ML19008A118

From kanterella
Jump to navigation Jump to search
Transmittal of Changes to Emergency Plan
ML19008A118
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 01/04/2019
From: Bezilla M
FirstEnergy Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
L-18-296
Download: ML19008A118 (2)


Text

FENOC' RrstEnergy Nuclear Operating Company Mark B. Bezilla Vice President, Nuclear January 4, 2019 L-18-296 ATTN: Document Control Desk United States Nuclear Regulatory Commission WasJ1ington, D.C. 20555-0001

SUBJECT:

Davis-Besse Nuclear Power Station, Unit 1 Docket Number 50-346, License Number NPF-3 Changes to Davis-Besse Nuclear Power Station Emergency Plan 5501 North State Route 2 Oak Harbor. Ohio 43449 419-321-7676 10 CFR 50, App. E 10 CFR 50.54(q) 10 CFR 72.4

. The purpose of this letter is to transmit Revision 33 to the Davis-Besse Nuclear Power Station (DBNPS) Emergency Plan. The DBNPS Emergency Plan, Revision 33, contains changes to ERO positions, relocation of the Operations Support Center, elimination of pagers, verbiage updates for drill objectives, and updated Letters of Agreement with local agencies. The DBNPS Emergency Plan, Revision 33 changes did not require NRC approval.

In accordance with the requirements of 10 CFR 50.54(q), Revision 33 to the Emergency Plan does not result in a reduction in effectiveness of the Emergency Plan, as changed, and continues to satisfy the applicable requirements of 10 CFR 50.47(b) and 10 CFR 50, Appendix E. The DBNPS Emergency Plan, Revision 33 was effective December 6, 2018. Therefore, in accordance with 10 CFR 50.4(b)(5), the DBNPS hereby submits the aforementioned DBNPS Emergency Plan as Enclosure A A summary of the changes to the DBNPS Emergency Plan are included in the Emergency Plan Revision 33 (Enclosure A), "Summary of Plan Changes," and in the 10 CFR 50.54(q) Screen/Evaluation in Enclosure B.

There are no regulatory commitments contained in this letter. If there are any questions or if additional information is required, please contact Mr. James M. Vetter, Emergency Response Manager, at (419) 321-7393.

Sincerely, 1/Jfi/!J Mark 8. Bezilla gae/jcs

Davis-Besse Nuclear Power Station, Unit 1 L-18-296 Page 2 of 2 Enclosure(s):

A. Davis-Besse Nuclear Power Station Emergency Plan, Revision 33 B. Davis-Besse Nuclear Power Station Emergency Plan, Revision 33, 10 CFR 50.54(q) Screen / Evaluation cc: ~egional Administrator, NRC Region Ill Director, Office of Nuclear Material Safety and Safeguards DB-1 NRC Senior Resident Inspector DB-1 NRC/NRR Project Manager; w/o Endosure Emergency Response Coordinator, NRC Region Ill; w/o Enclosure, with CD Utility Radiological Safety Board; w/o Enclosure