ML18352A935
| ML18352A935 | |
| Person / Time | |
|---|---|
| Site: | Vallecitos Nuclear Center, 07000754, 07001220, Vallecitos |
| Issue date: | 12/17/2018 |
| From: | Heckman D GE-Hitachi Nuclear Energy Americas |
| To: | Document Control Desk, Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation |
| References | |
| M180219 | |
| Download: ML18352A935 (1) | |
Text
HITACHI M180219 December 17, 2018 US Nuclear Regulatory Commission Attn:DocwnentControiDesk Director, Office of Nuclear Reactor Regulation Director, Office of Nuclear Material Safety and Safeguards Washington, DC 20555-0001
Subject:
Vallecitos Nuclear Center (VNC) Organization Change
References:
1 - License R-33, Docket 50-73 (NTR) 2-License TR-1, Docket 50-70 (G ETR) 3-License DR-1 0, Docket 50-183 (EVESR) 4-License DPR-1, Docket 50-18 (VBWR) 5 - SNM 960, Docket 70-754 6-SNM 1270, Docket 70-1220 GE Hitachi Nuclear Energy David J. Heckman Regula lory Affairs & Ucenslng Lead 6705 valleciiOS Rd SIM'lOI, CA 94586 USA T 925 918 6116 Davld.heckman1 @ge.com Pursuant to Technical Specification (TS) 6.6.2.b of Reference 1, this required 30-day written report is to inform the NRC of a permanent change in facility organization.
Effective November 30, 2018, Mr. Jeffrey Smyly is the VNC Manager, Regulatory Compliance for GE-Hitachi Nuclear Energy Americas, LLC. Pursuant to TS 6.1.2.4, Mr. Smyly replaces Mr.
Juan Ayala, who has been acting in this position since December 27, 2017. Mr. Jeffrey Smyly is a US Citizen and can be reached at (925) 918-6116.
References 2 through 6 do not contain specific reporting requirements related to this organizational change but are listed here for completeness.
If you have any questions regarding this change, please contact me at (925) 918-6116.
r:;_;J;I__
David J. Heckman, Regulatory Affairs and Licensing Lead Commitments: None cc:
Jack Parrott - NRC, NMSS Project Manager Duane Hardesty-NRC, NRR Project Manager Osiris Siurano - NRC, NMSS Project Manager DJH 18-002