phase 2 culminated in the formalizing of a licensing review approach that increases collaboration between risk analysts and traditional engineering technical reviewers, the development of a systematic, graded approach for expanding the use of risk insights within the existing NRC regulatory framework, the creation of training modules for use during the upcoming rollout of improved guidance documents and procedures, and a foundation for the continued advancement of NRC and industry risk-informed initiatives and for enhanced communication and awareness of RIDM activities and opportunities amongst NRC staff and external stakeholders. Ongoing Action Plan activities for developing and improving procedures, guidance, and training are available in NRRs ticketing system.

The enclosures to this memorandum provide specific Phase 2 results. Specifically, Enclosure 1 provides the report of the NRR staffs efforts regarding Phase 2. Enclosure 2 summarizes the action items captured as NRR tickets. Enclosure 3 describes the Integrated Review Team (IRT) process. Enclosure 4 summarizes the NRR staffs recommendations for process improvements outside of the scope of Phase 2. Enclosure 5 provides background on the development of the tickets in Enclosure 2 for improvements to other NRR processes and the recommendations in .

There are several ongoing initiatives in the Operating Reactor Business Line that will complement the staffs latest progress and expand the concepts developed in the Action Plan beyond operating reactor licensing. These initiatives will reinforce the expectation to use risk insights holistically at the early stages of regulatory activities to more efficiently guide the staffs efforts, improve communications, and achieve consistency to advance the application of RIDM beyond the nuclear reactor safety program.

As the staff monitors its success in completing the objectives of the RIDM Action Plan, it will continue its efforts to enhance the integration of risk information into the organizations decisionmaking practices and processes to improve the technical basis for regulatory activities, increase efficiency, and improve effectiveness. It is anticipated that NRR staff will continue to build upon the momentum and behaviors fostered throughout the Action Plan development and execution by embracing a transformative mindset that seeks continual improvement towards the additional safety and efficiency gains afforded by RIDM.

If you have any questions, please feel free to contact me.

Enclosures:

1. Final Report of RIDM Project Phase 2
2. RIDM Phase 2 Tickets
3. Revised IRT Process Based on Lessons Learned from Trial Period
4. Recommendations for Process Improvements and Other Actions Outside the Scope of RIDM Phase 2
5. Recommendations for Process Enhancements

Package ML19007A339; Memo - ML19010A004; Encl 1 - ML19002A364; Encl 2 - ML19008A089; Encl 3 - ML19007A355; Encl 4 - ML19008A038; Encl 5 - ML19008A065 *via e-mail OFFICE NRR/DORL/LPL2-1/PM NRR/DORL/LSPB/LA NRR/DORL/DD NRR/DRA/DD NAME MOrenak JBurkhardt KBrock RFelts DATE 1/29/19 1/25/19 1/30/19 1/30/19 OFFICE NRR/DE/DD NRR/DSS/DD NRR/DORL/LPL2-1-PM NAME BSmith JMarshall MOrenak DATE 1/30/19 1/30/19 1/30/19